Funding type
This project is privately funded, on private land for private use.
Lone Tree Park Improvements
Lot 31X, Block A, Lone Tree, Van Alstyne, TX, 75495
Lone Tree Park Improvements is a new construction project at Lot 31X, Block A, Lone Tree, Van Alstyne, in Grayson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $3.8M across about 792 sq ft.
- Estimated project value
- $3.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 792 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $4.73K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
8 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
242 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Lone Tree Park Improvements
Lone Tree Park Improvements is a new construction project in Van Alstyne, Texas, featuring a 792-square-foot restroom facility alongside extensive outdoor amenities. The development is privately funded and located on private land within Lot 31X, Block A of the Lone Tree community in Grayson County. The project is registered with TDLR, with plan review pending and completion targeted for May 2027.
Scope and Cost
The filing details a comprehensive set of park improvements, including sports courts, soccer fields, a dog park, and a playground. The estimated total cost for this new construction is $3,750,000. This figure places the project above the median estimated cost for similar new construction filings in Grayson County, which stands at $925,000. The cost per square foot is calculated at $4,735, a figure that is significantly above the county median of $135 per square foot for new construction projects.
JBZ Lone Tree LLC is the owner and developer of record for this development. The firm has one other TDLR-registered project in Van Alstyne, known as Lone Tree Phase I, which has a total cost of $125,000 and has completed its review process. The design firm of record for the current improvements is the JVC Group. Casey Joe Anderson is the registered accessibility specialist associated with this filing.
Timeline and Local Context
Construction is scheduled to begin in October 2026, following the September 2026 registration with TDLR. The scheduled build window is 242 days, which is close to the county median build window of 242 days for new construction. The project is situated in ZIP code 75495, where the U.S. Census Bureau estimates the population at about 10,451 residents. The median household income in this area is estimated at $105,520, with a median owner-occupied home value of $353,500.
Grayson County’s unemployment rate was 4.6 percent a figure higher than a year earlier. The project’s status remains Project Registered, indicating that the official construction phase has not yet commenced. All financial and structural details are derived from the official TDLR filing for this specific accessibility project.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75495 (Van Alstyne)
One email per change. Unsubscribe in one click. Privacy.
Lone Tree Park Improvements is a New Construction project located at Lot 31X, Block A, Lone Tree, Van Alstyne, TX 75495 in Van Alstyne, Texas. The project has an estimated value of $3.8M covering 792 sq ft. JBZ Lone Tree LLC is the property owner and JVC Group is the design firm of record. The project was registered with TDLR on September 23, 2026.
Frequently Asked Questions
What is the estimated cost of the Lone Tree Park Improvements?
The estimated total cost for the new construction project is $3,750,000. This includes the 792-square-foot restroom facility and all associated outdoor amenities such as sports courts and playgrounds.
Who is the developer for this project in Van Alstyne?
JBZ Lone Tree LLC is the owner and developer of record. The JVC Group serves as the design firm, and Casey Joe Anderson is the registered accessibility specialist.
When is the construction expected to be finished?
Plan review is pending, and the project is targeted for May 2027. Construction is scheduled to start in October 2026, resulting in a 242-day build window.
Is the Lone Tree Park Improvements project currently open?
No, the project is not open. It is in the registration and plan review phase, with construction scheduled to begin in October 2026.
What amenities are included in the park improvements?
The scope includes sports courts, soccer fields, a dog park, a playground, and a 792-square-foot restroom facility. The project is privately funded on private land.
What is Lone Tree Park Improvements?
Lone Tree Park Improvements is a new construction project at Lot 31X, Block A, Lone Tree in Van Alstyne, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Park improvements including sports courts, soccer fields, dog park, playground, and 792 S.F. restroom facility.
Is Lone Tree Park Improvements open in Van Alstyne?
Lone Tree Park Improvements is still under construction in Van Alstyne, TX, with an estimated completion of May 2027 according to its TDLR registration.
Where is Lone Tree Park Improvements located?
Lone Tree Park Improvements is located at Lot 31X, Block A, Lone Tree, Van Alstyne, TX, 75495, in Grayson County.
Who is the owner or developer of Lone Tree Park Improvements?
JBZ Lone Tree LLC is the property owner/developer of record for Lone Tree Park Improvements, per its TDLR project registration.
Who is the architect or design firm for Lone Tree Park Improvements?
JVC Group is the design firm of record for Lone Tree Park Improvements, according to its TDLR filing.
How much does Lone Tree Park Improvements cost and how big is it?
Lone Tree Park Improvements has an estimated construction value of $3.8M and approximately 792 square feet (about $4.73K/sqft), based on its TDLR filing.
Scope of Work
Park improvements including sports courts, soccer fields, dog park, playground, and 792 S.F. restroom facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Lot 31X, Block A, Lone Tree, Van Alstyne, TX, 75495
Related Projects
Same Owner
$3.9M totalNearby Projects
Within 1 kmWatch all construction in 75495 (Van Alstyne)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Van Alstyne?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.