Project intelligenceTDLR TABS2026022369New Construction
Funding type

This project is privately funded, on private land for private use.

Take 5 Oil Change in Harlingen, TX

1521 W Tyler Ave, Harlingen, TX, 78550

Opening ~Feb 2027Review Complete

Take 5 Oil Change is a new construction project at 1521 W Tyler Ave, Harlingen, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $850K across about 1,707 sq ft.

Estimated project value
$850K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,707 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$498/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 9, 2026264 days across supplied datesFeb 28, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    114 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    115 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Take 5 Oil Change

TDLR-registered accessibility project for Take 5 Oil Change - Harlingen is a new express oil change facility located at 1521 W Tyler Ave, Harlingen, TX 78550. CJE Construction serves as the owner and developer of record, with the Altar Group acting as the design firm. Kari Thomas is the registered accessibility specialist. The project involves new construction on private land for private use, with an estimated cost of $850,000.

Project Scope and Timeline

The filing describes the scope of work as a new express oil change facility. The building will encompass 1,707 sq ft. Based on the estimated cost and square footage, the cost per sq ft is $498. The project is privately funded. Construction is scheduled to begin in October 2026, and the project is scheduled to finish in February 2027. This represents a scheduled build window of approximately 150 days.

Market Context

According to analysis of 1458 TDLR-registered new construction filings in Cameron County, the median estimated cost for similar projects is $500,000, with the middle half ranging from $205,250 to $1,250,000. The median size for these projects is 6,357 sq ft, and the median cost per sq ft is $98. The median scheduled build window is 254 days. This project's cost is above the county median for its type. Its scheduled build window of 150 days is shorter than the county median of 254 days. Its $498 per sq ft is above the county median of $98.

The design firm, Altar Group, has six other TDLR-registered projects totaling $3,085,000. These include Take 5 Oil Change locations in Houston ($850,000), Cleveland ($800,000), Ennis ($650,000), Willis ($85,000), and Harker Heights ($50,000). The site is located in ZIP 78550, which has a population of about 54,169. The median household income in this area is $51,524. There are 22,347 housing units, with a median owner-occupied home value of $120,500. Housing in the ZIP code is an even mix of owner- and renter-occupied.

The project was registered with TDLR in June 2026. Plan review was completed in November 2026. The current TDLR status is Review Complete. Cameron County unemployment rate (FRED, September 2026) was 5.9 percent, lower than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78550 (Harlingen)

One email per change. Unsubscribe in one click. Privacy.

Take 5 Oil Change is a New Construction project located at 1521 W Tyler Ave, Harlingen, TX 78550 in Harlingen, Texas. The project has an estimated value of $850K covering 1,707 sq ft. CJE Construction is the property owner and Altar Group is the design firm of record. The project was registered with TDLR on June 9, 2026.

Frequently Asked Questions

What is the address of the new Take 5 Oil Change in Harlingen?

The address is 1521 W Tyler Ave, Harlingen, TX 78550. This is the location for the new construction project registered with TDLR.

How large is the new facility?

The facility will be 1,707 sq ft. It is designed as a new express oil change facility.

Who is the design firm for this project?

The Altar Group is the design firm of record for this project. They have worked on several other Take 5 Oil Change locations in Texas.

When does construction start?

Construction is scheduled to start in October 2026. The project is scheduled to finish in February 2027.

Is the business currently open?

The TDLR record covers construction only and does not record whether the business has started serving customers.

What is Take 5 Oil Change?

Take 5 Oil Change is a new construction project at 1521 W Tyler Ave in Harlingen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New express oil change facility

Is Take 5 Oil Change open in Harlingen?

Take 5 Oil Change is still under construction in Harlingen, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is Take 5 Oil Change located?

Take 5 Oil Change is located at 1521 W Tyler Ave, Harlingen, TX, 78550, in Cameron County.

Who is the owner or developer of Take 5 Oil Change?

CJE Construction is the property owner/developer of record for Take 5 Oil Change, per its TDLR project registration.

Who is the architect or design firm for Take 5 Oil Change?

Altar Group is the design firm of record for Take 5 Oil Change, according to its TDLR filing.

How much does Take 5 Oil Change cost and how big is it?

Take 5 Oil Change has an estimated construction value of $850K and approximately 1,707 square feet (about $498/sqft), based on its TDLR filing.

Scope of Work

New express oil change facility

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1521 W Tyler Ave, Harlingen, TX, 78550

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78550 (Harlingen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Harlingen?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.