Alcon FWN BFS Lines
Alcon FWN BFS Lines is a renovation/alteration project at 6201 South Freeway, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $3.3M across about 13,845 sq ft.
๐Project Metrics
TDLR #TABS2026015515Review Complete
Design review complete, construction may proceed
Alcon FWN BFS Lines is a Renovation/Alteration project located at 6201 South Freeway, Fort Worth, TX 76134 in Fort Worth, Texas. The project has an estimated value of $3.3M covering 13,845 sq ft. Alcon Laboratories is the property owner and EwingCole, Inc is the design firm of record. The project was registered with TDLR on March 20, 2026.
โFrequently Asked Questions
What is Alcon FWN BFS Lines?
Alcon FWN BFS Lines is a renovation/alteration project at 6201 South Freeway in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing space within an aseptic manufacturing facility for installation of new product filling lines and associated packaging equipment.
Is Alcon FWN BFS Lines open in Fort Worth?
Alcon FWN BFS Lines is still under construction in Fort Worth, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is Alcon FWN BFS Lines located?
Alcon FWN BFS Lines is located at 6201 South Freeway, Fort Worth, TX, 76134, in Tarrant County.
Who is the owner or developer of Alcon FWN BFS Lines?
Alcon Laboratories is the property owner/developer of record for Alcon FWN BFS Lines, per its TDLR project registration.
Who is the architect or design firm for Alcon FWN BFS Lines?
EwingCole, Inc is the design firm of record for Alcon FWN BFS Lines, according to its TDLR filing.
How much does Alcon FWN BFS Lines cost and how big is it?
Alcon FWN BFS Lines has an estimated construction value of $3.3M and approximately 13,845 square feet (about $238/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing space within an aseptic manufacturing facility for installation of new product filling lines and associated packaging equipment.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 20, 2026
Review Complete
Apr 1, 2026
Inspection Complete
Closed
12d
Review duration