Montrose Safe Routes to School Connections
Bounded by Fairview, W Dallas, Eberhard, and Taft, Houston, TX, 77019
Montrose Safe Routes to School Connections is a new construction project at Bounded by Fairview, W Dallas, Eberhard, and Taft, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $8.9M across about 427,235 sq ft.
- Estimated project value
- $8.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 427,235 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $21/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
45 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
50 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Montrose Safe Routes to School Connections
The Montrose Safe Routes to School Connections project is a new construction effort in Houston, Texas, bounded by Fairview, W Dallas, Eberhard, and Taft streets. The work is scheduled to finish in August 2027, following a construction start in August 2026. TDLR completed plan review in July 2026, establishing the regulatory timeline for this significant infrastructure upgrade in Harris County.
The scope of work focuses on pedestrian safety and accessibility within the neighborhood. The project involves the installation of ADA-compliant sidewalks ranging from 4 to 6 feet wide, along with matching ramps. Additionally, the filing specifies milling and overlay work on existing pavement, the installation of HAWK signals for crosswalks, and measures for tree protection. These improvements aim to create a safer environment for students and residents navigating the area.
Project Scale and Cost
With an estimated cost of $8,871,346, this project represents a substantial investment in local infrastructure. The total area covered by the work is 427,235 square feet. When compared to other new construction filings in Harris County, this cost is above the county median for its type. The calculated cost per square foot is $21, which is below the county median of $88 per square foot, reflecting the linear nature of sidewalk and signal work compared to building structures.
Montrose Redevelopment Authority is the owner and developer of record for this project. HR Green serves as the design firm of record, a firm that has been involved in several other high-value infrastructure projects in the region. Holly Respondek is the registered accessibility specialist listed in the filing. The project utilizes public funds and involves public land, indicating a strong municipal commitment to improving safe routes to school in this specific Houston neighborhood.
The construction window is scheduled for 365 days, which is longer than the county median build window of 219 days for similar new construction filings. This extended timeline accounts for the complexity of integrating multiple elements, including signal technology and extensive sidewalk construction, within a lived-in urban environment. The project remains in the Review Complete status with TDLR, ready to proceed with the construction phase as outlined in the filing.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77019 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Montrose Safe Routes to School Connections is a New Construction project located at Bounded by Fairview, W Dallas, Eberhard, and Taft, Houston, TX 77019 in Houston, Texas. The project has an estimated value of $8.9M covering 427,235 sq ft. Montrose Redevelopment Authority is the property owner and HR Green is the design firm of record. The project was registered with TDLR on May 21, 2026.
Frequently Asked Questions
When is the project scheduled to finish?
Construction is scheduled to finish in August 2027. Work is set to begin in August 2026, following the completion of plan review by TDLR in July 2026.
What specific improvements are included in the scope?
The scope includes ADA-compliant 4 to 6-foot-wide sidewalks, ramps, milling and overlay, HAWK signals, and tree protection measures within the defined boundaries.
Who is the owner and design firm?
Montrose Redevelopment Authority is the owner of record. HR Green is the design firm, and Holly Respondek is the registered accessibility specialist for the project.
Is the project currently open or operating?
No, this is a construction project. The filing indicates construction is scheduled to start in August 2026 and finish in August 2027. It is not a business opening.
How does the cost compare to other Harris County projects?
The estimated cost of $8,871,346 is above the county median for new construction. The cost per square foot is $21, which is below the county median of $88.
What is Montrose Safe Routes to School Connections?
Montrose Safe Routes to School Connections is a new construction project at Bounded by Fairview, W Dallas, Eberhard, and Taft in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADA-compliant 4 to 6-foot-wide sidewalks and ramps, milling and overlay, HAWK signals, and tree protection
Is Montrose Safe Routes to School Connections open in Houston?
Montrose Safe Routes to School Connections is still under construction in Houston, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Montrose Safe Routes to School Connections located?
Montrose Safe Routes to School Connections is located at Bounded by Fairview, W Dallas, Eberhard, and Taft, Houston, TX, 77019, in Harris County.
Who is the owner or developer of Montrose Safe Routes to School Connections?
Montrose Redevelopment Authority is the property owner/developer of record for Montrose Safe Routes to School Connections, per its TDLR project registration.
Who is the architect or design firm for Montrose Safe Routes to School Connections?
HR Green is the design firm of record for Montrose Safe Routes to School Connections, according to its TDLR filing.
How much does Montrose Safe Routes to School Connections cost and how big is it?
Montrose Safe Routes to School Connections has an estimated construction value of $8.9M and approximately 427,235 square feet (about $21/sqft), based on its TDLR filing.
Scope of Work
ADA-compliant 4 to 6-foot-wide sidewalks and ramps, milling and overlay, HAWK signals, and tree protection
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Bounded by Fairview, W Dallas, Eberhard, and Taft, Houston, TX, 77019
Related Projects
Watch all construction in 77019 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.