KidStrong
KidStrong is a renovation/alteration project at 6323 Camp Bowie Blvd Suite 141, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2026. The project has an estimated value of $250K across about 3,668 sq ft.
๐Project Metrics
TDLR #TABS2026018670Review Complete
Design review complete, construction may proceed
KidStrong is a Renovation/Alteration project located at 6323 Camp Bowie Blvd Suite 141, Fort Worth, TX 76116 in Fort Worth, Texas. The project has an estimated value of $250K covering 3,668 sq ft. Camp Bowie Dunhill LLC is the property owner and Lokal Workshop LLC is the design firm of record. The project was registered with TDLR on April 27, 2026.
โFrequently Asked Questions
What is KidStrong?
KidStrong is a renovation/alteration project at 6323 Camp Bowie Blvd Suite 141 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing tenant space. No exterior or site work included.
Is KidStrong open in Fort Worth?
KidStrong is still under construction in Fort Worth, TX, with an estimated completion of Jul 2026 according to its TDLR registration.
Where is KidStrong located?
KidStrong is located at 6323 Camp Bowie Blvd Suite 141, Fort Worth, TX, 76116, in Tarrant County.
Who is the owner or developer of KidStrong?
Camp Bowie Dunhill LLC is the property owner/developer of record for KidStrong, per its TDLR project registration.
Who is the architect or design firm for KidStrong?
Lokal Workshop LLC is the design firm of record for KidStrong, according to its TDLR filing.
How much does KidStrong cost and how big is it?
KidStrong has an estimated construction value of $250K and approximately 3,668 square feet (about $68/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing tenant space. No exterior or site work included.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2026
Review Complete
May 18, 2026
Inspection Complete
Closed
21d
Review duration