Funding type
This project is privately funded, on private land for private use.
FKC in Forney, TX
190 Trailhouse Lane, Forney, TX, 75126
FKC is a renovation/alteration project at 190 Trailhouse Lane, Forney, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $2.6M across about 10,510 sq ft.
- Estimated project value
- $2.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,510 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $245/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
93 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
160 days after the preceding date shown.
Source: TDLR filing
View source record
📰About FKC
FKC Forney is a $2,578,298 renovation project located at 190 Trailhouse Lane in Forney, Texas. The filing describes the work as an interior build-out of existing shell space to provide renal dialysis business services. The project is registered with TDLR in Kaufman County and is targeted for May 2027.
The scope of work involves converting the 10,510 sq ft facility into a dialysis center. The interior construction will utilize metal stud light gauge framing for the walls. The estimated cost of $2,578,298 translates to approximately $245 per square foot, a figure that is above the county median of $98 for similar renovation filings.
Project Details and Status
Forney Market Retail, LLC is the owner of record for this privately funded project. The design firm of record is Douglas C. McNab Architect. Brian Gary Stanton is the registered accessibility specialist associated with the filing. The project was registered with TDLR in August 2026, and the construction start date listed in the filing is December 2026.
The scheduled build window for this project is 160 days, which is longer than the 98-day median for renovation projects in Kaufman County. The facility name on the filing is Forney Marketplace.
Douglas C. McNab Architect has two other TDLR-registered projects totaling $4,630,254. These include a $2,500,000 project in Beaumont with review complete and a $2,130,254 project in Conroe that is closed. This project is one of 97 renovation or alteration registrations in Kaufman County in the last 24 months.
The area profile for ZIP code 75126 indicates a population of about 77,116 and a median household income of $104,001. The median owner-occupied home value in this Census area is $337,200. This project represents a significant commercial investment in the Forney area, focusing on healthcare services infrastructure.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75126 (Forney)
One email per change. Unsubscribe in one click. Privacy.
FKC is a Renovation/Alteration project located at 190 Trailhouse Lane, Forney, TX 75126 in Forney, Texas. The project has an estimated value of $2.6M covering 10,510 sq ft. Forney Market Retail, LLC is the property owner and Douglas C. McNab Architect is the design firm of record. The project was registered with TDLR on August 31, 2026.
Frequently Asked Questions
What is the primary purpose of the FKC Forney renovation?
The project is an interior build-out of existing shell space to provide business services for a renal dialysis center.
Who is the owner and design firm for this project?
Forney Market Retail, LLC is the owner of record, and Douglas C. McNab Architect is the design firm of record.
Is the FKC Forney dialysis center open?
The project is a construction registration targeted for May 2027 completion. The TDLR record does not confirm a business opening date or current operational status.
What is the estimated cost and size of the project?
The estimated cost is $2,578,298 for a 10,510 sq ft facility, resulting in a cost of $245 per square foot.
When is the construction scheduled to start and finish?
Construction is scheduled to start in December 2026, with completion targeted for May 2027.
What is FKC?
FKC is a renovation/alteration project at 190 Trailhouse Lane in Forney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build out of existing shell space for the purpose of providing business services of a renal dialysis. Interior walls shall be metal stud light gauge framing.
Is FKC open in Forney?
FKC is still under construction in Forney, TX, with an estimated completion of May 2027 according to its TDLR registration.
Where is FKC located?
FKC is located at 190 Trailhouse Lane, Forney, TX, 75126, in Kaufman County.
Who is the owner or developer of FKC?
Forney Market Retail, LLC is the property owner/developer of record for FKC, per its TDLR project registration.
Who is the architect or design firm for FKC?
Douglas C. McNab Architect is the design firm of record for FKC, according to its TDLR filing.
How much does FKC cost and how big is it?
FKC has an estimated construction value of $2.6M and approximately 10,510 square feet (about $245/sqft), based on its TDLR filing.
Scope of Work
Interior build out of existing shell space for the purpose of providing business services of a renal dialysis. Interior walls shall be metal stud light gauge framing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
190 Trailhouse Lane, Forney, TX, 75126
Related Projects
Same Design Firm
$7.2M totalWatch all construction in 75126 (Forney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Forney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.