Project intelligenceTDLR TABS2026018292Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ECISD PR1&2 - New Tech Odessa High School

300 E 29th St., Odessa, TX, 79762

Construction complete · Oct 2026Inspection Complete

ECISD PR1&2 - New Tech Odessa High School is a renovation/alteration project at 300 E 29th St., Odessa, in Ector County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $84K across about 4,000 sq ft.

Estimated project value
$84K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$21/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 22, 2026163 days across supplied datesOct 2, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    40 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About ECISD PR1&2 - New Tech Odessa High School

Ector County Independent School District filed a renovation for New Tech Odessa High School at 300 E 29th St. in Odessa. The project covers 4,000 square feet of work with an estimated cost of $83,500. This equates to $21 per square foot, a figure below the county median of $72 for similar renovation filings in Ector County. The scheduled build window of 77 days is shorter than the county median of 121 days for this type of work.

The scope of work includes accessibility updates to parking and walkways. Non-accessibility improvements involve the replacement of exterior waterproofing and joint sealants, as well as the installation of new rooftop HVAC units. These physical changes are part of a broader effort to update the facility's infrastructure and compliance standards.

Project Details and Ownership

Parkhill is listed as the design firm of record for this project. Julie Ericson Gereda is the registered accessibility specialist associated with the filing. The project involves public funds and public land, confirming its status as a public school district initiative. Ector County Independent School District has six other TDLR-registered projects totaling $4,011,854, including the Bonham Middle School and Gonzales Elementary School renovations in Odessa.

TDLR completed plan review in June 2026 and construction was scheduled to finish in August 2026; TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The registration was filed in April 2026. Although the completion date on the filing has passed, the lack of a final inspection record means the project status remains pending in the official database.

For context, the ZIP code 79762 has a population of about 40,141 and a median household income of $74,560 according to U.S. Census estimates. The median owner-occupied home value in this area is $218,900. Parkhill has worked on six other TDLR-registered projects totaling $23,421,224, including the Kress Building in Amarillo and the Covenant Medical Center in Lubbock. This project is one of 104 registered in the last 24 months in Ector County.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79762 (Odessa)

One email per change. Unsubscribe in one click. Privacy.

ECISD PR1&2 - New Tech Odessa High School is a Renovation/Alteration project located at 300 E 29th St., Odessa, TX 79762 in Odessa, Texas. The project has an estimated value of $84K covering 4,000 sq ft. Ector County Independent School District is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on April 22, 2026.

Frequently Asked Questions

What is the estimated cost of the New Tech Odessa High School renovation?

The estimated cost is $83,500. This is below the county median of $205,000 for similar renovation filings in Ector County.

Who is the owner of the New Tech Odessa High School project?

Ector County Independent School District is the owner of record. Parkhill is the design firm of record.

Is the New Tech Odessa High School renovation complete?

TDLR has not yet recorded a final inspection. Construction was scheduled to finish in August 2026, but the current state is not confirmed in the public record.

What work is included in the scope of the project?

The scope includes accessibility updates to parking and walkways, replacement of exterior waterproofing and joint sealants, and new rooftop HVAC units.

Where is the New Tech Odessa High School project located?

The project is located at 300 E 29th St., Odessa, TX 79762, in Ector County.

What is ECISD PR1&2 - New Tech Odessa High School?

ECISD PR1&2 - New Tech Odessa High School is a renovation/alteration project at 300 E 29th St. in Odessa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Accessibility updates to parking and walkways. Non accessibility scope includes replacement of exterior waterproofing and joint sealants and roof top HVAC units.

Is ECISD PR1&2 - New Tech Odessa High School open in Odessa?

Construction on ECISD PR1&2 - New Tech Odessa High School is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is ECISD PR1&2 - New Tech Odessa High School located?

ECISD PR1&2 - New Tech Odessa High School is located at 300 E 29th St., Odessa, TX, 79762, in Ector County.

Who is the owner or developer of ECISD PR1&2 - New Tech Odessa High School?

Ector County Independent School District is the property owner/developer of record for ECISD PR1&2 - New Tech Odessa High School, per its TDLR project registration.

Who is the architect or design firm for ECISD PR1&2 - New Tech Odessa High School?

Parkhill is the design firm of record for ECISD PR1&2 - New Tech Odessa High School, according to its TDLR filing.

How much does ECISD PR1&2 - New Tech Odessa High School cost and how big is it?

ECISD PR1&2 - New Tech Odessa High School has an estimated construction value of $84K and approximately 4,000 square feet (about $21/sqft), based on its TDLR filing.

Scope of Work

Accessibility updates to parking and walkways. Non accessibility scope includes replacement of exterior waterproofing and joint sealants and roof top HVAC units.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

300 E 29th St., Odessa, TX, 79762

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.