Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
ECISD PR1&2 - Bonham Middle School in Odessa, TX
2201 E 21st St, Odessa, TX, 79761
ECISD PR1&2 - Bonham Middle School is a renovation/alteration project at 2201 E 21st St, Odessa, in Ector County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.2M across about 2,580 sq ft.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,580 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $475/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
30 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
37 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
40 days after the preceding date shown.
Source: TDLR filing
View source record
📰About ECISD PR1&2 - Bonham Middle School
The renovation of Bonham Middle School at 2201 E 21st St in Odessa is a $1,224,275 project filed under the name ECISD PR1&2 - Bonham Middle School. This 2,580 sq ft alteration was registered with TDLR in April 2026, with plan review completed in June 2026. The filing lists a scheduled construction start of May 2026 and a completion date of August 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
Scope of Work and Design
The work also includes repairing exterior ADA issues and replacing Temtrol duct systems, including external insulation. Electrical updates consist of replacing secondary distribution panels A3, A2, 2-A, and A1 on a like-for-like basis. Parkhill is the design firm of record for this project, and Julie Ericson Gereda is the registered accessibility specialist.
Ector County Independent School District is the owner of record. The estimated cost of $1,224,275 places this project above the county median for renovation and alteration filings. The scheduled build window of 77 days is shorter than the county median of 121 days. The cost per square foot is $475, which is above the county median of $72 per square foot. These figures are computed from TDLR-registered filings in Ector County.
The district has six other TDLR-registered projects totaling $2,871,079, including the Alternative Education Center and New Tech Odessa High School. Parkhill has six other registered projects totaling $23,421,224, including the Kress Building in Amarillo and Encore Academy in Midland. This project involves public funds and public land, consistent with its status as a school district renovation.
Located in ZIP code 79761, the area has a population of about 30,243 according to U.S. Census ACS 2023 five-year estimates. The median household income is $69,279, and the median owner-occupied home value is $158,400. The Ector County unemployment rate was 4.3 percent in July 2026. This project is part of a broader pattern of infrastructure updates in the region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79761 (Odessa)
One email per change. Unsubscribe in one click. Privacy.
ECISD PR1&2 - Bonham Middle School is a Renovation/Alteration project located at 2201 E 21st St, Odessa, TX 79761 in Odessa, Texas. The project has an estimated value of $1.2M covering 2,580 sq ft. Ector County Independent School District is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on April 22, 2026.
Frequently Asked Questions
What is the current status of the Bonham Middle School renovation?
TDLR completed plan review in June 2026 and construction was scheduled to finish in August 2026. However, TDLR has not yet recorded a final inspection, so the site status is unconfirmed in the public record.
Who is the owner and design firm for this project?
Ector County Independent School District is the owner of record. Parkhill is the design firm of record, and Julie Ericson Gereda is the registered accessibility specialist.
How does the project cost compare to other Ector County renovations?
The $1,224,275 cost is above the county median for renovation filings. The $475 per square foot cost is also above the county median of $72 per square foot.
Is the Bonham Middle School renovation open to the public?
The TDLR record does not contain information about business operations or public access. The record only covers construction status, which has not yet recorded a final inspection.
What is ECISD PR1&2 - Bonham Middle School?
ECISD PR1&2 - Bonham Middle School is a renovation/alteration project at 2201 E 21st St in Odessa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace ~80% of campus sanitary waste and vent systems. Replace domestic water valves. Repair exterior ADA issues. Replace Temtrol duct systems (incl. external insulation). Replace secondary distribution panels (A3, A2, 2-A, A1, like-for…
Is ECISD PR1&2 - Bonham Middle School open in Odessa?
ECISD PR1&2 - Bonham Middle School was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is ECISD PR1&2 - Bonham Middle School located?
ECISD PR1&2 - Bonham Middle School is located at 2201 E 21st St, Odessa, TX, 79761, in Ector County.
Who is the owner or developer of ECISD PR1&2 - Bonham Middle School?
Ector County Independent School District is the property owner/developer of record for ECISD PR1&2 - Bonham Middle School, per its TDLR project registration.
Who is the architect or design firm for ECISD PR1&2 - Bonham Middle School?
Parkhill is the design firm of record for ECISD PR1&2 - Bonham Middle School, according to its TDLR filing.
How much does ECISD PR1&2 - Bonham Middle School cost and how big is it?
ECISD PR1&2 - Bonham Middle School has an estimated construction value of $1.2M and approximately 2,580 square feet (about $475/sqft), based on its TDLR filing.
Scope of Work
Replace ~80% of campus sanitary waste and vent systems. Replace domestic water valves. Repair exterior ADA issues. Replace Temtrol duct systems (incl. external insulation). Replace secondary distribution panels (A3, A2, 2-A, A1, like-for-like).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2201 E 21st St, Odessa, TX, 79761
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.5M totalWatch all construction in 79761 (Odessa)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Odessa?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.