Project intelligenceTDLR TABS2026017506New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 99(CSJ: 3510-04-069, ETC.) in Houston, TX

From: Fry Road To: Westheimer Pkwy, Houston, TX, 77494

Opening ~Nov 2028Review Complete

SH 99(CSJ: 3510-04-069, ETC.) is a new construction project at From: Fry Road To: Westheimer Pkwy, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2028. The project has an estimated value of $14.1M across about 155,529 sq ft.

Estimated project value
$14.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
155,529 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$90/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 13, 2026947 days across supplied datesNov 15, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    203 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    731 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SH 99(CSJ: 3510-04-069, ETC.)

TxDOT District: Houston is building new frontage roads, ramps, bridges, illumination, signing, and pavement markings along State Highway 99 in Houston under the filing CSJ: 3510-04-069, etc. The project spans the stretch from Fry Road to Westheimer Parkway in ZIP code 77494. This new construction effort involves an estimated cost of $14,072,310 and covers a total area of 155,529 sq ft.

The construction timeline begins in November 2026 and is scheduled to finish in November 2028. TDLR completed the plan review for this filing in April 2026, confirming the status as Review Complete. The registered accessibility specialist for the project is Frank Fonseca, and the design work was performed by TEDSI Infrastructure Groupe.

Project Scale and Cost Context

With a calculated cost of $90 per square foot, this project's unit cost is close to the Harris County median of $88 for similar new construction filings. However, the total estimated cost is above the county median for this type of work, placing it in the top quarter of comparable projects. The scheduled build window of 731 days is longer than the county median of 219 days, reflecting the complexity of the infrastructure upgrades.

This roadway improvement is part of a broader portfolio managed by TxDOT District: Houston. The owner has six other TDLR-registered projects in the area, totaling $413,553,685. These include significant developments in Katy, Friendswood, and Galveston, all of which have completed their plan review stages. The current project stands out due to its substantial scale and specific focus on highway accessibility and safety features.

Local Area and Funding

The project is located in a ZIP code with an estimated population of about 130,920 people. Census data for this area indicates a median household income of $144,444 and a median owner-occupied home value of $420,100. Housing in this region is predominantly owner-occupied, with approximately 42,520 housing units recorded. The construction site is in Harris County, where the unemployment rate was 5.4 percent in June 2026, higher than the figure from a year earlier.

Funding for this work involves public funds, public land, or Federal support, consistent with its status as a Federally funded roadway project. The filing was registered with TDLR in April 2026, establishing the compliance framework for the upcoming construction phase that starts in late 2026.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77494 (Houston)

One email per change. Unsubscribe in one click. Privacy.

SH 99(CSJ: 3510-04-069, ETC.) is a New Construction project located at From: Fry Road To: Westheimer Pkwy, Houston, TX 77494 in Houston, Texas. The project has an estimated value of $14.1M covering 155,529 sq ft. TxDOT District: Houston is the property owner and TEDSI Infrastructure Groupe is the design firm of record. The project was registered with TDLR on April 13, 2026.

Frequently Asked Questions

When will the SH 99 frontage road project be finished?

Construction is scheduled to finish in November 2028. Work is set to start in November 2026, giving a total build window of approximately two years for the new roads, ramps, and bridges.

Who is the design firm for this TxDOT project?

TEDSI Infrastructure Groupe is the design firm of record for this project. They are responsible for the engineering plans that have already completed the TDLR plan review process in April 2026.

What is the estimated cost of the construction?

The estimated cost for the new frontage roads, ramps, and bridges is $14,072,310. This figure covers the entire scope of work from Fry Road to Westheimer Parkway in Houston.

Is the business or road currently open?

The project is in the pre-construction phase. Construction is scheduled to begin in November 2026, so the new facilities are not yet built or operational. The TDLR status is Review Complete.

What is SH 99(CSJ: 3510-04-069, ETC.)?

SH 99(CSJ: 3510-04-069, ETC.) is a new construction project at From: Fry Road To: Westheimer Pkwy in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of frontage roads, ramps, bridges, illumination, signing and pavement markings.

Is SH 99(CSJ: 3510-04-069, ETC.) open in Houston?

SH 99(CSJ: 3510-04-069, ETC.) is still under construction in Houston, TX, with an estimated completion of Nov 2028 according to its TDLR registration.

Where is SH 99(CSJ: 3510-04-069, ETC.) located?

SH 99(CSJ: 3510-04-069, ETC.) is located at From: Fry Road To: Westheimer Pkwy, Houston, TX, 77494, in Harris County.

Who is the owner or developer of SH 99(CSJ: 3510-04-069, ETC.)?

TxDOT District: Houston is the property owner/developer of record for SH 99(CSJ: 3510-04-069, ETC.), per its TDLR project registration.

Who is the architect or design firm for SH 99(CSJ: 3510-04-069, ETC.)?

TEDSI Infrastructure Groupe is the design firm of record for SH 99(CSJ: 3510-04-069, ETC.), according to its TDLR filing.

How much does SH 99(CSJ: 3510-04-069, ETC.) cost and how big is it?

SH 99(CSJ: 3510-04-069, ETC.) has an estimated construction value of $14.1M and approximately 155,529 square feet (about $90/sqft), based on its TDLR filing.

Scope of Work

Construction of frontage roads, ramps, bridges, illumination, signing and pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: Fry Road To: Westheimer Pkwy, Houston, TX, 77494

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77494 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.