Project intelligenceTDLR TABS2026027673New Construction
Funding type

This project is privately funded, on private land for private use.

Dallas NetJets Campus - Terminal & Site

7515 Lemmon Avenue, Hangar E, Dallas, TX, 75209

Opening ~May 2028Project Registered

Dallas NetJets Campus - Terminal & Site is a new construction project at 7515 Lemmon Avenue, Hangar E, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2028. The project has an estimated value of $35.0M across about 80,000 sq ft.

Estimated project value
$35.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
80,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$438/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 12, 2026656 days across supplied datesMay 29, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    82 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    574 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Dallas NetJets Campus - Terminal & Site

Signature Flight Support LLC is constructing a new 80,000 sq ft aircraft hangar at 7515 Lemmon Avenue in Dallas. The project, designated as Hangar E within the Dallas NetJets Campus, involves the new construction of a pre-engineered metal building. The facility also includes 18,000 sq ft of associated shops and office space. The total estimated cost for this private development is $35,000,000.

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in August 2026. Construction is scheduled to begin in November 2026, with completion targeted for May 2028. The filing indicates that plan review is pending. This registration status reflects the current administrative stage of the project under state oversight.

Design and Construction Scope

Corgan Associates Inc serves as the design firm of record for the facility. The scope of work covers the entire new construction phase, including the primary hangar structure and the ancillary commercial spaces. The estimated cost of $438 per square foot is above the county median of $125 per square foot for similar new construction filings in Dallas County. The scheduled build window of 574 days is longer than the county median of 243 days.

Third-party reporting, including an article on privatejetcardcomparisons.com, identified the project as the Dallas NetJets Campus, noting that the new facility will be Hangar E. The project is privately funded and located on private land for private use. The site is located in Dallas County, specifically in the ZIP code 75209 area.

According to U.S. Census Bureau American Community Survey estimates for ZIP code 75209, the median household income is $126,121. The area contains approximately 14,359 residents and 7,498 housing units. The median owner-occupied home value in this region is $837,700. These figures provide demographic context for the location of the new aviation facility.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75209 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Dallas NetJets Campus - Terminal & Site is a New Construction project located at 7515 Lemmon Avenue, Hangar E, Dallas, TX 75209 in Dallas, Texas. The project has an estimated value of $35.0M covering 80,000 sq ft. Signature Flight Support LLC is the property owner and Corgan Associates Inc is the design firm of record. The project was registered with TDLR on August 12, 2026.

Frequently Asked Questions

What is the estimated cost of Hangar E?

The estimated cost for the new 80,000 sq ft hangar and associated space is $35,000,000. This figure is derived from the TDLR project filing for the Dallas NetJets Campus.

Who is the owner of the project?

Signature Flight Support LLC is the owner and developer of record. The project is part of the Dallas NetJets Campus development at 7515 Lemmon Avenue.

When is the project expected to be completed?

The completion date on the TDLR filing is targeted for May 2028. Construction is scheduled to start in November 2026, with plan review pending.

What firm designed the hangar?

Corgan Associates Inc is the design firm of record for the project. They are responsible for the architectural and design aspects of the new construction.

Is the hangar currently open for business?

The project is in the construction phase with a registration status of Project Registered. The facts provided do not indicate that the facility is open or operating.

What is Dallas NetJets Campus - Terminal & Site?

Dallas NetJets Campus - Terminal & Site is a new construction project at 7515 Lemmon Avenue, Hangar E in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of an 80,000 SF aircraft hangar pre-engineered metal building with an associated 18,000 SF of shops & office space.

Is Dallas NetJets Campus - Terminal & Site open in Dallas?

Dallas NetJets Campus - Terminal & Site is still under construction in Dallas, TX, with an estimated completion of May 2028 according to its TDLR registration.

Where is Dallas NetJets Campus - Terminal & Site located?

Dallas NetJets Campus - Terminal & Site is located at 7515 Lemmon Avenue, Hangar E, Dallas, TX, 75209, in Dallas County.

Who is the owner or developer of Dallas NetJets Campus - Terminal & Site?

Signature Flight Support LLC is the property owner/developer of record for Dallas NetJets Campus - Terminal & Site, per its TDLR project registration.

Who is the architect or design firm for Dallas NetJets Campus - Terminal & Site?

Corgan Associates Inc is the design firm of record for Dallas NetJets Campus - Terminal & Site, according to its TDLR filing.

How much does Dallas NetJets Campus - Terminal & Site cost and how big is it?

Dallas NetJets Campus - Terminal & Site has an estimated construction value of $35.0M and approximately 80,000 square feet (about $438/sqft), based on its TDLR filing.

Scope of Work

New construction of an 80,000 SF aircraft hangar pre-engineered metal building with an associated 18,000 SF of shops & office space.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7515 Lemmon Avenue, Hangar E, Dallas, TX, 75209

Loading location map…
32.84745, -96.83788

Watch all construction in 75209 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.