1713 Remodel
1713 Remodel is a renovation/alteration project at 1713 Troup Highway, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $100K across about 3,267 sq ft.
๐Project Metrics
TDLR #TABS2026016515Review Complete
Design review complete, construction may proceed
1713 Remodel is a Renovation/Alteration project located at 1713 Troup Highway, Tyler, TX 75701 in Tyler, Texas. The project has an estimated value of $100K covering 3,267 sq ft. Genecov Investments Ltd is the property owner and Acheson Architecture is the design firm of record. The project was registered with TDLR on April 1, 2026.
โFrequently Asked Questions
What is 1713 Remodel?
1713 Remodel is a renovation/alteration project at 1713 Troup Highway in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing commercial space.
Is 1713 Remodel open in Tyler?
1713 Remodel is currently under construction in Tyler, TX. Its current TDLR status is "Review Complete".
Where is 1713 Remodel located?
1713 Remodel is located at 1713 Troup Highway, Tyler, TX, 75701, in Smith County.
Who is the owner or developer of 1713 Remodel?
Genecov Investments Ltd is the property owner/developer of record for 1713 Remodel, per its TDLR project registration.
Who is the architect or design firm for 1713 Remodel?
Acheson Architecture is the design firm of record for 1713 Remodel, according to its TDLR filing.
How much does 1713 Remodel cost and how big is it?
1713 Remodel has an estimated construction value of $100K and approximately 3,267 square feet (about $31/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing commercial space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 1, 2026
Review Complete
Jun 20, 2026
Inspection Complete
Closed
80d
Review duration