Costco #664 E. Plano, TX - Sand Separator Relocation

3800 N Central Expressway, Plano, TX, 75074

Opening ~Mar 2027Project Registered

Costco #664 E. Plano, TX - Sand Separator Relocation is a renovation/alteration project at 3800 N Central Expressway, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $50K across about 20 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
20 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.50K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
29 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 4, 2026118 days across supplied datesMar 2, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    89 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Costco #664 E. Plano, TX - Sand Separator Relocation

Costco #664 E. Plano, TX - Sand Separator Relocation

Costco Wholesale is undertaking a renovation at 3800 N Central Expressway in Plano, Collin County. The project, filed as Costco #664 E. Plano, TX - Sand Separator Relocation, involves relocating an existing sand separator to the building exterior. The scope includes 20 SF of interior work at the receiving core, installation of a new underground sand separator, and pavement reconstruction at the drive. The estimated cost is $50,000.

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in November 2026. Plan review is pending and completion is targeted for March 2027. Construction is scheduled to begin in February 2027. This is a privately funded project on private land for private use. The registered accessibility specialist for this filing is Justin K Walton.

MG2 Architecture Corporation serves as the design firm of record. The owner and developer of record is Costco Wholesale Corporation. The total square footage for the interior work portion is 20 sq ft. The scheduled build window is 29 days, which is shorter than the county median of 92 days for renovation/alteration projects. The estimated cost of $50,000 is below the county median for its type.

Costco Wholesale Corporation has six other TDLR-registered projects totaling $1,125,000. These include locations in Southlake, Richmond, Lubbock, The Woodlands, and Tomball. MG2 Architecture Corporation has six other TDLR-registered projects totaling $3,960,000. These include the Edged - DFW Data Center in Irving and several other Costco locations.

The ZIP code 75074 has a population of about 53,146. The median household income is $84,185. There are 19,362 housing units in the area. The median owner-occupied home value is $347,300. Housing is an even mix of owner- and renter-occupied. Collin County unemployment rate in September 2026 was 4.1 percent.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75074 (Plano)

One email per change. Unsubscribe in one click. Privacy.

Costco #664 E. Plano, TX - Sand Separator Relocation is a Renovation/Alteration project located at 3800 N Central Expressway, Plano, TX 75074 in Plano, Texas. The project has an estimated value of $50K covering 20 sq ft. COSTCO WHOLESALE CORPORATION is the property owner and MG2 Architecture Corporation is the design firm of record. The project was registered with TDLR on November 4, 2026.

Frequently Asked Questions

Is the Costco in Plano open?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project is targeted for March 2027.

Who is the owner of this project?

Costco Wholesale Corporation is the owner and developer of record for this renovation project in Plano.

What is the scope of work?

The work includes relocating an existing sand separator to the building exterior, 20 SF of interior work at the receiving core, a new underground sand separator, and pavement reconstruction at the drive.

Who is the design firm?

MG2 Architecture Corporation is the design firm of record for this project.

When does construction start?

Construction is scheduled to begin in February 2027, with completion targeted for March 2027.

What is Costco #664 E. Plano, TX - Sand Separator Relocation?

Costco #664 E. Plano, TX - Sand Separator Relocation is a renovation/alteration project at 3800 N Central Expressway in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Relocation of existing sand separator to building exterior: 20 SF interior work at the receiving core, new underground sand separator, and pavement reconstruction at the drive.

Is Costco #664 E. Plano, TX - Sand Separator Relocation open in Plano?

Costco #664 E. Plano, TX - Sand Separator Relocation is still under construction in Plano, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Costco #664 E. Plano, TX - Sand Separator Relocation located?

Costco #664 E. Plano, TX - Sand Separator Relocation is located at 3800 N Central Expressway, Plano, TX, 75074, in Collin County.

Who is the owner or developer of Costco #664 E. Plano, TX - Sand Separator Relocation?

COSTCO WHOLESALE CORPORATION is the property owner/developer of record for Costco #664 E. Plano, TX - Sand Separator Relocation, per its TDLR project registration.

Who is the architect or design firm for Costco #664 E. Plano, TX - Sand Separator Relocation?

MG2 Architecture Corporation is the design firm of record for Costco #664 E. Plano, TX - Sand Separator Relocation, according to its TDLR filing.

How much does Costco #664 E. Plano, TX - Sand Separator Relocation cost and how big is it?

Costco #664 E. Plano, TX - Sand Separator Relocation has an estimated construction value of $50K and approximately 20 square feet (about $2.50K/sqft), based on its TDLR filing.

Scope of Work

Relocation of existing sand separator to building exterior: 20 SF interior work at the receiving core, new underground sand separator, and pavement reconstruction at the drive.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3800 N Central Expressway, Plano, TX, 75074

Loading location map…
33.04491, -96.70001

Watch all construction in 75074 (Plano)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.