Project intelligenceTDLR TABS2026024236Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

METRO Route 73-Bellfort (MLK to IH45)

METRO Route 73-Bellfort (MLK to IH 45) Sidewalk Improvements, Houston, TX, 77061

Opening ~Mar 2027Review Complete

METRO Route 73-Bellfort (MLK to IH45) is a renovation/alteration project at METRO Route 73-Bellfort (MLK to IH 45) Sidewalk Improvements, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $1.9M across about 1 sq ft.

Estimated project value
$1.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1939.08K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 1, 2026243 days across supplied datesMar 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About METRO Route 73-Bellfort (MLK to IH45)

Metro is renovating sidewalks along Route 73-Bellfort in Houston, Texas. The project, filed as METRO Route 73-Bellfort (MLK to IH45), involves the construction of new sidewalks, pedestrian ramps, and landing areas in the 77061 ZIP code. This renovation/alteration work is scheduled to finish in March 2027, following a start date of September 2026.

The estimated cost for this infrastructure improvement is $1,939,082. This figure places the project in the top quarter of estimated costs for renovation and alteration filings in Harris County, where the median is $250,000. The scheduled build window of 181 days is longer than the county median of 92 days for similar projects. The filing lists the square footage as 1 sq ft, which reflects the linear nature of the sidewalk improvements rather than a building footprint.

Project Leadership and Design

Atlas serves as the design firm of record for this project. Kathy S Rodriguez is the registered accessibility specialist associated with the filing. Metro, the owner of record, has six other TDLR-registered projects in Houston, totaling $3,402,584. These include work on Metro Polk, Washington Ave, and the METRO Boost 56 Airline / Montrose Corridor. Atlas has also been the design firm for two other registered projects, including one at 202 N LBJ Drive in San Marcos.

The project involves public funds, public land, or is a Federally funded roadway project. TDLR completed the plan review in August 2026. The registration with the Texas Department of Licensing and Regulation (TDLR) was recorded in July 2026. The current status is Review Complete, indicating that the preliminary design phase has concluded and construction is set to begin in the fall.

Local Context

The work takes place in a Houston area with a population of about 24,238 residents. Census estimates for ZIP code 77061 indicate a median household income of $44,520 and a median owner-occupied home value of $215,200. The housing stock in this area is mostly renter-occupied. Improving pedestrian infrastructure in this corridor supports mobility for residents and commuters using the Bellfort line.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77061 (Houston)

One email per change. Unsubscribe in one click. Privacy.

METRO Route 73-Bellfort (MLK to IH45) is a Renovation/Alteration project located at METRO Route 73-Bellfort (MLK to IH 45) Sidewalk Improvements, Houston, TX 77061 in Houston, Texas. The project has an estimated value of $1.9M covering 1 sq ft. METRO is the property owner and Atlas is the design firm of record. The project was registered with TDLR on July 1, 2026.

Frequently Asked Questions

When is the sidewalk construction scheduled to finish?

Construction is scheduled to finish in March 2027. The work is planned to start in September 2026, following the completion of the plan review process in August 2026.

Who is the owner of this Metro project?

Metro is the owner and developer of record. The project is filed under the name METRO Route 73-Bellfort (MLK to IH45) Sidewalk Improvements.

What is the estimated cost of the renovation?

The estimated cost for the construction of sidewalks, pedestrian ramps, and landing areas is $1,939,082. This is above the median estimated cost for similar projects in Harris County.

Is the project currently open to the public?

The project is under construction. It is not a completed facility open for business. Construction is scheduled to finish in March 2027, with work starting in September 2026.

Who designed this accessibility project?

Atlas is the design firm of record. Kathy S Rodriguez is the registered accessibility specialist listed in the TDLR filing for this renovation.

What is METRO Route 73-Bellfort (MLK to IH45)?

METRO Route 73-Bellfort (MLK to IH45) is a renovation/alteration project at METRO Route 73-Bellfort (MLK to IH 45) Sidewalk Improvements in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of Sidewalk, Pedestrian Ramps and Landing Areas

Is METRO Route 73-Bellfort (MLK to IH45) open in Houston?

METRO Route 73-Bellfort (MLK to IH45) is still under construction in Houston, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is METRO Route 73-Bellfort (MLK to IH45) located?

METRO Route 73-Bellfort (MLK to IH45) is located at METRO Route 73-Bellfort (MLK to IH 45) Sidewalk Improvements, Houston, TX, 77061, in Harris County.

Who is the owner or developer of METRO Route 73-Bellfort (MLK to IH45)?

METRO is the property owner/developer of record for METRO Route 73-Bellfort (MLK to IH45), per its TDLR project registration.

Who is the architect or design firm for METRO Route 73-Bellfort (MLK to IH45)?

Atlas is the design firm of record for METRO Route 73-Bellfort (MLK to IH45), according to its TDLR filing.

How much does METRO Route 73-Bellfort (MLK to IH45) cost and how big is it?

METRO Route 73-Bellfort (MLK to IH45) has an estimated construction value of $1.9M and approximately 1 square feet (about $1939.08K/sqft), based on its TDLR filing.

Scope of Work

Construction of Sidewalk, Pedestrian Ramps and Landing Areas

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

METRO Route 73-Bellfort (MLK to IH 45) Sidewalk Improvements, Houston, TX, 77061

Location by street address

Watch all construction in 77061 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.