QISG
QISG is a renovation/alteration project at 10000 Energy Dr. level 8, Somerset, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $775K across about 22,611 sq ft.
๐Project Metrics
TDLR #TABS2026020032Review Complete
Design review complete, construction may proceed
QISG is a Renovation/Alteration project located at 10000 Energy Dr. level 8, Somerset, TX 77389 in Somerset, Texas. The project has an estimated value of $775K covering 22,611 sq ft. 10000 Energy Drive Owner LP is the property owner and Inventure is the design firm of record. The project was registered with TDLR on May 12, 2026.
โFrequently Asked Questions
What is QISG?
QISG is a renovation/alteration project at 10000 Energy Dr. level 8 in Somerset, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor renovation of the 8th floor. It excludes the restrooms.
Is QISG open in Somerset?
QISG is still under construction in Somerset, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is QISG located?
QISG is located at 10000 Energy Dr. level 8, Somerset, TX, 77389, in Harris County.
Who is the owner or developer of QISG?
10000 Energy Drive Owner LP is the property owner/developer of record for QISG, per its TDLR project registration.
Who is the architect or design firm for QISG?
Inventure is the design firm of record for QISG, according to its TDLR filing.
How much does QISG cost and how big is it?
QISG has an estimated construction value of $775K and approximately 22,611 square feet (about $34/sqft), based on its TDLR filing.
๐Scope of Work
Minor renovation of the 8th floor. It excludes the restrooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 12, 2026
Review Complete
Jun 22, 2026
Inspection Complete
Closed
41d
Review duration