Melissa Lake Park Phase 2 Addition
4101 Liberty Way, Melissa, TX, 75454
Melissa Lake Park Phase 2 Addition is a renovation/alteration project at 4101 Liberty Way, Melissa, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $390K across about 25,000 sq ft.
- Estimated project value
- $390K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 25,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $16/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
55 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Melissa Lake Park Phase 2 Addition
Melissa Lake Park Phase 2 Addition
The City of Melissa has registered the Melissa Lake Park Phase 2 Addition with the Texas Department of Licensing and Regulation (TDLR). Located at 4101 Liberty Way in Melissa, Collin County, this renovation and alteration project involves the construction of a new concrete trail system. The scope includes adding approximately 2,500 linear feet of ten-foot-wide trail, along with necessary erosion control, drainage infrastructure, and electrical lighting. The project covers a total of 25,000 square feet.
Westwood Professional Services serves as the design firm of record for this public works initiative. Ross A Thomas is the registered accessibility specialist overseeing the TABS compliance aspects of the filing. The estimated cost for the project is $390,000. This figure results in a cost per square foot of $16. The project involves public funds and public land, necessitating strict adherence to state accessibility regulations during the construction phase.
According to the official TDLR filing, the project was registered in November 2026. Construction is scheduled to begin in September 2026, with the completion date targeted for November 2026. Plan review is pending. The scheduled build window is 83 days. This duration is close to the median scheduled build window of 92 days for renovation and alteration projects in Collin County.
When compared to other renovation and alteration filings in the area, this project stands out for its scale and cost efficiency. The median estimated cost for similar projects in Collin County is $221,000. The $390,000 estimate for the Melissa Lake Park Phase 2 Addition is above the county median. However, the cost per square foot is significantly below the county median of $78. The median size for these projects is 3,422 square feet, making the 25,000 square foot scope unusually large.
The City of Melissa has several other TDLR-registered projects in the region, including the East Water Facility and the original Melissa Lake Park. Westwood Professional Services also manages other park and infrastructure projects in Aubrey, Frisco, and San Antonio. For residents in ZIP code 75454, the median household income is $135,556, and the area is predominantly owner-occupied. The project represents a significant investment in local public infrastructure and recreational access.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75454 (Melissa)
One email per change. Unsubscribe in one click. Privacy.
Melissa Lake Park Phase 2 Addition is a Renovation/Alteration project located at 4101 Liberty Way,, Melissa, TX 75454 in Melissa, Texas. The project has an estimated value of $390K covering 25,000 sq ft. City of Melissa is the property owner and Westwood Professional Services is the design firm of record. The project was registered with TDLR on November 2, 2026.
Frequently Asked Questions
Who is the registered accessibility specialist for this project?
Ross A Thomas is the registered accessibility specialist listed on the TDLR filing for the Melissa Lake Park Phase 2 Addition.
What is the estimated cost of the project?
The estimated cost for the Melissa Lake Park Phase 2 Addition is $390,000, covering the trail, drainage, and lighting work.
When does construction start?
Construction is scheduled to begin in September 2026, with the project completion date targeted for November 2026.
Is the project finished?
The TDLR record indicates the project is registered and plan review is pending. It does not confirm physical completion or business opening.
Who is the design firm?
Westwood Professional Services is the design firm of record for this renovation and alteration project in Melissa.
What is Melissa Lake Park Phase 2 Addition?
Melissa Lake Park Phase 2 Addition is a renovation/alteration project at 4101 Liberty Way in Melissa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of ten-foot wide, approximately 2,500 LF of concrete trail with erosion control, drainage, and electrical lighting
Is Melissa Lake Park Phase 2 Addition open in Melissa?
Melissa Lake Park Phase 2 Addition is still under construction in Melissa, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Melissa Lake Park Phase 2 Addition located?
Melissa Lake Park Phase 2 Addition is located at 4101 Liberty Way, Melissa, TX, 75454, in Collin County.
Who is the owner or developer of Melissa Lake Park Phase 2 Addition?
City of Melissa is the property owner/developer of record for Melissa Lake Park Phase 2 Addition, per its TDLR project registration.
Who is the architect or design firm for Melissa Lake Park Phase 2 Addition?
Westwood Professional Services is the design firm of record for Melissa Lake Park Phase 2 Addition, according to its TDLR filing.
How much does Melissa Lake Park Phase 2 Addition cost and how big is it?
Melissa Lake Park Phase 2 Addition has an estimated construction value of $390K and approximately 25,000 square feet (about $16/sqft), based on its TDLR filing.
Scope of Work
Addition of ten-foot wide, approximately 2,500 LF of concrete trail with erosion control, drainage, and electrical lighting
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4101 Liberty Way, Melissa, TX, 75454
Related Projects
Watch all construction in 75454 (Melissa)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Melissa?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.