Project intelligenceTDLR TABS2026024881Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

McCormick Road Improvements in Oak Point, TX

From Naylor Road to Oak Grove Parkway (FM 720), Oak Point, TX, 75068

Opening ~Feb 2027Review Complete

McCormick Road Improvements is a renovation/alteration project at From Naylor Road to Oak Grove Parkway (FM 720), Oak Point, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $150K across about 19,770 sq ft.

Estimated project value
$150K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
19,770 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 9, 2026207 days across supplied datesFeb 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    23 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    179 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About McCormick Road Improvements

The City of Oak Point is undertaking a renovation and alteration project along McCormick Road, specifically between Naylor Road and Oak Grove Parkway (FM 720). The scope of work includes the construction of 19,770 square feet of sidewalk and seven ADA-compliant ramps. This infrastructure upgrade is integrated into a broader roadway improvement initiative in Denton County.

BGE, Inc. serves as the design firm of record for this project. Sharlynn L Keys is the registered accessibility specialist responsible for ensuring the design meets accessibility standards. The estimated cost for this work is $150,000, which equates to $8 per square foot. This figure is below the county median of $80 per square foot for similar renovation and alteration filings in Denton County.

Project Timeline and Status

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in July 2026. Plan review was completed in August 2026, and construction is scheduled to finish in February 2027. The filing indicates that work started in August 2026. The TDLR status is listed as Review Complete, confirming that the design phase has been validated prior to the construction window.

The scheduled build window for this project is 184 days. This duration is longer than the county median of 92 days for comparable renovation and alteration projects in Denton County. The extended timeline reflects the specific requirements of integrating sidewalk and ramp construction into an active roadway environment.

Funding for this project involves public funds, public land, or is part of a Federally funded roadway project. The City of Oak Point is the owner and developer of record. The area around ZIP code 75068 has a population of approximately 70,562, with a median household income of $126,341 according to U.S. Census ACS 2023 five-year estimates. The housing stock in this area is predominantly owner-occupied, with a median owner-occupied home value of $386,300.

BGE, Inc. has six other TDLR-registered projects totaling $12,850,423. These include the Bunton Reserve Amenity Center in Kyle, Harris County W.C.I.D. No. 157 in Cypress, and Fort Bend County MUD No. 50 in Richmond. The McCormick Road Improvements project fits within the firm's portfolio of public infrastructure and accessibility-focused developments across Texas.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75068 (Oak Point)

One email per change. Unsubscribe in one click. Privacy.

McCormick Road Improvements is a Renovation/Alteration project located at From Naylor Road to Oak Grove Parkway (FM 720), Oak Point, TX 75068 in Oak Point, Texas. The project has an estimated value of $150K covering 19,770 sq ft. City of Oak Point, Texas is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on July 9, 2026.

Frequently Asked Questions

What is the scope of the McCormick Road Improvements project?

The project involves constructing 19,770 square feet of sidewalk and seven ADA ramps as part of a roadway improvement from Naylor Road to Oak Grove Parkway in Oak Point.

Who is the design firm for this project?

BGE, Inc. is the design firm of record, and Sharlynn L Keys is the registered accessibility specialist listed on the filing.

When is construction scheduled to finish?

Construction is scheduled to finish in February 2027, with work starting in August 2026 following the completion of plan review.

What is the estimated cost of the project?

The estimated cost is $150,000, which calculates to $8 per square foot for the 19,770 square feet of new sidewalk and ramps.

Is the project funded by public money?

Yes, the filing states the project involves public funds, public land, or is a Federally funded roadway project.

What is McCormick Road Improvements?

McCormick Road Improvements is a renovation/alteration project at From Naylor Road to Oak Grove Parkway (FM 720) in Oak Point, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 19,770 SF of Sidewalk & 7 ADA Ramps. Construction of sidewalk and ADA Ramps as a part of a roadway improvement project.

Is McCormick Road Improvements open in Oak Point?

McCormick Road Improvements is still under construction in Oak Point, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is McCormick Road Improvements located?

McCormick Road Improvements is located at From Naylor Road to Oak Grove Parkway (FM 720), Oak Point, TX, 75068, in Denton County.

Who is the owner or developer of McCormick Road Improvements?

City of Oak Point, Texas is the property owner/developer of record for McCormick Road Improvements, per its TDLR project registration.

Who is the architect or design firm for McCormick Road Improvements?

BGE, Inc. is the design firm of record for McCormick Road Improvements, according to its TDLR filing.

How much does McCormick Road Improvements cost and how big is it?

McCormick Road Improvements has an estimated construction value of $150K and approximately 19,770 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

19,770 SF of Sidewalk & 7 ADA Ramps. Construction of sidewalk and ADA Ramps as a part of a roadway improvement project.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From Naylor Road to Oak Grove Parkway (FM 720), Oak Point, TX, 75068

Loading location map…
33.18388, -97.14134

Watch all construction in 75068 (Oak Point)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Oak Point?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.