Funding type
This project is privately funded, on private land for private use.
219013 Austin Electric Vehicle Charging
301 1/2 N Lamar Blvd, Austin, TX, 78703
219013 Austin Electric Vehicle Charging is a new construction project at 301 1/2 N Lamar Blvd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $600K across about 11,380 sq ft.
- Estimated project value
- $600K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,380 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $53/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
66 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
120 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 219013 Austin Electric Vehicle Charging
A new construction project at 301 1/2 N Lamar Blvd in Austin is adding 16 electric vehicle chargers and associated electrical equipment to an existing surface parking lot. The development covers 11,380 sq ft with an estimated cost of $600,000, which works out to $53 per square foot. This work is registered with TDLR under the project name 219013 Austin Electric Vehicle Charging, and the filing status is Project Registered.
The owner of record is Lorenz Perry, who is using Westwood Professional Services, Inc. as the design firm. Blair Baker is the registered accessibility specialist for the project. The work is privately funded on private land for private use, and the filing lists a construction start date of November 2026. The project is targeted for March 2027, with plan review pending.
Cost and Timeline Context
Compared to 6,777 other TDLR-registered new construction filings in Travis County, this project’s $600,000 estimated cost is below the county median of $1,000,000. The $53 per square foot cost is also below the county median of $125. The scheduled build window of 120 days is shorter than the county median of 304 days, reflecting a focused scope of work rather than a full building construction.
Westwood Professional Services, Inc. The firm’s recent filings show a mix of completed inspections and pending reviews, indicating an active portfolio of commercial and public infrastructure work.
This designation is standard for much of the Austin metropolitan area and does not indicate a high-risk flood zone. The project’s electrical upgrades will be integrated into the existing parking lot infrastructure to support growing demand for EV charging in the downtown Austin area.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78703 (Austin)
One email per change. Unsubscribe in one click. Privacy.
219013 Austin Electric Vehicle Charging is a New Construction project located at 301 1/2 N Lamar Blvd, Austin, TX 78703 in Austin, Texas. The project has an estimated value of $600K covering 11,380 sq ft. Lorenz Perry is the property owner and Westwood Professional Services, Inc. is the design firm of record. The project was registered with TDLR on September 10, 2026.
Frequently Asked Questions
Is the project finished?
No, the project is not finished. It was registered with TDLR in September 2026, and completion is targeted for March 2027. Plan review is still pending, and construction is scheduled to begin in November 2026.
Who is building the EV chargers?
Lorenz Perry is the owner of record, and Westwood Professional Services, Inc. is the design firm. Blair Baker is the registered accessibility specialist. The project is privately funded and located on private land.
How many EV chargers are being added?
The project is adding 16 electric vehicle chargers and the necessary electrical equipment to the existing surface parking lot at 301 1/2 N Lamar Blvd.
What is the cost per square foot?
The estimated cost is $600,000 for 11,380 sq ft, which equals $53 per square foot. This is below the Travis County median of $125 per square foot for similar new construction filings.
What is 219013 Austin Electric Vehicle Charging?
219013 Austin Electric Vehicle Charging is a new construction project at 301 1/2 N Lamar Blvd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adding 16 EV chargers and electrical equipment to an existing surface parking lot
Is 219013 Austin Electric Vehicle Charging open in Austin?
219013 Austin Electric Vehicle Charging is still under construction in Austin, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is 219013 Austin Electric Vehicle Charging located?
219013 Austin Electric Vehicle Charging is located at 301 1/2 N Lamar Blvd, Austin, TX, 78703, in Travis County.
Who is the owner or developer of 219013 Austin Electric Vehicle Charging?
Lorenz Perry is the property owner/developer of record for 219013 Austin Electric Vehicle Charging, per its TDLR project registration.
Who is the architect or design firm for 219013 Austin Electric Vehicle Charging?
Westwood Professional Services, Inc. is the design firm of record for 219013 Austin Electric Vehicle Charging, according to its TDLR filing.
How much does 219013 Austin Electric Vehicle Charging cost and how big is it?
219013 Austin Electric Vehicle Charging has an estimated construction value of $600K and approximately 11,380 square feet (about $53/sqft), based on its TDLR filing.
Scope of Work
Adding 16 EV chargers and electrical equipment to an existing surface parking lot
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
301 1/2 N Lamar Blvd, Austin, TX, 78703
Related Projects
Related City Permits
Building permits found at or near this location
Permanent Meter Loop for 8 x 10 equipment shed for communication equipment only.
Related Site Plans
City of Austin site plan approvals at this location
Watch all construction in 78703 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.