Duncanville, TX - Restroom Refresh
250 W.Highway 67, Duncanville, TX, 75137
Duncanville, TX - Restroom Refresh is a renovation/alteration project at 250 W.Highway 67, Duncanville, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $315K across about 1,350 sq ft.
- Estimated project value
- $315K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,350 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $233/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
18 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
45 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
29 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Duncanville, TX - Restroom Refresh
Costco Wholesale is renovating its Duncanville location at 250 W. Highway 67. The filing, titled "Duncanville, TX - Restroom Refresh," describes a renovation and alteration project covering 1,350 square feet of the facility. The estimated cost for this specific scope of work is $315,000. This project is privately funded on private land for private use, with Costco Wholesale Corporation listed as the owner of record.
The scope of work includes the removal and replacement of fixtures and finishes, along with specific accessibility improvements. MG2 Architecture Corporation is the design firm of record for this project. Justin K. Walton is the registered accessibility specialist associated with the filing. The project was registered with TDLR in March 2026, and construction was scheduled to start in the same month.
Project Status and Timeline
TDLR completed plan review in May 2026. The filing indicates a scheduled completion date of June 2026. However, TDLR has not yet recorded a final inspection. Because the final inspection is not on record, the current state of the site is not confirmed in the public record. The status remains "Review Complete," but the physical completion of the work is not verified by the state registry.
In Dallas County, the median estimated cost for similar renovation and alteration filings is $249,000. This project's cost of $315,000 is above that county median. The median size for these projects is 4,226 square feet, while this project is 1,350 square feet. The median cost per square foot in the county is $72. This project's computed cost of $233 per square foot is above the county median. The scheduled build window of 92 days is close to the county median of 92 days.
Costco Wholesale Corporation has six other TDLR-registered projects totaling $3,805,000. These include locations in Georgetown, San Antonio, Pflugerville, and Prosper. MG2 Architecture Corporation has six other TDLR-registered projects totaling $324,170,000. These include large-scale projects in Haltom City, Fort Worth, Katy, and Southlake. The Duncanville project is one of several recent filings by these entities across the region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75137 (Duncanville)
One email per change. Unsubscribe in one click. Privacy.
Duncanville, TX - Restroom Refresh is a Renovation/Alteration project located at 250 W.Highway 67, Duncanville, TX 75137 in Duncanville, Texas. The project has an estimated value of $315K covering 1,350 sq ft. Costco Wholesale Corporation is the property owner and MG2 Architecture Corporation is the design firm of record. The project was registered with TDLR on March 19, 2026.
Frequently Asked Questions
Is the Costco in Duncanville open?
The TDLR record does not confirm business operations. It shows construction was scheduled to finish in June 2026, but a final inspection has not yet been recorded. You cannot verify the store's opening status from this construction filing alone.
What is the address of the project?
The project is located at 250 W. Highway 67, Duncanville, TX 75137. This is the address listed on the TDLR filing for the restroom refresh and accessibility improvements.
Who is the design firm?
MG2 Architecture Corporation is the design firm of record for this project. Justin K. Walton is the registered accessibility specialist listed in the filing.
What is the estimated cost?
The estimated cost for the renovation and alteration work is $315,000. This covers the removal and replacement of fixtures, finishes, and accessibility improvements for 1,350 square feet.
What is Duncanville, TX - Restroom Refresh?
Duncanville, TX - Restroom Refresh is a renovation/alteration project at 250 W.Highway 67 in Duncanville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE WORK INCLUDES THE REMOVAL AND REPLACEMENT OF FIXTURES AND FINISHES ALONG WITH ACCESSIBILITY IMPROVEMENTS.
Is Duncanville, TX - Restroom Refresh open in Duncanville?
Duncanville, TX - Restroom Refresh was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Duncanville, TX - Restroom Refresh located?
Duncanville, TX - Restroom Refresh is located at 250 W.Highway 67, Duncanville, TX, 75137, in Dallas County.
Who is the owner or developer of Duncanville, TX - Restroom Refresh?
Costco Wholesale Corporation is the property owner/developer of record for Duncanville, TX - Restroom Refresh, per its TDLR project registration.
Who is the architect or design firm for Duncanville, TX - Restroom Refresh?
MG2 Architecture Corporation is the design firm of record for Duncanville, TX - Restroom Refresh, according to its TDLR filing.
How much does Duncanville, TX - Restroom Refresh cost and how big is it?
Duncanville, TX - Restroom Refresh has an estimated construction value of $315K and approximately 1,350 square feet (about $233/sqft), based on its TDLR filing.
Scope of Work
THE WORK INCLUDES THE REMOVAL AND REPLACEMENT OF FIXTURES AND FINISHES ALONG WITH ACCESSIBILITY IMPROVEMENTS.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
250 W.Highway 67, Duncanville, TX, 75137
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$2.7M totalWatch all construction in 75137 (Duncanville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Duncanville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.