Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Clear Creek Trail
Clear Creek Trail, Pearland, TX, 77581
Clear Creek Trail is a new construction project at Clear Creek Trail, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $4.7M across about 15,000 sq ft.
- Estimated project value
- $4.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 15,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $313/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
203 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
141 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Clear Creek Trail
The City of Pearland is developing a new 15,000-square-foot trail system along Clear Creek Trail in Brazoria County. With an estimated cost of $4,700,000, this new construction project is registered with the Texas Department of Licensing and Regulation (TDLR) and is targeted for August 2027. The filing indicates a scheduled construction start in April 2027, creating a 141-day build window that is shorter than the 222-day median for similar new construction filings in the county.
HR Green serves as the design firm of record for this development. The scope of work includes a concrete trail, parking lot, pedestrian bridge, and related infrastructure such as drainage, excavation, and fill. The project also features bollards, a water line, and stormwater management components. Additional amenities include benches, litter and recycling receptacles, a bike repair station, a dog waste station, a water fountain, and shade structures.
The site is located within a FEMA Special Flood Hazard Area, specifically in zone AE which includes a floodway. This designation requires careful engineering and construction practices to manage water flow and protect the trail infrastructure. The project involves public funds and public land, reflecting the City of Pearland's investment in local recreational and accessibility improvements.
Project Context and Comparisons
The estimated cost of $4,700,000 places this project in the top quarter of new construction filings in Brazoria County, where the median estimated cost is $800,000. The cost per square foot is calculated at $313, which is above the county median of $117 per square foot. This higher cost per unit area reflects the specialized nature of the trail, bridge, and drainage work compared to standard building construction.
The City of Pearland has six other TDLR-registered projects totaling $35,056,349, including the Hickory Slough Sportsplex and Shadow Creek Parkway. HR Green has worked on six other registered projects totaling $125,670,493, such as the Kingsride, Barryknoll, and Gessner project in Houston. This Clear Creek Trail project is part of a broader pattern of infrastructure development in the region, with a focus on connectivity and public access.
Holly Respondek is the registered accessibility specialist for this project. The registration with TDLR occurred in September 2026, and the project status is listed as Project Registered. Plan review is pending as the schedule moves toward the April 2027 start date. The completion date on the filing is set for August 2027, providing a clear timeline for stakeholders and the public.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77581 (Pearland)
One email per change. Unsubscribe in one click. Privacy.
Clear Creek Trail is a New Construction project located at Clear Creek Trail, Pearland, TX 77581 in Pearland, Texas. The project has an estimated value of $4.7M covering 15,000 sq ft. City of Pearland is the property owner and HR Green is the design firm of record. The project was registered with TDLR on September 21, 2026.
Frequently Asked Questions
When is the Clear Creek Trail project expected to be completed?
The completion date on the TDLR filing is August 2027. Construction is scheduled to begin in April 2027, with a 141-day build window.
Who is the design firm for the Clear Creek Trail project?
HR Green is the design firm of record for this new construction project in Pearland, Texas.
What amenities are included in the Clear Creek Trail scope of work?
The scope includes a concrete trail, parking lot, pedestrian bridge, bike repair station, water fountain, shade structures, and drainage systems.
Is the Clear Creek Trail site in a flood zone?
Yes, the site is inside a FEMA Special Flood Hazard Area, specifically zone AE which includes a floodway.
What is the estimated cost of the Clear Creek Trail project?
The estimated cost is $4,700,000 for a 15,000-square-foot project, which equates to $313 per square foot.
What is Clear Creek Trail?
Clear Creek Trail is a new construction project at Clear Creek Trail in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete trail, parking lot, pedestrian bridge, and related drainage, excavation, fill, bollards, water line, swppp, bench, litter/recycle receptables, bike repair station, dog waste station, water fountain, shade structures, etc.
Is Clear Creek Trail open in Pearland?
Clear Creek Trail is still under construction in Pearland, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Clear Creek Trail located?
Clear Creek Trail is located at Clear Creek Trail, Pearland, TX, 77581, in Brazoria County.
Who is the owner or developer of Clear Creek Trail?
City of Pearland is the property owner/developer of record for Clear Creek Trail, per its TDLR project registration.
Who is the architect or design firm for Clear Creek Trail?
HR Green is the design firm of record for Clear Creek Trail, according to its TDLR filing.
How much does Clear Creek Trail cost and how big is it?
Clear Creek Trail has an estimated construction value of $4.7M and approximately 15,000 square feet (about $313/sqft), based on its TDLR filing.
Scope of Work
Concrete trail, parking lot, pedestrian bridge, and related drainage, excavation, fill, bollards, water line, swppp, bench, litter/recycle receptables, bike repair station, dog waste station, water fountain, shade structures, etc.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Clear Creek Trail, Pearland, TX, 77581
Related Projects
Same Owner
$5.6M totalWatch all construction in 77581 (Pearland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pearland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.