Project intelligenceTDLR TABS2026024957Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Burger King

209 S. Timberland Dr, Lufkin, TX, 75901

Opening ~Dec 2026Review Complete

Burger King is a renovation/alteration project at 209 S. Timberland Dr, Lufkin, in Angelina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $550K across about 3,145 sq ft.

Estimated project value
$550K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,145 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$175/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 1, 2026183 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    146 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Burger King

A Burger King at 209 S. Timberland Dr in Lufkin is undergoing a renovation to meet new corporate standards. The project involves remodeling the existing 3,145 sq ft dining area and upgrading the exterior elevation. This work is scheduled to finish in December 2026, following a start date of July 2026. The estimated cost for the project is $550,000, which translates to $175 per square foot.

The renovation is being executed by FCPT Holdings, LLC, the owner of record. KnZ Architects serves as the design firm for the project. James A Gee is the registered accessibility specialist associated with the filing. The scope includes modifications to HVAC and electrical systems as required by the new Burger King Sizzle standards. The work is classified as a renovation or alteration of the existing structure.

Project Context and Cost Analysis

The estimated cost of $550,000 is above the median estimated cost of $250,000 for renovation and alteration filings in Angelina County. The project size of 3,145 sq ft is slightly below the county median of 3,750 sq ft. The cost per square foot of $175 is above the county median of $84 per square foot. The scheduled build window of 183 days is longer than the county median of 121 days for similar projects.

FCPT Holdings, LLC has one other TDLR-registered project in the system, a Chili’s in Brownsville with an estimated cost of $150,000 that is closed. KnZ Architects has one other TDLR-registered project, a car dealership in Houston with an estimated cost of $1,000,000 that is review complete.

TDLR completed plan review in August 2026. The project was registered with TDLR in July 2026. The status is listed as Review Complete. The project is privately funded and located on private land for private use. The address is in Angelina County, Texas. The ZIP code 75901 has a population of about 28,602 according to U.S. Census ACS 2023 five-year estimates.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75901 (Lufkin)

One email per change. Unsubscribe in one click. Privacy.

Burger King is a Renovation/Alteration project located at 209 S. Timberland Dr, Lufkin, TX 75901 in Lufkin, Texas. The project has an estimated value of $550K covering 3,145 sq ft. FCPT Holdings, LLC is the property owner and KnZ Architects is the design firm of record. The project was registered with TDLR on July 9, 2026.

Frequently Asked Questions

Is the Burger King open?

The TDLR record indicates construction is scheduled to finish in December 2026. It does not confirm the business is open or operating. Third-party reviews exist, but construction status and business opening are different things.

Who is the owner of the project?

FCPT Holdings, LLC is the owner or developer of record for this Burger King renovation project in Lufkin, Texas.

What is the estimated cost?

The estimated cost for the renovation is $550,000. This is above the median cost for similar renovation filings in Angelina County.

Who is the design firm?

KnZ Architects is the design firm of record for the Burger King renovation project in Lufkin.

When is the project scheduled to finish?

The project is scheduled to finish in December 2026. Construction started in July 2026 and plan review was completed in August 2026.

What is Burger King?

Burger King is a renovation/alteration project at 209 S. Timberland Dr in Lufkin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing 3,145 SF Burger King to comply with new Burger King Sizzle standards. Includes dining area and exterior elevation upgrades, with hvac and electrical systems modified as required.

Is Burger King open in Lufkin?

Burger King is still under construction in Lufkin, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Burger King located?

Burger King is located at 209 S. Timberland Dr, Lufkin, TX, 75901, in Angelina County.

Who is the owner or developer of Burger King?

FCPT Holdings, LLC is the property owner/developer of record for Burger King, per its TDLR project registration.

Who is the architect or design firm for Burger King?

KnZ Architects is the design firm of record for Burger King, according to its TDLR filing.

How much does Burger King cost and how big is it?

Burger King has an estimated construction value of $550K and approximately 3,145 square feet (about $175/sqft), based on its TDLR filing.

Scope of Work

Remodel of existing 3,145 SF Burger King to comply with new Burger King Sizzle standards. Includes dining area and exterior elevation upgrades, with hvac and electrical systems modified as required.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

209 S. Timberland Dr, Lufkin, TX, 75901

31.33480, -94.71891

Watch all construction in 75901 (Lufkin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.