Project intelligenceTDLR TABS2026025793Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project

Greenbusch Rd, Katy, TX, 77494

Opening ~Jan 2027Review Complete

Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project is a renovation/alteration project at Greenbusch Rd, Katy, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $8.4M across about 853 sq ft.

Estimated project value
$8.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
853 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9.85K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 1, 2025730 days across supplied datesJan 1, 2027

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    566 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    16 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    148 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project

The Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project involves the reconstruction of Greenbusch Road in Katy, converting an existing two-lane roadway with open ditches into a two-lane section with curb and gutter. Located between Gaston Road and Westheimer Parkway, the project is valued at $8,405,027. Construction started in January 2025, and the work is scheduled to finish in January 2027.

The scope of work includes approximately 853 square feet of new sidewalk and the installation of 10 ADA ramps. This renovation alters the physical infrastructure to improve accessibility and drainage along the corridor. The registered accessibility specialist for the project is Robert W Green.

Aguirre & Fields, LP serves as the design firm of record. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in July 2026. Plan review was completed in August 2026, confirming that the design meets state accessibility standards before final construction milestones.

Project Context and Funding

This roadway improvement utilizes public funds and is located on public land. It is categorized as a Federally funded roadway project. The estimated cost places this filing in the top quarter of renovation and alteration projects in Fort Bend County, significantly exceeding the county median of $239,750 for similar work.

The scheduled build window of 730 days is longer than the county median of 92 days for comparable filings. Fort Bend County has six other TDLR-registered projects totaling $10,332,501, including recent work on Highland Knolls Road and Katy-Gaston Road in Katy.

The design firm, Aguirre & Fields, LP, has four other TDLR-registered projects totaling $27,852,735. Their portfolio includes significant roadway projects in Houston and Weatherford. The local area, ZIP code 77494, has a population of about 130,920 residents and a median household income of $144,444 according to U.S. Census estimates.

With plan review complete and construction already underway, the Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project is moving toward its final phase. The integration of curb, gutter, and accessible ramps represents a substantial upgrade to the existing road infrastructure in this part of Fort Bend County.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77494 (Katy)

One email per change. Unsubscribe in one click. Privacy.

Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project is a Renovation/Alteration project located at Greenbusch Rd, Katy, TX 77494 in Katy, Texas. The project has an estimated value of $8.4M covering 853 sq ft. Fort Bend County is the property owner and Aguirre & Fields, LP is the design firm of record. The project was registered with TDLR on July 21, 2026.

Frequently Asked Questions

When will the Greenbusch Road project be finished?

Construction started in January 2025 and is scheduled to finish in January 2027. The TDLR plan review was completed in August 2026, confirming the design is ready for final construction phases.

Who is the owner of this roadway project?

Fort Bend County is the owner of record. The project involves public funds and is located on public land, making it a Federally funded roadway improvement.

What specific improvements are included in the scope?

The project reconstructs the road between Gaston Road and Westheimer Parkway. It includes approximately 853 square feet of sidewalk and 10 ADA ramps, converting open ditches to curb and gutter.

Is the project located in a flood zone?

According to the FEMA National Flood Hazard Layer, the site falls within zone X.

Which firm designed this project?

Aguirre & Fields, LP is the design firm of record. They have four other TDLR-registered projects totaling $27,852,735, including major roadway projects in Houston.

What is Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project?

Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project is a renovation/alteration project at Greenbusch Rd in Katy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of Greenbusch Road between Gaston Road and Westheimer Parkway, converting the existing two-lane roadway with open ditches into a two-lane section with curb and gutter. Project includes approximately 853 SY of sidewalk and…

Is Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project open in Katy?

Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project is still under construction in Katy, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project located?

Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project is located at Greenbusch Rd, Katy, TX, 77494, in Fort Bend County.

Who is the owner or developer of Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project?

Fort Bend County is the property owner/developer of record for Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project, per its TDLR project registration.

Who is the architect or design firm for Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project?

Aguirre & Fields, LP is the design firm of record for Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project, according to its TDLR filing.

How much does Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project cost and how big is it?

Greenbusch Road Paving & Drainage Improvements & Spring Green Signal Project has an estimated construction value of $8.4M and approximately 853 square feet (about $9.85K/sqft), based on its TDLR filing.

Scope of Work

Reconstruction of Greenbusch Road between Gaston Road and Westheimer Parkway, converting the existing two-lane roadway with open ditches into a two-lane section with curb and gutter. Project includes approximately 853 SY of sidewalk and 10EA ADA ramp

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Greenbusch Rd, Katy, TX, 77494

29.51122, -95.78073

Watch all construction in 77494 (Katy)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.