Project intelligenceTDLR TABS2026023682New Construction
Funding type

This project is privately funded, on private land for private use.

Evergreen - Drainage Channel Phase 3 in Conroe, TX

Forest Parkway, Conroe, TX, 77302

Opening ~May 2027Review Complete

Evergreen - Drainage Channel Phase 3 is a new construction project at Forest Parkway, Conroe, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $832K across about 14,455 sq ft.

Estimated project value
$832K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
14,455 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$58/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 24, 2026311 days across supplied datesMay 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    97 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    176 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Evergreen - Drainage Channel Phase 3

Evergreen Drainage Channel Phase 3 in Conroe

Texas Department of Licensing and Regulation (TDLR) records show that Evergreen, a drainage channel project located at Forest Parkway in Conroe, Texas, is a new construction effort registered in June 2026. The filing identifies the work as Trail, irrigation, and planting, covering an estimated 14,455 square feet. The registered accessibility specialist for this site is Laura Fulkerson, and the design firm of record is TBG Partners. The project is privately funded on private land for private use, with an estimated total cost of $832,000.

The TDLR completed its plan review in November 2026, and construction is scheduled to finish in May 2027, with work starting August 2026. This timeline creates a build window of 273 days, which is longer than the county median of 213 days for similar new construction filings in Montgomery County. The estimated cost of $832,000 is close to the county median of $800,000 for this type of work. The cost per square foot is calculated at $58, which is below the county median of $100 per square foot.

Third-party bid platforms, including ConstructConnect, list the project under the name Evergreen Drainage Channel Phase 3. These sources indicate that bids are requested for the work in Montgomery County, with specific bid dates noted in mid-2026. The filings describe the scope as site work for a water and sewer project, though the TDLR scope specifically highlights trail, irrigation, and planting elements. The project owner or developer of record is listed as Montgomery County MUD 163.

Monroe County, where Conroe is situated, had a median household income of $81,886 according to U.S. Census ACS 2023 five-year estimates for ZIP code 77302. The area contains approximately 19,787 residents and 7,040 housing units, with a median owner-occupied home value of $247,000. Housing in the area is predominantly owner-occupied. The local labor market showed a unemployment rate of 4.3 percent in September 2026, which was lower than a year earlier. TBG Partners has six other TDLR-registered projects totaling $4,142,644, including work in Magnolia, Houston, and Richmond.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77302 (Conroe)

One email per change. Unsubscribe in one click. Privacy.

Evergreen - Drainage Channel Phase 3 is a New Construction project located at Forest Parkway, Conroe, TX 77302 in Conroe, Texas. The project has an estimated value of $832K covering 14,455 sq ft. Montgomery County MUD 163 is the property owner and TBG Partners is the design firm of record. The project was registered with TDLR on June 24, 2026.

Frequently Asked Questions

Who is the owner of the Evergreen drainage project?

The owner of record for the Evergreen drainage channel project is Montgomery County MUD 163. The site is privately funded and located on private land.

What is the total cost of the Evergreen construction?

The estimated cost for the Evergreen project is $832,000. This covers the 14,455 square feet of trail, irrigation, and planting work.

When does construction start and finish?

Construction is scheduled to start in August 2026 and is scheduled to finish in May 2027. Plan review was completed in November 2026.

Is the Evergreen business open for customers?

The TDLR record covers construction only and does not record whether the business has started serving customers. The page tracks the building phase, not operational status.

What is the cost per square foot?

The cost per square foot is $58. This is calculated based on the $832,000 estimated cost and the 14,455 square foot scope.

What is Evergreen - Drainage Channel Phase 3?

Evergreen - Drainage Channel Phase 3 is a new construction project at Forest Parkway in Conroe, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Trail (14,455 SF), irrigation and planting.

Is Evergreen - Drainage Channel Phase 3 open in Conroe?

Evergreen - Drainage Channel Phase 3 is still under construction in Conroe, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Evergreen - Drainage Channel Phase 3 located?

Evergreen - Drainage Channel Phase 3 is located at Forest Parkway, Conroe, TX, 77302, in Montgomery County.

Who is the owner or developer of Evergreen - Drainage Channel Phase 3?

Montgomery County MUD 163 is the property owner/developer of record for Evergreen - Drainage Channel Phase 3, per its TDLR project registration.

Who is the architect or design firm for Evergreen - Drainage Channel Phase 3?

TBG Partners is the design firm of record for Evergreen - Drainage Channel Phase 3, according to its TDLR filing.

How much does Evergreen - Drainage Channel Phase 3 cost and how big is it?

Evergreen - Drainage Channel Phase 3 has an estimated construction value of $832K and approximately 14,455 square feet (about $58/sqft), based on its TDLR filing.

Scope of Work

Trail (14,455 SF), irrigation and planting.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Forest Parkway, Conroe, TX, 77302

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77302 (Conroe)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.