Project intelligenceTDLR TABS2026015499Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Longview ISD HS Renovations

201 E. Tomlinson Pkwy, Longview, TX, 75605

Opening ~Sep 2026Review Complete

Longview ISD HS Renovations is a renovation/alteration project at 201 E. Tomlinson Pkwy, Longview, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2026. The project has an estimated value of $8.0M across about 8,000 sq ft.

Estimated project value
$8.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 19, 2026195 days across supplied datesSep 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    12 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    152 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75605 (Longview)

One email per change. Unsubscribe in one click. Privacy.

Longview ISD HS Renovations is a Renovation/Alteration project located at 201 E. Tomlinson Pkwy, Longview, TX 75605 in Longview, Texas. The project has an estimated value of $8.0M covering 8,000 sq ft. Longview ISD is the property owner and GLS is the design firm of record. The project was registered with TDLR on March 19, 2026.

Frequently Asked Questions

What is Longview ISD HS Renovations?

Longview ISD HS Renovations is a renovation/alteration project at 201 E. Tomlinson Pkwy in Longview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation & Addition to High School Cafeteria Dining Room under existing roof & renovation of RR throughout.

Is Longview ISD HS Renovations open in Longview?

Longview ISD HS Renovations is still under construction in Longview, TX, with an estimated completion of Sep 2026 according to its TDLR registration.

Where is Longview ISD HS Renovations located?

Longview ISD HS Renovations is located at 201 E. Tomlinson Pkwy, Longview, TX, 75605, in Gregg County.

Who is the owner or developer of Longview ISD HS Renovations?

Longview ISD is the property owner/developer of record for Longview ISD HS Renovations, per its TDLR project registration.

Who is the architect or design firm for Longview ISD HS Renovations?

GLS is the design firm of record for Longview ISD HS Renovations, according to its TDLR filing.

How much does Longview ISD HS Renovations cost and how big is it?

Longview ISD HS Renovations has an estimated construction value of $8.0M and approximately 8,000 square feet (about $1.00K/sqft), based on its TDLR filing.

Scope of Work

Renovation & Addition to High School Cafeteria Dining Room under existing roof & renovation of RR throughout.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

201 E. Tomlinson Pkwy, Longview, TX, 75605

Location by street address

Watch all construction in 75605 (Longview)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Longview?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.