Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Kirkpatrick Drive Phase 2 in Weatherford, TX
365 Kirkpatrick Drive to Bethel Rd (1884), Weatherford, TX, 76086
Kirkpatrick Drive Phase 2 is a new construction project at 365 Kirkpatrick Drive to Bethel Rd (1884), Weatherford, in Parker County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $150K across about 17,000 sq ft.
- Estimated project value
- $150K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 17,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $9/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
12 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
4 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
337 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Kirkpatrick Drive Phase 2
The City of Weatherford is installing sidewalks and curb ramps on both sides of a new roadway segment along Kirkpatrick Drive, extending from the existing street to Bethel Road. This new construction project covers 17,000 square feet of public infrastructure in Parker County. The total estimated cost for this phase is $150,000, which works out to $9 per square foot.
Kimley-Horn and Associates, Inc. serves as the design firm of record for this roadway improvement. Ross A Thomas is the registered accessibility specialist responsible for the project's compliance with state standards. The work involves public funds and public land, marking it as a Federally funded roadway project under Texas Department of Licensing and Regulation oversight.
Timeline and Regulatory Status
TDLR completed plan review in April 2026 and construction is scheduled to finish in April 2027, with work starting April 2026. The project was registered with TDLR in April 2026, and the current status is Review Complete. This timeline aligns with the filing details provided by the City of Weatherford, which lists the completion date as April 2027.
Within Parker County, this project’s estimated cost sits in the bottom quarter of new construction filings. The median estimated cost for similar projects in the county is $800,000, while this project is significantly lower at $150,000. The median size for new construction in the area is 7,215 square feet, making this 17,000-square-foot project larger than the county median.
Third-party sources provide additional context on the project’s visibility. A listing on the City of Weatherford official website identifies Kirkpatrick Drive Phase 2 among current projects. Construction Bid Source notes a bid date of February 3, 2026, for the project with owner reference 2026-006. ConstructConnect describes the work as site work and paving for a mixed-use development in Weatherford, Texas.
The City of Weatherford has several other TDLR-registered projects, including the Dr. Paul Phillips Water Purification Plant and Weatherford City Hall. Kimley-Horn and Associates, Inc. has also worked on multiple projects in Mobeetie, such as retail and guest services facilities.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76086 (Weatherford)
One email per change. Unsubscribe in one click. Privacy.
Kirkpatrick Drive Phase 2 is a New Construction project located at 365 Kirkpatrick Drive to Bethel Rd (1884), Weatherford, TX 76086 in Weatherford, Texas. The project has an estimated value of $150K covering 17,000 sq ft. City of Weatherford is the property owner and Kimley-Horn and Associates, Inc. is the design firm of record. The project was registered with TDLR on April 14, 2026.
Frequently Asked Questions
Who is building Kirkpatrick Drive Phase 2?
The City of Weatherford is the owner of record. Kimley-Horn and Associates, Inc. is the design firm, and Ross A Thomas is the registered accessibility specialist.
When will the project be finished?
Construction started in April 2026 and is scheduled to finish in April 2027. TDLR completed plan review in April 2026.
How much does the project cost?
The estimated cost is $150,000. This is below the median estimated cost for new construction projects in Parker County.
What is the scope of the work?
The scope includes installing sidewalks and curb ramps on both sides of a new roadway segment between Kirkpatrick Drive and Bethel Road.
What is Kirkpatrick Drive Phase 2?
Kirkpatrick Drive Phase 2 is a new construction project at 365 Kirkpatrick Drive to Bethel Rd (1884) in Weatherford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installing sidewalk and curb ramps on both sides of a new roadway.
Is Kirkpatrick Drive Phase 2 open in Weatherford?
Kirkpatrick Drive Phase 2 is still under construction in Weatherford, TX, with an estimated completion of Apr 2027 according to its TDLR registration.
Where is Kirkpatrick Drive Phase 2 located?
Kirkpatrick Drive Phase 2 is located at 365 Kirkpatrick Drive to Bethel Rd (1884), Weatherford, TX, 76086, in Parker County.
Who is the owner or developer of Kirkpatrick Drive Phase 2?
City of Weatherford is the property owner/developer of record for Kirkpatrick Drive Phase 2, per its TDLR project registration.
Who is the architect or design firm for Kirkpatrick Drive Phase 2?
Kimley-Horn and Associates, Inc. is the design firm of record for Kirkpatrick Drive Phase 2, according to its TDLR filing.
How much does Kirkpatrick Drive Phase 2 cost and how big is it?
Kirkpatrick Drive Phase 2 has an estimated construction value of $150K and approximately 17,000 square feet (about $9/sqft), based on its TDLR filing.
Scope of Work
Installing sidewalk and curb ramps on both sides of a new roadway.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
365 Kirkpatrick Drive to Bethel Rd (1884), Weatherford, TX, 76086
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$81.1M totalWatch all construction in 76086 (Weatherford)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Weatherford?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.