Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
San Jacinto Junior High Renovations in Midland, TX
1400 N. N Street, Midland, TX, 79701
San Jacinto Junior High Renovations is a renovation/alteration project at 1400 N. N Street, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $15.5M across about 24,565 sq ft.
- Estimated project value
- $15.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 24,565 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $631/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 years
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
43 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
2 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
728 days after the preceding date shown.
Source: TDLR filing
View source record
📰About San Jacinto Junior High Renovations
Midland Independent School District is renovating its San Jacinto Junior High campus at 1400 N. N Street in Midland. The project involves additions and alterations to a 24,565 sq ft facility, with an estimated cost of $15,500,000. TDLR completed plan review in September 2026, and construction is scheduled to finish in August 2028, with work starting September 2026.
Project Scope and Design
JSA Architects, Inc. serves as the design firm of record for this renovation. Stephen D Macphie is the registered accessibility specialist associated with the filing. The scope of work is defined as additions and alterations, consistent with the project type listed as Renovation/Alteration in the TDLR record. The estimated cost per square foot is $631, a figure derived from the total estimated cost and the stated square footage.
Midland Independent School District has six other TDLR-registered projects totaling $52,600,000, including renovations for Scharbauer Elementary, Bush Elementary, and DeZavala Elementary. JSA Architects, Inc. has six other TDLR-registered projects totaling $61,700,000, including work for Green Tree Country Club and Ingram Independent School District. These records indicate a pattern of significant capital investment and architectural collaboration in the region.
Regional Context and Funding
The project involves public funds, public land, or is a Federally funded roadway project, as noted in the funding description. Among 1,061 TDLR-registered renovation and alteration filings in Midland County, the median estimated cost is $250,000. This project’s cost is above the county median for its type, placing it in the top quarter of filings. The scheduled build window of 730 days is longer than the county median of 122 days.
U.S. Census Bureau American Community Survey 2023 five-year estimates for ZIP code 79701 indicate a population of about 27,678 and a median household income of $57,679. The area includes 11,393 housing units, with a median owner-occupied home value of $204,000. Housing in this ZIP code is mostly owner-occupied, per Census estimates. Midland County unemployment rate (FRED, July 2026) is 3.4 percent.
Wikipedia describes Midland Independent School District as a public school district in Midland, Texas, containing 41 campuses. U.S. These third-party descriptions provide background on the district’s scale and demographic profile, though they are not part of the TDLR filing record.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79701 (Midland)
One email per change. Unsubscribe in one click. Privacy.
San Jacinto Junior High Renovations is a Renovation/Alteration project located at 1400 N. N Street, Midland, TX 79701 in Midland, Texas. The project has an estimated value of $15.5M covering 24,565 sq ft. Midland Independent School District is the property owner and JSA Architects, Inc. is the design firm of record. The project was registered with TDLR on July 20, 2026.
Frequently Asked Questions
When is the construction scheduled to finish?
Construction is scheduled to finish in August 2028, with work starting in September 2026. TDLR completed plan review in September 2026, and the project status is Review Complete.
Who is the design firm for this project?
JSA Architects, Inc. is the design firm of record for the San Jacinto Junior High Renovations. Stephen D Macphie is the registered accessibility specialist associated with the TDLR filing.
What is the estimated cost of the renovation?
The estimated cost is $15,500,000 for 24,565 sq ft of work. This equates to $631 per square foot, which is above the Midland County median of $80 per square foot for similar filings.
Is the school open to the public during construction?
The TDLR record only documents construction status and does not specify operational hours or public access. The project is scheduled to finish in August 2028, so operational status during construction is not detailed in the filing.
What type of work is being done?
The scope of work includes additions and alterations to the existing facility. The project type is listed as Renovation/Alteration, and the filing involves public funds or federally funded components.
What is San Jacinto Junior High Renovations?
San Jacinto Junior High Renovations is a renovation/alteration project at 1400 N. N Street in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additions and alterations
Is San Jacinto Junior High Renovations open in Midland?
San Jacinto Junior High Renovations is still under construction in Midland, TX, with an estimated completion of Aug 2028 according to its TDLR registration.
Where is San Jacinto Junior High Renovations located?
San Jacinto Junior High Renovations is located at 1400 N. N Street, Midland, TX, 79701, in Midland County.
Who is the owner or developer of San Jacinto Junior High Renovations?
Midland Independent School District is the property owner/developer of record for San Jacinto Junior High Renovations, per its TDLR project registration.
Who is the architect or design firm for San Jacinto Junior High Renovations?
JSA Architects, Inc. is the design firm of record for San Jacinto Junior High Renovations, according to its TDLR filing.
How much does San Jacinto Junior High Renovations cost and how big is it?
San Jacinto Junior High Renovations has an estimated construction value of $15.5M and approximately 24,565 square feet (about $631/sqft), based on its TDLR filing.
Scope of Work
Additions and alterations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1400 N. N Street, Midland, TX, 79701
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$56.1M totalWatch all construction in 79701 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.