Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Grandview ISD 2025 Bond Program
705 S 5th ST, Grandview, TX, 76050
Grandview ISD 2025 Bond Program is a renovation/alteration project at 705 S 5th ST, Grandview, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $10.0M across about 34,600 sq ft.
- Estimated project value
- $10.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 34,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $289/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
48 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
40 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
549 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Grandview ISD 2025 Bond Program
The Grandview ISD 2025 Bond Program includes a major renovation and expansion at the intermediate school facility located at 705 S 5th ST in Grandview. The project involves approximately 32,600 square feet of renovation work across the gym building and the intermediate school, plus 2,000 square feet of new construction for a connector between the two structures. The total estimated cost is $10,000,000, with construction scheduled to finish in February 2028.
BWA Architects serves as the design firm of record for this project, which is registered with the Texas Department of Licensing and Regulation (TDLR) as a renovation and alteration. TDLR completed the plan review in June 2026. Construction is set to begin in August 2026, marking the start of a 549-day build window that extends through early 2028.
Grandview ISD is the owner of record. The district has three other TDLR-registered projects in the area, including a high school remediation project and a junior high renovation, totaling $2.3 million in additional estimated costs.
Project Context and Scale
This $10,000,000 investment is significantly larger than typical renovation projects in Johnson County. The median estimated cost for similar renovation and alteration filings in the county is $250,000. This project’s cost is in the top quarter of filings for its type. The estimated cost per square foot is $289, which is above the county median of $75 per square foot.
BWA Architects has six other TDLR-registered projects totaling $26.5 million, including work in Grandview, Moody, Pittsburg, and Sulphur Bluff. The firm’s experience in school district renovations supports the scale of this Grandview ISD bond program initiative.
Grandview, Texas, has a population of about 7,178 residents according to U.S. Census estimates for ZIP code 76050. The median household income is $92,949, and the median owner-occupied home value is $255,400. The housing market is predominantly owner-occupied, reflecting a stable community base for the district’s educational infrastructure investments.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76050 (Grandview)
One email per change. Unsubscribe in one click. Privacy.
Grandview ISD 2025 Bond Program is a Renovation/Alteration project located at 705 S 5th ST, Grandview, TX 76050 in Grandview, Texas. The project has an estimated value of $10.0M covering 34,600 sq ft. Grandview ISD is the property owner and BWA Architects is the design firm of record. The project was registered with TDLR on May 5, 2026.
Frequently Asked Questions
When is the construction scheduled to finish?
Construction is scheduled to finish in February 2028. Work is set to start in August 2026, following the completion of TDLR plan review in June 2026.
What is the total estimated cost of the project?
The estimated cost is $10,000,000. This covers approximately 32,600 square feet of renovation and 2,000 square feet of new connector construction at the intermediate school.
Who is the design firm for this project?
BWA Architects is the design firm of record. They are responsible for the architectural design of the renovation and new connector between the gym and intermediate school buildings.
How does this project compare to others in Johnson County?
This project is larger and more expensive than the county median. The median cost for similar renovations is $250,000, while this project is estimated at $10,000,000.
What is Grandview ISD 2025 Bond Program?
Grandview ISD 2025 Bond Program is a renovation/alteration project at 705 S 5th ST in Grandview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THERE IS APPROXIMATELY 32,600 SF OF RENOVATION AT THE GYM BUILDING AND INTERMEDIATE SCHOOL WITH 2,000 SF OF NEW BUILD FOR THE CONNECTOR BETWEEN THE TWO BUILDINGS.
Is Grandview ISD 2025 Bond Program open in Grandview?
Grandview ISD 2025 Bond Program is still under construction in Grandview, TX, with an estimated completion of Feb 2028 according to its TDLR registration.
Where is Grandview ISD 2025 Bond Program located?
Grandview ISD 2025 Bond Program is located at 705 S 5th ST, Grandview, TX, 76050, in Johnson County.
Who is the owner or developer of Grandview ISD 2025 Bond Program?
Grandview ISD is the property owner/developer of record for Grandview ISD 2025 Bond Program, per its TDLR project registration.
Who is the architect or design firm for Grandview ISD 2025 Bond Program?
BWA Architects is the design firm of record for Grandview ISD 2025 Bond Program, according to its TDLR filing.
How much does Grandview ISD 2025 Bond Program cost and how big is it?
Grandview ISD 2025 Bond Program has an estimated construction value of $10.0M and approximately 34,600 square feet (about $289/sqft), based on its TDLR filing.
Scope of Work
THERE IS APPROXIMATELY 32,600 SF OF RENOVATION AT THE GYM BUILDING AND INTERMEDIATE SCHOOL WITH 2,000 SF OF NEW BUILD FOR THE CONNECTOR BETWEEN THE TWO BUILDINGS.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
705 S 5th ST, Grandview, TX, 76050
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$12.3M totalWatch all construction in 76050 (Grandview)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Grandview?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.