Project intelligenceTDLR TABS2026026311Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

UT MER B3 HVAC & LIFE SAFETY SYSTEMS

10100 Harry Ransom Trail, Austin, TX, 78758

Opening ~Feb 2028Review Complete

UT MER B3 HVAC & LIFE SAFETY SYSTEMS is a renovation/alteration project at 10100 Harry Ransom Trail, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $46.5M across about 101,247 sq ft.

Estimated project value
$46.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
101,247 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$459/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 28, 2026580 days across supplied datesFeb 28, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    545 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About UT MER B3 HVAC & LIFE SAFETY SYSTEMS

The University of Texas Microelectronics Research Center is undergoing a comprehensive renovation of its HVAC, life safety, and electrical systems at 10100 Harry Ransom Trail in Austin. This 101,247 sq ft project, identified as UT MER B3 Hvac & Life Safety Systems, involves significant upgrades to existing building infrastructure, including ductwork, lighting, electrical devices, and fire alarm systems. The work also includes site modifications and restroom renovations to comply with Texas Accessibility Standards. With an estimated cost of $46,465,346, this is a major capital improvement effort for the facility.

Kirksey Architecture serves as the design firm of record for this renovation. The project is registered with TDLR, and the plan review process was completed in August 2026. Construction is scheduled to begin in September 2026 and is scheduled to finish in February 2028. This timeline represents a substantial build window compared to typical renovation projects in the region.

Project Scope and Cost

The scope of work focuses on modernizing critical building systems. This includes replacing or upgrading HVAC units and associated ductwork, as well as updating lighting and electrical devices in affected areas. The project also addresses life safety by upgrading fire alarm and gas monitoring systems. Additionally, the filing notes restroom renovations to meet TAS compliance standards. The estimated cost of $46,465,346 translates to approximately $459 per square foot, a figure that is above the county median for similar renovation and alteration filings in Travis County.

This project is one of several significant initiatives associated with The University of Texas. The university has six other TDLR-registered projects totaling $25,617,000, including facilities in Houston and Dallas. Kirksey Architecture, the design firm, has also been involved in six other TDLR-registered projects totaling $33,835,013, with locations in Austin, Houston, and Sugar Land. The current project stands out for its scale and specific focus on systems renovation within a research center context.

The surrounding area, defined by ZIP code 78758, has a population of about 50,592 and a median household income of $69,019 according to U.S. Census estimates. Housing in this area is predominantly renter-occupied. The project is funded by public funds and involves public land. City of Austin permit records show one electrical permit on file at this street address, issued in September 2025, specifically for the University of Texas at Austin MER project.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78758 (Austin)

One email per change. Unsubscribe in one click. Privacy.

UT MER B3 HVAC & LIFE SAFETY SYSTEMS is a Renovation/Alteration project located at 10100 Harry Ransom Trail, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $46.5M covering 101,247 sq ft. The University of Texas is the property owner and Kirksey Architecture is the design firm of record. The project was registered with TDLR on July 28, 2026.

Frequently Asked Questions

When will the construction be finished?

Construction is scheduled to finish in February 2028. The project is expected to begin in September 2026, following the completion of plan review in August 2026.

What is the estimated cost of the renovation?

The estimated cost for the HVAC and life safety systems renovation is $46,465,346. This figure covers the scope of work including ductwork, electrical devices, and fire alarm upgrades.

Who is the design firm for this project?

Kirksey Architecture is the design firm of record for the University of Texas Microelectronics Research Center renovation. They are responsible for the architectural and design aspects of the project.

What systems are being renovated?

The project includes renovations to HVAC units and ductwork, lighting and electrical devices, and upgrades to fire alarm and gas monitor systems. Restroom renovations to comply with TAS are also included.

Is the project located in a flood zone?

This means it is not in a high-risk flood area according to FEMA data.

What is UT MER B3 HVAC & LIFE SAFETY SYSTEMS?

UT MER B3 HVAC & LIFE SAFETY SYSTEMS is a renovation/alteration project at 10100 Harry Ransom Trail in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing building systems including HVAC units and ductwork, lighting and electrical devices in affected areas, and upgrades to the fire alarm and gas monitor systems. Some site work and restroom renovations to comply with…

Is UT MER B3 HVAC & LIFE SAFETY SYSTEMS open in Austin?

UT MER B3 HVAC & LIFE SAFETY SYSTEMS is still under construction in Austin, TX, with an estimated completion of Feb 2028 according to its TDLR registration.

Where is UT MER B3 HVAC & LIFE SAFETY SYSTEMS located?

UT MER B3 HVAC & LIFE SAFETY SYSTEMS is located at 10100 Harry Ransom Trail, Austin, TX, 78758, in Travis County.

Who is the owner or developer of UT MER B3 HVAC & LIFE SAFETY SYSTEMS?

The University of Texas is the property owner/developer of record for UT MER B3 HVAC & LIFE SAFETY SYSTEMS, per its TDLR project registration.

Who is the architect or design firm for UT MER B3 HVAC & LIFE SAFETY SYSTEMS?

Kirksey Architecture is the design firm of record for UT MER B3 HVAC & LIFE SAFETY SYSTEMS, according to its TDLR filing.

How much does UT MER B3 HVAC & LIFE SAFETY SYSTEMS cost and how big is it?

UT MER B3 HVAC & LIFE SAFETY SYSTEMS has an estimated construction value of $46.5M and approximately 101,247 square feet (about $459/sqft), based on its TDLR filing.

Scope of Work

Renovations to existing building systems including HVAC units and ductwork, lighting and electrical devices in affected areas, and upgrades to the fire alarm and gas monitor systems. Some site work and restroom renovations to comply with TAS.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

10100 Harry Ransom Trail, Austin, TX, 78758

30.38590, -97.72809

Related City Permits

Building permits found at or near this location

10100 HARRY RANSOM TRL
Same location

This is for The University of Texas at Austin MER project located at the JJ Pickle Campus. Tie in existing solar feed to new switchgear.

PendingElectrical PermitAuxiliary PowerSep 2025
View Details
2025-098094 EP
Tumlinson Electric

Watch all construction in 78758 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.