Project intelligenceTDLR TABS2026017998New Construction
Funding type

This project is privately funded, on private land for private use.

Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) in Midlothian, TX

4100 Kimble Road, Midlothian, TX, 76065

Target date passed (Oct 2026)Review Complete

Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) is a new construction project at 4100 Kimble Road, Midlothian, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $50K across about 10,000 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$5/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 1, 2025579 days across supplied datesOct 1, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    412 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    133 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street)

Lakesong Thoroughfares is a new construction project in Midlothian, Texas, focused on site accessibility improvements. The work covers 10,000 square feet of exterior space at 4100 Kimble Road. Construction started in March 2025 and is scheduled to finish in October 2026. The project is privately funded on private land for private use.

The scope of work includes sidewalks, accessible routes, curb ramps, pedestrian ramps, landings, and detectable warnings. These improvements are necessary to comply with the Texas Accessibility Standards (TAS) and the Americans with Disabilities Act (ADA).

Project Team and Registration

HC GPM LLC is the owner and developer of record. Graham Associates Incorporated serves as the design firm. Bonita L Anderson is the registered accessibility specialist for the project. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in April 2026. TDLR completed the plan review in May 2026. The current status is Review Complete.

The estimated cost for this project is $50,000. At 10,000 square feet, the cost per square foot is $5. This figure is below the county median for new construction filings in Ellis County, which stands at $148 per square foot. The estimated cost is also in the bottom quarter of the 925 new construction filings in the county, where the median cost is $900,000.

The scheduled build window for this project is 579 days. This is longer than the county median build window of 244 days for similar projects. HC GPM LLC has five other TDLR-registered projects in Midlothian, each with an estimated cost of $50,000. Graham Associates Incorporated also has five other registered projects in the area with the same estimated cost.

Midlothian is part of ZIP code 76065, which has a population of about 44,614 people. The median household income in this area is $123,664. The median owner-occupied home value is $378,604. Housing in the area is predominantly owner-occupied. The Ellis County unemployment rate was 4.5 percent in July 2026, which is higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76065 (Midlothian)

One email per change. Unsubscribe in one click. Privacy.

Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) is a New Construction project located at 4100 Kimble Road, Midlothian, TX 76065 in Midlothian, Texas. The project has an estimated value of $50K covering 10,000 sq ft. HC GPM LLC is the property owner and Graham Associates Incorporated is the design firm of record. The project was registered with TDLR on April 17, 2026.

Frequently Asked Questions

Is Lakesong Thoroughfares open for business?

The TDLR record shows construction is scheduled to finish in October 2026. There is no information confirming the facility is open or operating. The status reflects construction progress, not business operations.

Who is building the accessibility improvements in Midlothian?

HC GPM LLC is the developer of record. Graham Associates Incorporated is the design firm. Bonita L Anderson is the registered accessibility specialist overseeing the project for TDLR compliance.

What is the estimated cost of the project?

The estimated cost is $50,000. This is below the Ellis County median of $900,000 for new construction filings. The cost per square foot is $5, which is significantly lower than the county median of $148.

When did construction start and when will it end?

Construction started in March 2025. The project is scheduled to finish in October 2026. TDLR completed plan review in May 2026, and the current status is Review Complete.

What specific accessibility features are being installed?

The scope includes sidewalks, accessible routes, curb ramps, pedestrian ramps, landings, and detectable warnings. These exterior improvements are required to comply with TAS and ADA standards for site accessibility.

What is Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street)?

Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) is a new construction project at 4100 Kimble Road in Midlothian, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site accessibility improvements including sidewalks, accessible routes, curb ramps, pedestrian ramps, landings, detectable warnings, and related exterior improvements necessary to comply with TAS and ADA

Is Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) open in Midlothian?

Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) located?

Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) is located at 4100 Kimble Road, Midlothian, TX, 76065, in Ellis County.

Who is the owner or developer of Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street)?

HC GPM LLC is the property owner/developer of record for Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street), per its TDLR project registration.

Who is the architect or design firm for Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street)?

Graham Associates Incorporated is the design firm of record for Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street), according to its TDLR filing.

How much does Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) cost and how big is it?

Lakesong Thoroughfares (Huffines Blvd & Misty Shore/Bluewater Street) has an estimated construction value of $50K and approximately 10,000 square feet (about $5/sqft), based on its TDLR filing.

Scope of Work

Site accessibility improvements including sidewalks, accessible routes, curb ramps, pedestrian ramps, landings, detectable warnings, and related exterior improvements necessary to comply with TAS and ADA

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4100 Kimble Road, Midlothian, TX, 76065

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76065 (Midlothian)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Midlothian?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.