Austin SSLC Replacement Kitchen Building is a new construction project at 2203 West 35th St. Building #800, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2028. The project has an estimated value of $11.1M across about 9,600 sq ft.
Project has been registered with TDLR and is in pre-construction phase
Austin SSLC Replacement Kitchen Building is a New Construction project located at 2203 West 35th St. Building #800, Austin, TX 78703 in Austin, Texas. The project has an estimated value of $11.1M covering 9,600 sq ft. State of Texas is the property owner and Marmon Mok Architecture is the design firm of record. The project was registered with TDLR on June 22, 2026.
Austin SSLC Replacement Kitchen Building is a new construction project at 2203 West 35th St. Building #800 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of approximately 9,600 square feet for a central kitchen facility for the Austin SSLC Campus.
Austin SSLC Replacement Kitchen Building is still under construction in Austin, TX, with an estimated completion of May 2028 according to its TDLR registration.
Austin SSLC Replacement Kitchen Building is located at 2203 West 35th St. Building #800, Austin, TX, 78703, in Travis County.
State of Texas is the property owner/developer of record for Austin SSLC Replacement Kitchen Building, per its TDLR project registration.
Marmon Mok Architecture is the design firm of record for Austin SSLC Replacement Kitchen Building, according to its TDLR filing.
Austin SSLC Replacement Kitchen Building has an estimated construction value of $11.1M and approximately 9,600 square feet (about $1.16K/sqft), based on its TDLR filing.
New construction of approximately 9,600 square feet for a central kitchen facility for the Austin SSLC Campus.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 22, 2026
Review Complete
Inspection Complete
Closed
Building permits found at or near this location
New 200 amp riser for EV charging station Bldg 36
Install commission and interconnect a grid-tied ground mounted fixed tilt solar PV array.
Add 400 amp service
Temporary Power to power remodel at building 1. Primary metered at the AE pole with COA EI only inspecting the line side connections to the MLO/MCB and required grounding.
Upgrading existing commercial electrical services.