Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Howell Drive & Bullock Drive Street Reconstruction
Howell Drive & Bullock Drive, Coppell, TX, 75019
Howell Drive & Bullock Drive Street Reconstruction is a new construction project at Howell Drive & Bullock Drive, Coppell, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $3.0M across about 1,500 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.97K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
213 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
10 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
4 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
11 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Howell Drive & Bullock Drive Street Reconstruction
The Howell Drive & Bullock Drive Street Reconstruction project in Coppell is complete. The TDLR record shows the project passed its final TDLR accessibility inspection in August 2026, confirming that construction has finished.
Located north of Southwestern Boulevard at the intersection of Howell Drive and Bullock Drive, this new construction effort involved 1,400 linear feet of road reconstruction. The scope extended beyond the pavement to include associated improvements to water, wastewater, storm sewer, and alley infrastructure.
The City of Coppell serves as the owner of record for this $2,950,000 project. Westwood Professional Services, Inc. was the design firm of record, and Ross A Thomas was the registered accessibility specialist. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in August 2026, with plan review completed in the same month.
Construction began in January 2026, resulting in a scheduled build window of 238 days. This timeline is close to the median scheduled build window of 243 days for new construction filings in Dallas County. The estimated cost of $2,950,000 is above the county median of $950,000 for similar projects. The project size is listed as 1,500 sq ft, which yields a cost per square foot of $1,967, significantly above the county median of $125 per square foot.
The City of Coppell has two other TDLR-registered projects: The Core, valued at $443,918 with review complete, and Woodhurst Drive, valued at $5,940,000 with the project closed. Westwood Professional Services, Inc. has six other TDLR-registered projects totaling $8,954,095, including work in Austin, Celina, Arlington, Addison, and Dallas.
The project involved public funds and public land. The ZIP code 75019 has a population of about 44,707, with a median household income of $134,174. The Dallas County unemployment rate was 3.3 percent in July 2026.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75019 (Coppell)
One email per change. Unsubscribe in one click. Privacy.
Howell Drive & Bullock Drive Street Reconstruction is a New Construction project located at Howell Drive & Bullock Drive,, Coppell, TX 75019 in Coppell, Texas. The project has an estimated value of $3.0M covering 1,500 sq ft. City Of Coppell is the property owner and Westwood Professional Services, Inc. is the design firm of record. The project was registered with TDLR on August 6, 2026.
Frequently Asked Questions
Is the Howell Drive & Bullock Drive reconstruction finished?
Yes, the project passed its final TDLR accessibility inspection in August 2026, indicating construction is complete.
Who is the owner of the Howell Drive & Bullock Drive project?
The City of Coppell is the owner of record for this street reconstruction project.
What was the scope of work for this project?
The work included 1,400 linear feet of road reconstruction plus water, wastewater, storm sewer, and alley improvements.
Who designed the Howell Drive & Bullock Drive reconstruction?
Westwood Professional Services, Inc. was the design firm of record for this project.
What is Howell Drive & Bullock Drive Street Reconstruction?
Howell Drive & Bullock Drive Street Reconstruction is a new construction project at Howell Drive & Bullock Drive in Coppell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1400 Linear Feet of road reconstruction with associated water, wastewater, storm sewer, & alley improvements.
Is Howell Drive & Bullock Drive Street Reconstruction open in Coppell?
Construction on Howell Drive & Bullock Drive Street Reconstruction is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is Howell Drive & Bullock Drive Street Reconstruction located?
Howell Drive & Bullock Drive Street Reconstruction is located at Howell Drive & Bullock Drive, Coppell, TX, 75019, in Dallas County.
Who is the owner or developer of Howell Drive & Bullock Drive Street Reconstruction?
City Of Coppell is the property owner/developer of record for Howell Drive & Bullock Drive Street Reconstruction, per its TDLR project registration.
Who is the architect or design firm for Howell Drive & Bullock Drive Street Reconstruction?
Westwood Professional Services, Inc. is the design firm of record for Howell Drive & Bullock Drive Street Reconstruction, according to its TDLR filing.
How much does Howell Drive & Bullock Drive Street Reconstruction cost and how big is it?
Howell Drive & Bullock Drive Street Reconstruction has an estimated construction value of $3.0M and approximately 1,500 square feet (about $1.97K/sqft), based on its TDLR filing.
Scope of Work
1400 Linear Feet of road reconstruction with associated water, wastewater, storm sewer, & alley improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Howell Drive & Bullock Drive, Coppell, TX, 75019
Related Projects
Same Owner
$3.6M totalWatch all construction in 75019 (Coppell)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Coppell?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.