New Caney ISD Pine Valley Middle School
22784 US Highway 59 22784 US Highway 59, Porter, TX, 77365
New Caney ISD Pine Valley Middle School is a renovation/alteration project at 22784 US Highway 59 22784 US Highway 59, Porter, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.5M across about 5,040 sq ft.
- Estimated project value
- $2.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,040 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $496/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
15 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
51 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
71 days after the preceding date shown.
Source: TDLR filing
View source record
📰About New Caney ISD Pine Valley Middle School
New Caney ISD Pine Valley Middle School is the subject of a $2,500,000 renovation and alteration project located at 22784 US Highway 59 in Porter, Texas. The scope of work is defined as an interior renovation and refresh spanning 5,040 square feet of the existing facility. This project is registered with the Texas Department of Licensing and Regulation (TDLR) under the accessibility filing system.
The owner of record is New Caney Independent School District, which has listed DLR Group as the design firm for this specific renovation. The registered accessibility specialist for the project is William T Winning. The filing indicates that the project involves public funds and public land, consistent with its status as a school district facility in Montgomery County.
Construction Timeline and Status
TDLR completed the plan review phase in April 2026. According to the filing, construction was scheduled to begin in May 2026 with a completion date of August 2026. Although this scheduled completion date has passed, TDLR has not yet recorded a final inspection. Consequently, the current state of the site is not confirmed in the public record, and no final operational status can be verified through the TDLR data.
The estimated cost of $2,500,000 results in a computed cost of $496 per square foot. This figure is above the county median of $85 per square foot for renovation and alteration projects. The scheduled build window of 71 days is close to the county median of 92 days for similar filings in Montgomery County.
New Caney Independent School District has six other TDLR-registered projects in the region, totaling approximately $94 million, including facilities in New Caney and Porter. DLR Group, the design firm, has six other registered projects totaling over $54 million across various Texas locations. The project is situated in an area with a population of about 43,025 and a median household income of $96,093, according to U.S. Census estimates for ZIP code 77365. The area includes neighboring businesses such as Dickey's Barbecue Pit and the Valley Ranch recreation center.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77365 (Porter)
One email per change. Unsubscribe in one click. Privacy.
New Caney ISD Pine Valley Middle School is a Renovation/Alteration project located at 22784 US Highway 59 22784 US Highway 59, Porter, TX 77365 in Porter, Texas. The project has an estimated value of $2.5M covering 5,040 sq ft. New Caney Independent School District is the property owner and DLR Group is the design firm of record. The project was registered with TDLR on March 17, 2026.
Frequently Asked Questions
Is the Pine Valley Middle School renovation finished?
TDLR has not yet recorded a final inspection. The scheduled completion date was August 2026, but the public record does not confirm the current status of the site or its readiness for occupancy.
Who is the design firm for this project?
DLR Group is the design firm of record for the New Caney ISD Pine Valley Middle School renovation. They are responsible for the architectural and design aspects of the interior refresh.
What is the estimated cost per square foot?
The estimated cost is $2,500,000 for 5,040 square feet, resulting in a computed rate of $496 per square foot. This is above the median cost per square foot for similar projects in Montgomery County.
Is the project located in a flood zone?
It is designated as zone X on the FEMA National Flood Hazard Layer.
What type of work is being performed?
The filing describes the work as a renovation and alteration. Specifically, the scope includes interior renovation and an interior refresh of the existing school facility.
What is New Caney ISD Pine Valley Middle School?
New Caney ISD Pine Valley Middle School is a renovation/alteration project at 22784 US Highway 59 22784 US Highway 59 in Porter, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation, interior refresh.
Is New Caney ISD Pine Valley Middle School open in Porter?
New Caney ISD Pine Valley Middle School was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is New Caney ISD Pine Valley Middle School located?
New Caney ISD Pine Valley Middle School is located at 22784 US Highway 59 22784 US Highway 59, Porter, TX, 77365, in Montgomery County.
Who is the owner or developer of New Caney ISD Pine Valley Middle School?
New Caney Independent School District is the property owner/developer of record for New Caney ISD Pine Valley Middle School, per its TDLR project registration.
Who is the architect or design firm for New Caney ISD Pine Valley Middle School?
DLR Group is the design firm of record for New Caney ISD Pine Valley Middle School, according to its TDLR filing.
How much does New Caney ISD Pine Valley Middle School cost and how big is it?
New Caney ISD Pine Valley Middle School has an estimated construction value of $2.5M and approximately 5,040 square feet (about $496/sqft), based on its TDLR filing.
Scope of Work
Interior renovation, interior refresh.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
22784 US Highway 59 22784 US Highway 59, Porter, TX, 77365
Related Projects
Same Owner
$534.1M totalNearby Projects
Within 1 kmWatch all construction in 77365 (Porter)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Porter?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.