Infinx
Infinx is a renovation/alteration project at 4516 Seton Center Parkway Suite 160, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $133K across about 2,463 sq ft.
๐Project Metrics
TDLR #TABS2026017786Review Complete
Design review complete, construction may proceed
Infinx is a Renovation/Alteration project located at 4516 Seton Center Parkway Suite 160, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $133K covering 2,463 sq ft. BR Lakeside Office Owner is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on April 16, 2026.
โFrequently Asked Questions
What is Infinx?
Infinx is a renovation/alteration project at 4516 Seton Center Parkway Suite 160 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demising existing suite and remodeling space for new tenant.
Is Infinx open in Austin?
Infinx is still under construction in Austin, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is Infinx located?
Infinx is located at 4516 Seton Center Parkway Suite 160, Austin, TX, 78759, in Travis County.
Who is the owner or developer of Infinx?
BR Lakeside Office Owner is the property owner/developer of record for Infinx, per its TDLR project registration.
Who is the architect or design firm for Infinx?
S. Tipton Studio is the design firm of record for Infinx, according to its TDLR filing.
How much does Infinx cost and how big is it?
Infinx has an estimated construction value of $133K and approximately 2,463 square feet (about $54/sqft), based on its TDLR filing.
๐Scope of Work
Demising existing suite and remodeling space for new tenant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 16, 2026
Review Complete
May 7, 2026
Inspection Complete
Closed
21d
Review duration
๐Related Projects
๐คSame Owner
$814K total๐๏ธSame Design Firm
$2.5M total๐Related City Permits
Building permits found at or near this location
Interior finish out for suite 380 demised under 2026-057381 PR and 2026-062627 BP. No work was done in 380 besides the demising wall under previous permit. It was left in a shell state. No access control scope included.
Interior finish out for suite 380 demised under 2026-057381 PR and 2026-062627 BP. No work was done in 380 besides the demising wall under previous permit. It was left in a shell state. No access control scope included.
Interior alteration of existing space (Suite 360 approx 6508) (Suite 365 approx 1083) and new D wall to create Suite 380 (approx 2179 sf) Floor 3
irrigation for lawn
irrigation for lawn 2026-059590 BP