Project intelligenceTDLR EABPRJB2802768New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

LUFKIN FIRE STATION NO. 3

1404 EAST LUFKIN AVENUE, Lufkin, TX, 75901

Construction complete · Sep 2012Project Closed

LUFKIN FIRE STATION NO. 3 is a new construction project at 1404 EAST LUFKIN AVENUE, Lufkin, in Angelina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $1.3M.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 28, 2011309 days across supplied datesSep 1, 2012

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    65 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    244 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75901 (Lufkin)

One email per change. Unsubscribe in one click. Privacy.

LUFKIN FIRE STATION NO. 3 is a New Construction project located at 1404 EAST LUFKIN AVENUE, Lufkin, TX 75901 in Lufkin, Texas. The project has an estimated value of $1.3M. CITY OF LUFKIN is the property owner and GOODWIN-LASITER INC. is the design firm of record. The project was registered with TDLR on October 28, 2011.

Frequently Asked Questions

What is LUFKIN FIRE STATION NO. 3?

LUFKIN FIRE STATION NO. 3 is a new construction project at 1404 EAST LUFKIN AVENUE in Lufkin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of fire station.

Is LUFKIN FIRE STATION NO. 3 open in Lufkin?

Construction on LUFKIN FIRE STATION NO. 3 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.

Where is LUFKIN FIRE STATION NO. 3 located?

LUFKIN FIRE STATION NO. 3 is located at 1404 EAST LUFKIN AVENUE, Lufkin, TX, 75901, in Angelina County.

Who is the owner or developer of LUFKIN FIRE STATION NO. 3?

CITY OF LUFKIN is the property owner/developer of record for LUFKIN FIRE STATION NO. 3, per its TDLR project registration.

Who is the architect or design firm for LUFKIN FIRE STATION NO. 3?

GOODWIN-LASITER INC. is the design firm of record for LUFKIN FIRE STATION NO. 3, according to its TDLR filing.

How much does LUFKIN FIRE STATION NO. 3 cost and how big is it?

LUFKIN FIRE STATION NO. 3 has an estimated construction value of $1.3M, based on its TDLR filing.

Scope of Work

New construction of fire station.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1404 EAST LUFKIN AVENUE, Lufkin, TX, 75901

31.33659, -94.71457

Watch all construction in 75901 (Lufkin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.