Project intelligenceTDLR TABS2022015959Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2

Airline Dr (Calvacade St to Tidwell Rd), Houston, TX, 77009

Construction complete · Dec 2025Project Closed

METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 is a renovation/alteration project at Airline Dr (Calvacade St to Tidwell Rd), Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2025). The project has an estimated value of $2.5M across about 100,000 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
100,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$25/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 6, 20221,365 days across supplied datesDec 31, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,309 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77009 (Houston)

One email per change. Unsubscribe in one click. Privacy.

METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 is a Renovation/Alteration project located at Airline Dr (Calvacade St to Tidwell Rd), Houston, TX 77009 in Houston, Texas. The project has an estimated value of $2.5M covering 100,000 sq ft. METRO is the property owner and Midtown Engineers is the design firm of record. The project was registered with TDLR on April 6, 2022.

Frequently Asked Questions

What is METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2?

METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 is a renovation/alteration project at Airline Dr (Calvacade St to Tidwell Rd) in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalk, Pedestrian ramps, pavement replace, repair & installation. Signing & Pavement markings & traffic control devices. Pedestrian refuges & Median Islands. BOOST Bus stops, Shared Use Path Elements & Electrical Srvce…

Is METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 open in Houston?

Construction on METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2025. The building is finished and very likely open.

Where is METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 located?

METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 is located at Airline Dr (Calvacade St to Tidwell Rd), Houston, TX, 77009, in Harris County.

Who is the owner or developer of METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2?

METRO is the property owner/developer of record for METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2, per its TDLR project registration.

Who is the architect or design firm for METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2?

Midtown Engineers is the design firm of record for METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2, according to its TDLR filing.

How much does METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 cost and how big is it?

METRO BOOST Bus Stops and Sidewalk Improvements-Segment 2 has an estimated construction value of $2.5M and approximately 100,000 square feet (about $25/sqft), based on its TDLR filing.

Scope of Work

Construction of sidewalk, Pedestrian ramps, pavement replace, repair & installation. Signing & Pavement markings & traffic control devices. Pedestrian refuges & Median Islands. BOOST Bus stops, Shared Use Path Elements & Electrical Srvce Connections

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Airline Dr (Calvacade St to Tidwell Rd), Houston, TX, 77009

Location by street address