Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Abell Junior High Renovations
3201 Heritage Blvd., Midland, TX, 79707
Abell Junior High Renovations is a renovation/alteration project at 3201 Heritage Blvd., Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $25.5M across about 20,245 sq ft.
- Estimated project value
- $25.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 20,245 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.26K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 years
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
43 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
2 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
728 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Abell Junior High Renovations
Midland Independent School District is renovating Abell Junior High School at 3201 Heritage Blvd. in Midland. The project involves additions and alterations totaling 20,245 square feet. The estimated cost is $25,500,000, which calculates to $1,260 per square foot. This scope of work is registered with the Texas Department of Licensing and Regulation (TDLR) as a renovation and alteration project.
The construction timeline is substantial, with work starting in September 2026 and scheduled to finish in August 2028. TDLR completed the plan review in September 2026, clearing the path for construction. The registered accessibility specialist for this filing is Stephen D Macphie. The project utilizes public funds and is located on public land within Midland County.
Project Scale and Context
At $25,500,000, this project's cost is above the county median for renovation and alteration filings. The median estimated cost for similar projects in Midland County is $250,000. The scheduled build window for this project is 730 days, which is longer than the county median of 122 days. The cost per square foot of $1,260 is also above the county median of $80 per square foot for this type of work.
Midland Independent School District has six other TDLR-registered projects totaling $42,600,000. These include renovations at N/A, Scharbauer Elementary School, Bush Elementary School, and DeZavala Elementary School, all of which have completed review. JSA Architects, Inc. is the design firm of record. The firm has six other TDLR-registered projects totaling $51,700,000, including work for Green Tree Country Club and Ingram Independent School District.
Local Context
The project is located in ZIP code 79707, which has a population of about 39,881 people. The median household income in this area is $99,979, and the median owner-occupied home value is $382,400. Midland County had an unemployment rate of 3.4 percent in July 2026. Midland ISD serves a large student body, with U.S. News Education reporting that the district contains 40 schools and 28,752 students.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79707 (Midland)
One email per change. Unsubscribe in one click. Privacy.
Abell Junior High Renovations is a Renovation/Alteration project located at 3201 Heritage Blvd., Midland, TX 79707 in Midland, Texas. The project has an estimated value of $25.5M covering 20,245 sq ft. Midland Independent School District is the property owner and JSA Architects, Inc. is the design firm of record. The project was registered with TDLR on July 20, 2026.
Frequently Asked Questions
When will the Abell Junior High renovations be finished?
Construction is scheduled to finish in August 2028. Work started in September 2026, following the completion of the TDLR plan review in the same month.
How much is the Abell Junior High renovation project costing?
The estimated cost for the project is $25,500,000. This amount covers the additions and alterations for the 20,245 square foot facility.
Who is the architect for this school renovation?
JSA Architects, Inc. is the design firm of record for the Abell Junior High renovations. They are responsible for the architectural plans approved by TDLR.
Is the school open for classes during the renovation?
The TDLR record details the construction status and timeline but does not specify the operational status of the school during the renovation period. The project is scheduled to finish in August 2028.
What is the size of the renovation project?
The project encompasses 20,245 square feet of additions and alterations. This scope is significantly larger than the median size of 5,000 square feet for similar county filings.
What is Abell Junior High Renovations?
Abell Junior High Renovations is a renovation/alteration project at 3201 Heritage Blvd. in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additions and alterations
Is Abell Junior High Renovations open in Midland?
Abell Junior High Renovations is still under construction in Midland, TX, with an estimated completion of Aug 2028 according to its TDLR registration.
Where is Abell Junior High Renovations located?
Abell Junior High Renovations is located at 3201 Heritage Blvd., Midland, TX, 79707, in Midland County.
Who is the owner or developer of Abell Junior High Renovations?
Midland Independent School District is the property owner/developer of record for Abell Junior High Renovations, per its TDLR project registration.
Who is the architect or design firm for Abell Junior High Renovations?
JSA Architects, Inc. is the design firm of record for Abell Junior High Renovations, according to its TDLR filing.
How much does Abell Junior High Renovations cost and how big is it?
Abell Junior High Renovations has an estimated construction value of $25.5M and approximately 20,245 square feet (about $1.26K/sqft), based on its TDLR filing.
Scope of Work
Additions and alterations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3201 Heritage Blvd., Midland, TX, 79707
Related Projects
Same Owner
$56.1M totalWatch all construction in 79707 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.