Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Mount Gilead Road Reconstruction in Keller, TX
Mount Gilead Road, Keller, TX, 76248
Mount Gilead Road Reconstruction is a renovation/alteration project at Mount Gilead Road, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2029. The project has an estimated value of $510K across about 5,000 sq ft.
- Estimated project value
- $510K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $102/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 years
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
97 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
731 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Mount Gilead Road Reconstruction
The City of Keller is preparing to reconstruct a section of Mount Gilead Road in Tarrant County, converting the existing asphalt surface into a three-lane concrete roadway. This renovation and alteration project covers an estimated 5,000 sq ft and carries a total cost of $510,000. The work is registered with TDLR under the name Mount Gilead Road Reconstruction, with a scheduled start in January 2027 and completion targeted for January 2029.
The scope extends beyond pavement replacement to include significant infrastructure upgrades. The project will install new storm drainage, water lines, and sewer lines to support the expanded road capacity. Pedestrian amenities are a central component, featuring a proposed trail, sidewalk improvements, and American Public Systems (APS) push buttons to enhance accessibility for all users. These improvements align with the city's broader infrastructure goals in the Keller area.
Project Details and Comparisons
Kimley-Horn & Associates serves as the design firm of record for this initiative. The estimated cost of $510,000 places the project above the median estimated cost of $250,000 for similar renovation and alteration filings in Tarrant County. The cost per square foot is calculated at $102, which is above the county median of $79. The scheduled build window of 731 days is longer than the county median of 92 days, reflecting the complexity of replacing multiple utility systems simultaneously.
The City of Keller has six other TDLR-registered projects totaling $1,889,000, indicating a steady stream of municipal infrastructure work. This specific filing is registered with TDLR with plan review pending. The project involves public funds and public land, ensuring that public resources are directed toward critical road and utility maintenance in the community.
Residents and businesses in ZIP code 76248 can expect the construction to proceed according to the registered timeline. The project aims to improve traffic flow and safety while modernizing the underlying utility infrastructure. The collaboration between the city and Kimley-Horn & Associates ensures that the design meets current standards for durability and accessibility. The completion of this project will provide a more resilient roadway for the growing population of Keller.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76248 (Keller)
One email per change. Unsubscribe in one click. Privacy.
Mount Gilead Road Reconstruction is a Renovation/Alteration project located at Mount Gilead Road, Keller, TX 76248 in Keller, Texas. The project has an estimated value of $510K covering 5,000 sq ft. City of Keller is the property owner and Kimley-Horn & Associates is the design firm of record. The project was registered with TDLR on September 1, 2026.
Frequently Asked Questions
When is the Mount Gilead Road reconstruction targeted for completion?
The project is registered with TDLR with a completion date targeted for January 2029. Plan review is pending, and construction is scheduled to begin in January 2027.
What specific improvements are included in the Mount Gilead Road project scope?
The scope includes converting asphalt to three-lane concrete, upgrading storm drainage, water, and sewer lines, and adding a trail, sidewalk, and APS push buttons for pedestrian accessibility.
Who is the design firm for this City of Keller project?
Kimley-Horn & Associates is the design firm of record for the Mount Gilead Road Reconstruction project.
How does this project's cost compare to other similar projects in Tarrant County?
The $510,000 estimated cost is above the county median of $250,000 for renovation and alteration filings. The cost per square foot is also above the county median.
What is Mount Gilead Road Reconstruction?
Mount Gilead Road Reconstruction is a renovation/alteration project at Mount Gilead Road in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway reconstruction project turning asphalt road into 3 lane concrete section with upgraded storm drainage, water lines and sewer lines. Pedestrian facilities include proposed trail and sidewalk and APS push buttons
Is Mount Gilead Road Reconstruction open in Keller?
Mount Gilead Road Reconstruction is still under construction in Keller, TX, with an estimated completion of Jan 2029 according to its TDLR registration.
Where is Mount Gilead Road Reconstruction located?
Mount Gilead Road Reconstruction is located at Mount Gilead Road, Keller, TX, 76248, in Tarrant County.
Who is the owner or developer of Mount Gilead Road Reconstruction?
City of Keller is the property owner/developer of record for Mount Gilead Road Reconstruction, per its TDLR project registration.
Who is the architect or design firm for Mount Gilead Road Reconstruction?
Kimley-Horn & Associates is the design firm of record for Mount Gilead Road Reconstruction, according to its TDLR filing.
How much does Mount Gilead Road Reconstruction cost and how big is it?
Mount Gilead Road Reconstruction has an estimated construction value of $510K and approximately 5,000 square feet (about $102/sqft), based on its TDLR filing.
Scope of Work
Roadway reconstruction project turning asphalt road into 3 lane concrete section with upgraded storm drainage, water lines and sewer lines. Pedestrian facilities include proposed trail and sidewalk and APS push buttons
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Mount Gilead Road, Keller, TX, 76248
Related Projects
Same Owner
$1.5M totalWatch all construction in 76248 (Keller)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Keller?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.