Project has been registered with TDLR and is in pre-construction phase
Greenbusch Road Paving & Drainage Improvements & Spring Green Signal project is a Renovation/Alteration project located at Greenbusch RD 301 Jackson St, Richmond, TX 77469, Katy, TX 77469 in Richmond, Texas. The project has an estimated value of $8.4M covering 853 sq ft. Fort Bend County is the property owner and Aguirre & Fields, LP is the design firm of record. The project was registered with TDLR on June 16, 2026.
Greenbusch Road Paving & Drainage Improvements & Spring Green Signal project is a renovation/alteration project at Greenbusch RD 301 Jackson St, Richmond, TX 77469, Katy, TX 77469 in Richmond, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of Greenbusch Road between Gaston Road and Westheimer Parkway, converting the existing two-lane roadway with open ditches into a two-lane section with curb and gutter. Project includes approximately 853 SY of sidewalk andโฆ
Greenbusch Road Paving & Drainage Improvements & Spring Green Signal project is still under construction in Richmond, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Greenbusch Road Paving & Drainage Improvements & Spring Green Signal project is located at Greenbusch RD 301 Jackson St, Richmond, TX 77469, Katy, TX 77469, Richmond, TX, 77469, in Fort Bend County.
Fort Bend County is the property owner/developer of record for Greenbusch Road Paving & Drainage Improvements & Spring Green Signal project, per its TDLR project registration.
Aguirre & Fields, LP is the design firm of record for Greenbusch Road Paving & Drainage Improvements & Spring Green Signal project, according to its TDLR filing.
Greenbusch Road Paving & Drainage Improvements & Spring Green Signal project has an estimated construction value of $8.4M and approximately 853 square feet (about $9.85K/sqft), based on its TDLR filing.
Reconstruction of Greenbusch Road between Gaston Road and Westheimer Parkway, converting the existing two-lane roadway with open ditches into a two-lane section with curb and gutter. Project includes approximately 853 SY of sidewalk and 10EA ADA ra
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 16, 2026
Review Complete
Inspection Complete
Closed