Project intelligenceTDLR TABS2026018292Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ECISD PR1&2 - New Tech Odessa High School

300 E 29th St., Odessa, TX, 79762

Target date passed (Aug 2026)Review Complete

ECISD PR1&2 - New Tech Odessa High School is a renovation/alteration project at 300 E 29th St., Odessa, in Ector County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $84K across about 4,000 sq ft.

Estimated project value
$84K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$21/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 22, 2026107 days across supplied datesAug 7, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    40 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79762 (Odessa)

One email per change. Unsubscribe in one click. Privacy.

ECISD PR1&2 - New Tech Odessa High School is a Renovation/Alteration project located at 300 E 29th St., Odessa, TX 79762 in Odessa, Texas. The project has an estimated value of $84K covering 4,000 sq ft. Ector County Independent School District is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on April 22, 2026.

Frequently Asked Questions

What is ECISD PR1&2 - New Tech Odessa High School?

ECISD PR1&2 - New Tech Odessa High School is a renovation/alteration project at 300 E 29th St. in Odessa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Accessibility updates to parking and walkways. Non accessibility scope includes replacement of exterior waterproofing and joint sealants and roof top HVAC units.

Is ECISD PR1&2 - New Tech Odessa High School open in Odessa?

ECISD PR1&2 - New Tech Odessa High School was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is ECISD PR1&2 - New Tech Odessa High School located?

ECISD PR1&2 - New Tech Odessa High School is located at 300 E 29th St., Odessa, TX, 79762, in Ector County.

Who is the owner or developer of ECISD PR1&2 - New Tech Odessa High School?

Ector County Independent School District is the property owner/developer of record for ECISD PR1&2 - New Tech Odessa High School, per its TDLR project registration.

Who is the architect or design firm for ECISD PR1&2 - New Tech Odessa High School?

Parkhill is the design firm of record for ECISD PR1&2 - New Tech Odessa High School, according to its TDLR filing.

How much does ECISD PR1&2 - New Tech Odessa High School cost and how big is it?

ECISD PR1&2 - New Tech Odessa High School has an estimated construction value of $84K and approximately 4,000 square feet (about $21/sqft), based on its TDLR filing.

Scope of Work

Accessibility updates to parking and walkways. Non accessibility scope includes replacement of exterior waterproofing and joint sealants and roof top HVAC units.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

300 E 29th St., Odessa, TX, 79762

Location by street address

Watch all construction in 79762 (Odessa)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.