Brown Trail Improvements
Intersection of Brown Trail & Pipeline Rd, Bedford, TX, 76022
Brown Trail Improvements is a renovation/alteration project at Intersection of Brown Trail & Pipeline Rd, Bedford, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $320K across about 2,500 sq ft.
- Estimated project value
- $320K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $128/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
24 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
304 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Brown Trail Improvements
The City of Bedford is executing a complete street reconstruction of Brown Trail between Pipeline Road and Bedford Road. This project, filed as Brown Trail Improvements, encompasses 2,500 square feet of right-of-way work at the intersection of Brown Trail and Pipeline Road in Bedford, Texas 76022. The scope includes 31,500 square feet of pedestrian improvements. Construction is scheduled to finish in May 2027, with work starting in July 2026.
Westwood Professional Services serves as the design firm of record for this renovation and alteration project. The estimated cost is $320,000, which equates to $128 per square foot. This figure is above the Tarrant County median of $79 per square foot for similar renovation filings. The total cost is also above the county median of $250,000. The scheduled build window of 304 days is longer than the county median of 92 days for this project type.
Project Status and Registration
TDLR completed plan review in June 2026. The project is registered under the name Public ROW, with Blair Baker listed as the registered accessibility specialist. The TDLR status is Review Complete. The City of Bedford is the owner of record. This project involves public funds and public land. It is part of a series of infrastructure investments by the city, which has six other TDLR-registered projects totaling $20,043,174. These include the Bedford Animal Shelter and Bedford Fire Station 2, both valued at $3,000,000.
Westwood Professional Services has six other TDLR-registered projects totaling $13,085,665. Recent work by the firm includes Medina Base Park in San Antonio and Windsor Park in San Antonio. The firm’s portfolio spans multiple counties, indicating a broad regional presence in public infrastructure design. The current project in Bedford fits within this pattern of municipal street and park renovations.
The Bedford area profile indicates a population of about 13,790 in ZIP code 76022. The median household income is $72,197. The median owner-occupied home value is $255,300. Housing in the area is an even mix of owner- and renter-occupied units. Tarrant County unemployment was 4.6 percent in July 2026, higher than a year earlier. These economic factors provide context for the public investment in street infrastructure and pedestrian safety improvements in the community.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76022 (Bedford)
One email per change. Unsubscribe in one click. Privacy.
Brown Trail Improvements is a Renovation/Alteration project located at Intersection of Brown Trail & Pipeline Rd, Bedford, TX 76022 in Bedford, Texas. The project has an estimated value of $320K covering 2,500 sq ft. City of Bedford is the property owner and Westwood Professional Services is the design firm of record. The project was registered with TDLR on May 29, 2026.
Frequently Asked Questions
When will the Brown Trail reconstruction be finished?
Construction is scheduled to finish in May 2027. Work is set to start in July 2026 following the completion of plan review in June 2026.
Who is designing the Brown Trail improvements?
Westwood Professional Services is the design firm of record. Blair Baker is the registered accessibility specialist for the project.
How much does the project cost?
The estimated cost is $320,000. This is above the Tarrant County median cost of $250,000 for similar renovation filings.
Is the project currently open to the public?
The project is under construction. It is scheduled to finish in May 2027. No specific opening date is provided in the TDLR record.
What is Brown Trail Improvements?
Brown Trail Improvements is a renovation/alteration project at Intersection of Brown Trail & Pipeline Rd in Bedford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project is a complete street reconstruction of Brown Trail from Pipeline Rd to Bedford Rd. It includes 31,500 SF of pedestrian improvements
Is Brown Trail Improvements open in Bedford?
Brown Trail Improvements is still under construction in Bedford, TX, with an estimated completion of May 2027 according to its TDLR registration.
Where is Brown Trail Improvements located?
Brown Trail Improvements is located at Intersection of Brown Trail & Pipeline Rd, Bedford, TX, 76022, in Tarrant County.
Who is the owner or developer of Brown Trail Improvements?
City of Bedford is the property owner/developer of record for Brown Trail Improvements, per its TDLR project registration.
Who is the architect or design firm for Brown Trail Improvements?
Westwood Professional Services is the design firm of record for Brown Trail Improvements, according to its TDLR filing.
How much does Brown Trail Improvements cost and how big is it?
Brown Trail Improvements has an estimated construction value of $320K and approximately 2,500 square feet (about $128/sqft), based on its TDLR filing.
Scope of Work
The project is a complete street reconstruction of Brown Trail from Pipeline Rd to Bedford Rd. It includes 31,500 SF of pedestrian improvements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Intersection of Brown Trail & Pipeline Rd, Bedford, TX, 76022
Related Projects
Same Owner
$3.9M totalWatch all construction in 76022 (Bedford)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Bedford?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.