Construction Contractor Facility Phase 2 in San Antonio, TX

3822 S.E. Military Dr., San Antonio, TX, 78223

Opening ~Feb 2027Review Complete

Construction Contractor Facility Phase 2 is a new construction project at 3822 S.E. Military Dr., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $109K across about 9,000 sq ft.

Estimated project value
$109K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 11, 2026235 days across supplied datesFeb 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    51 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    39 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    145 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Construction Contractor Facility Phase 2

Construction Contractor Facility Phase 2 is a 9,000 sq ft new construction project at 3822 S.E. Military Dr. in San Antonio. The project provides additional warehouse space leased exclusively to tenants in the existing Phase 1 facility. It uses a PEMB building system with a metal wall panel finish and includes no plumbing or mechanical systems. Aamil Plaza, LLC is the owner of record, and Dallenbach Cole Architecture is the design firm.

This privately funded expansion is registered with the Texas Department of Licensing and Regulation under the Accessibility (TABS) program. The filing lists an estimated cost of $109,256, which works out to $12 per square foot. Construction began in August 2026, and the project is scheduled to finish in February 2027.

Project Scope and Design

The scope of work is limited to additional warehouse space leased exclusively to tenants in the existing Phase 1 structure. The building system is a pre-engineered metal building (PEMB) with a metal wall panel finish. The filing explicitly notes that there is no plumbing or mechanical work involved in this phase. Jessica Trevino Hamm is the registered accessibility specialist on the project.

Dallenbach Cole Architecture has completed six other TDLR-registered projects totaling $20,600,000. Recent work by this firm includes the ESS 0472 Austin Addition and the Emory Peak Retail Center #3 in San Antonio. All listed projects by this firm have a review complete status.

Local Context and Status

The project is located in Bexar County, where the median estimated cost for new construction filings is $600,000. This project’s cost is below the county median for its type. The scheduled build window of 184 days is close to the county median of 208 days. The $12 per square foot cost is below the county median of $115 per square foot.

TDLR completed plan review in September 2026. The status is Review Complete. City of San Antonio permit records show seven permits on file at this street address, issued between March 2025 and September 2026. These include three On Premise Sign permits, two Plumbing General Permits, one Electrical General Permit, and one Plumbing Sewer Permit. The most recent permit was issued to Jackpot Electric LLC for Express Minor Structures - Sage Business Park.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78223 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

Construction Contractor Facility Phase 2 is a New Construction project located at 3822 S.E. Military Dr., San Antonio, TX 78223 in San Antonio, Texas. The project has an estimated value of $109K covering 9,000 sq ft. Aamil Plaza, LLC is the property owner and Dallenbach Cole Architecture is the design firm of record. The project was registered with TDLR on June 11, 2026.

Frequently Asked Questions

What is the status of the construction?

TDLR completed plan review in September 2026. Construction started in August 2026 and is scheduled to finish in February 2027.

Who owns the building?

Aamil Plaza, LLC is the owner or developer of record for this project.

Is the business open?

The TDLR record only covers construction. It does not confirm if the business is open or operating.

What is Construction Contractor Facility Phase 2?

Construction Contractor Facility Phase 2 is a new construction project at 3822 S.E. Military Dr. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additional warehouse space leased to only tenants in existing phase 1. PEMB building system with metal wall panel finish. No plumbing or mechanical.

Is Construction Contractor Facility Phase 2 open in San Antonio?

Construction Contractor Facility Phase 2 is still under construction in San Antonio, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is Construction Contractor Facility Phase 2 located?

Construction Contractor Facility Phase 2 is located at 3822 S.E. Military Dr., San Antonio, TX, 78223, in Bexar County.

Who is the owner or developer of Construction Contractor Facility Phase 2?

Aamil Plaza, LLC is the property owner/developer of record for Construction Contractor Facility Phase 2, per its TDLR project registration.

Who is the architect or design firm for Construction Contractor Facility Phase 2?

Dallenbach Cole Architecture is the design firm of record for Construction Contractor Facility Phase 2, according to its TDLR filing.

How much does Construction Contractor Facility Phase 2 cost and how big is it?

Construction Contractor Facility Phase 2 has an estimated construction value of $109K and approximately 9,000 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Additional warehouse space leased to only tenants in existing phase 1. PEMB building system with metal wall panel finish. No plumbing or mechanical.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3822 S.E. Military Dr., San Antonio, TX, 78223

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

3822 SE MILITARY DR, City of San Antonio, TX 78223

3822 SE MILITARY DR

IssuedOn Premise SignSep 2026
SAT-SIG-OPS-PMT26-21501278
3822 SE MILITARY DR, City of San Antonio, TX 78223

JACKPOT ELECTRIC LLC

IssuedElectrical General PermitJul 2026
SAT-MEP-ELE-PMT26-33319412
3822 SE MILITARY DR, City of San Antonio, TX 78223

General Permit

IssuedPlumbing General PermitApr 2026
SAT-MEP-PLM-PMT26-34310691
3822 SE MILITARY DR, City of San Antonio, TX 78223

EXPRESS Minor Structures - Sage Business Park

IssuedPlumbing General PermitNewFeb 2026
SAT-COM-RW-PMT26-41100009
3822 SE MILITARY DR, City of San Antonio, TX 78223

3822 SE MILITARY DR

IssuedOn Premise SignNov 2025
SAT-SIG-OPS-PMT25-21501711

Watch all construction in 78223 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.