This project is privately funded, on private land for private use.
Waffle House #20646
2210 Old Kemp Highway, Kaufman, TX 2210, Texas, TX
Waffle House #20646 is a new construction project at 2210 Old Kemp Highway, Kaufman, TX 2210, Texas, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $300K across about 1,840 sq ft.
- Estimated project value
- $300K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,840 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $163/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
21 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
337 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
181 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Waffle House #20646
A new Waffle House restaurant is under development at 2210 Old Kemp Highway in Kaufman, Texas. The project, filed as Waffle House #20646, involves the new construction of a 1,840 square foot facility. The estimated cost for this build is $300,000, which calculates to $163 per square foot. This single-story structure is being built on private land for private use.
Waffle House, Inc. is the owner of record for this development. The architectural design is attributed to Mark D. Pavey, AIA. Brian Gary Stanton is the registered accessibility specialist associated with the filing. The project is privately funded and located in Kaufman County.
Construction Timeline and Status
The project was registered with TDLR in September 2026. According to the filing, construction is scheduled to begin in September 2027. The completion date listed in the registration is targeted for February 2028. The current TDLR status is Project Registered, and plan review is pending.
Context and Comparisons
This development is one of several recent projects by Waffle House, Inc. The owner has six other TDLR-registered projects totaling $1,800,000, including locations in Waco, Splendora, Anna, Fort Worth, and Little Elm. The design firm, Mark D. Pavey, AIA, is also associated with six other registered projects, including a location in Kingwood. The scheduled build window for this Kaufman project is 181 days, which is shorter than the county median of 242 days for new construction.
The estimated cost of $300,000 is below the county median of $1,200,000 for new construction filings in Kaufman County. The cost per square foot of $163 is close to the county median of $144. The project size of 1,840 square feet is smaller than the county median of 8,500 square feet. These figures are derived from 652 TDLR-registered new construction filings in the county.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
One email per change. Unsubscribe in one click. Privacy.
Waffle House #20646 is a New Construction project located at 2210 Old Kemp Highway, Kaufman, TX 2210 in Texas. The project has an estimated value of $300K covering 1,840 sq ft. Waffle House, Inc. is the property owner and Mark D. Pavey, AIA - Architect is the design firm of record. The project was registered with TDLR on September 8, 2026.
Frequently Asked Questions
Is the Waffle House in Kaufman open?
The project is registered with TDLR and construction is targeted for February 2028. The record indicates plan review is pending and construction has not yet started. There is no information indicating the business is operating.
Who is building the new Waffle House in Kaufman?
Waffle House, Inc. is the owner of record. The design firm of record is Mark D. Pavey, AIA. Brian Gary Stanton is the registered accessibility specialist for the project.
What is the estimated cost of the Kaufman Waffle House?
The estimated cost for the new construction is $300,000. This works out to approximately $163 per square foot for the 1,840 square foot building.
When is construction scheduled to start?
According to the TDLR filing, construction is scheduled to begin in September 2027. The project was registered with TDLR in September 2026.
Is the site in a flood zone?
It is designated as zone X on the FEMA National Flood Hazard Layer.
What is Waffle House #20646?
Waffle House #20646 is a new construction project at 2210 Old Kemp Highway, Kaufman, TX 2210 in Texas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Restaurant
Is Waffle House #20646 open in Texas?
Waffle House #20646 is still under construction in Texas, TX, with an estimated completion of Feb 2028 according to its TDLR registration.
Where is Waffle House #20646 located?
Waffle House #20646 is located at 2210 Old Kemp Highway, Kaufman, TX 2210, Texas, TX, in Kaufman County.
Who is the owner or developer of Waffle House #20646?
Waffle House, Inc. is the property owner/developer of record for Waffle House #20646, per its TDLR project registration.
Who is the architect or design firm for Waffle House #20646?
Mark D. Pavey, AIA - Architect is the design firm of record for Waffle House #20646, according to its TDLR filing.
How much does Waffle House #20646 cost and how big is it?
Waffle House #20646 has an estimated construction value of $300K and approximately 1,840 square feet (about $163/sqft), based on its TDLR filing.
Scope of Work
New Restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2210 Old Kemp Highway, Kaufman, TX 2210, Texas, TX
Related Projects
Same Owner
$19.8M totalSame Design Firm
$1.2M totalKeep exploring
Keep exploring the area
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.