Funding type
This project is privately funded, on private land for private use.
IONNA TX-0073 in Houston, TX
11251 Fuqua St., Houston, TX, Houston, TX, 77089
IONNA TX-0073 is a new construction project at 11251 Fuqua St., Houston, TX, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $250K across about 2,000 sq ft.
- Estimated project value
- $250K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $125/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
43 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
88 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
30 days after the preceding date shown.
Source: TDLR filing
View source record
📰About IONNA TX-0073
Construction on Ionna Tx-0073, a new electric vehicle charging facility at 11251 Fuqua St. in Houston, is scheduled to finish in December 2026. The project, registered with TDLR in June 2026, involves the installation and modification of existing stalls to include five new chargers serving ten stalls. The work also includes site signage and electrical supporting equipment on a 2,000 sq ft site.
The estimated cost for this new construction is $250,000, resulting in a cost of $125 per square foot. This figure is above the Harris County median of $88 per square foot for similar new construction filings. However, the total project cost is below the county median of $750,000, placing it in the bottom quarter of estimated costs for this type of work in the area.
Project Scope and Design
WB Engineers + Consultants serves as the design firm of record for Ionna Tx-0073. The registered accessibility specialist is Justin K Walton. The scope is limited to the specific installation of charging infrastructure and necessary electrical modifications, rather than a full building renovation. This focused approach contributes to the project’s short scheduled build window of 30 days, which is shorter than the Harris County median of 219 days for new construction.
Fuqua Park Row, LLC is the owner and developer of record. The project is privately funded on private land for private use. TDLR completed plan review in August 2026, clearing the way for construction to begin in November 2026. The registration status is listed as Review Complete, indicating that the necessary accessibility and code reviews have been finalized before physical work starts.
WB Engineers + Consultants has been involved in six other TDLR-registered projects totaling $1,550,000. These include locations in Magnolia, Houston, Austin, and Pasadena, with individual project costs ranging from $250,000 to $350,000. The consistency in project scale suggests a standardized approach to EV charging infrastructure installation across these different Texas locations.
Local Context
The project is located in ZIP code 77089 in Harris County. U.S. Census American Community Survey estimates for 2023 indicate a population of about 56,607 in this area. The median household income is estimated at $87,262, with a median owner-occupied home value of $237,400. The area contains approximately 19,997 housing units, with housing predominantly owner-occupied. These demographic factors provide context for the demand for private EV charging infrastructure in the Houston region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77089 (Houston)
One email per change. Unsubscribe in one click. Privacy.
IONNA TX-0073 is a New Construction project located at 11251 Fuqua St., Houston, TX, Houston, TX 77089 in Houston, Texas. The project has an estimated value of $250K covering 2,000 sq ft. Fuqua Park Row, LLC is the property owner and WB Engineers + Consultants is the design firm of record. The project was registered with TDLR on June 24, 2026.
Frequently Asked Questions
When will the project be finished?
Construction is scheduled to finish in December 2026, with work starting in November 2026 after plan review was completed in August 2026.
How many EV chargers are being installed?
The project includes five new chargers that will serve a total of ten stalls, along with site signage and electrical supporting equipment.
Who is the owner of the property?
Fuqua Park Row, LLC is the owner and developer of record for this privately funded project located on private land.
Is the business open for service?
The TDLR record only covers construction status. The project is scheduled to finish in December 2026, and no information is provided regarding business opening dates or operational status.
Who designed the project?
WB Engineers + Consultants is the design firm of record, and Justin K Walton is the registered accessibility specialist for the project.
What is IONNA TX-0073?
IONNA TX-0073 is a new construction project at 11251 Fuqua St., Houston, TX in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation and modification of existing stalls to include 5 new chargers serving 10 stalls including site signage and electrical supporting equipment.
Is IONNA TX-0073 open in Houston?
IONNA TX-0073 is still under construction in Houston, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is IONNA TX-0073 located?
IONNA TX-0073 is located at 11251 Fuqua St., Houston, TX, Houston, TX, 77089, in Harris County.
Who is the owner or developer of IONNA TX-0073?
Fuqua Park Row, LLC is the property owner/developer of record for IONNA TX-0073, per its TDLR project registration.
Who is the architect or design firm for IONNA TX-0073?
WB Engineers + Consultants is the design firm of record for IONNA TX-0073, according to its TDLR filing.
How much does IONNA TX-0073 cost and how big is it?
IONNA TX-0073 has an estimated construction value of $250K and approximately 2,000 square feet (about $125/sqft), based on its TDLR filing.
Scope of Work
Installation and modification of existing stalls to include 5 new chargers serving 10 stalls including site signage and electrical supporting equipment.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
11251 Fuqua St., Houston, TX, Houston, TX, 77089
Watch all construction in 77089 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.