Project intelligenceTDLR TABS2026007531Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

METRO Boost 56 Airline/ Montrose Corridor

15 Boost Bus Stop Locations, Houston, TX, 77007

Construction complete · Aug 2026Project Closed

METRO Boost 56 Airline/ Montrose Corridor is a renovation/alteration project at 15 Boost Bus Stop Locations, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $180K across about 6,629 sq ft.

Estimated project value
$180K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,629 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$27/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 1, 2025354 days across supplied datesAug 21, 2026

6 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    99 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    3 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    243 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77007 (Houston)

One email per change. Unsubscribe in one click. Privacy.

METRO Boost 56 Airline/ Montrose Corridor is a Renovation/Alteration project located at 15 Boost Bus Stop Locations, Houston, TX 77007 in Houston, Texas. The project has an estimated value of $180K covering 6,629 sq ft. METRO is the property owner and Midtown Engineers is the design firm of record. The project was registered with TDLR on December 9, 2025.

Frequently Asked Questions

What is METRO Boost 56 Airline/ Montrose Corridor?

METRO Boost 56 Airline/ Montrose Corridor is a renovation/alteration project at 15 Boost Bus Stop Locations in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of BOOST shelter pad, pedestrian ramps and boarding/landing area of boost bus stops

Is METRO Boost 56 Airline/ Montrose Corridor open in Houston?

Construction on METRO Boost 56 Airline/ Montrose Corridor is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is METRO Boost 56 Airline/ Montrose Corridor located?

METRO Boost 56 Airline/ Montrose Corridor is located at 15 Boost Bus Stop Locations, Houston, TX, 77007, in Harris County.

Who is the owner or developer of METRO Boost 56 Airline/ Montrose Corridor?

METRO is the property owner/developer of record for METRO Boost 56 Airline/ Montrose Corridor, per its TDLR project registration.

Who is the architect or design firm for METRO Boost 56 Airline/ Montrose Corridor?

Midtown Engineers is the design firm of record for METRO Boost 56 Airline/ Montrose Corridor, according to its TDLR filing.

How much does METRO Boost 56 Airline/ Montrose Corridor cost and how big is it?

METRO Boost 56 Airline/ Montrose Corridor has an estimated construction value of $180K and approximately 6,629 square feet (about $27/sqft), based on its TDLR filing.

Scope of Work

Construction of BOOST shelter pad, pedestrian ramps and boarding/landing area of boost bus stops

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

15 Boost Bus Stop Locations, Houston, TX, 77007