Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
MISD Poteet High School Addition and Renovation
3300 Poteet Drive, Mesquite, TX, 75150
MISD Poteet High School Addition and Renovation is a additions to existing building project at 3300 Poteet Drive, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2029. The project has an estimated value of $49.9M across about 5,000 sq ft.
- Estimated project value
- $49.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $9.98K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
213 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
853 days after the preceding date shown.
Source: TDLR filing
View source record
📰About MISD Poteet High School Addition and Renovation
The MISD Poteet High School Addition and Renovation project is registered with TDLR in Mesquite, Texas. The filing describes the construction of a storm shelter, the demolition of portable buildings, and the renovation of interior spaces including the cafeteria, corridors, and select classrooms. The project is targeted for August 2029.
Located at 3300 Poteet Drive in Dallas County, this development is owned by Mesquite ISD. The estimated cost of the project is $49,923,889 for a 5,000 sq ft addition to the existing building. This places the cost per square foot at $9,985, a figure that is above the county median of $161 per square foot for similar additions.
Design and Construction Details
Glenn|Partners serves as the design firm of record for this project. Marcela Abadi Rhoads is the registered accessibility specialist. The scheduled build window is 853 days, which is longer than the county median of 182 days for comparable filings. The project involves public funds and is registered with TDLR . Plan review is pending, and construction is scheduled to begin in May 2027.
Mesquite ISD has six other TDLR-registered projects totaling $108,596,641. These include the Mesquite High School project, valued at $51,977,579, and the Mesquite Employee Health Center, which is closed. The design firm, Glenn|Partners, has six other registered projects totaling $246,910,779, including the Gene Pike Middle School in Justin and the Middle School 7 in Haslet.
Local Context and Status
The project site is located in ZIP code 75150, which has a population of about 63,023. The median household income in this area is $65,985, and the median owner-occupied home value is $221,000. The Dallas County unemployment rate was 3.3 percent in July 2026, which is higher than a year earlier.
The project status is Project Registered. The completion date on the filing is August 2029, aligning with the targeted timeline. The scope includes specific renovations to existing interior spaces and the addition of safety infrastructure. The estimated cost is in the top quarter for additions to existing buildings in Dallas County.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75150 (Mesquite)
One email per change. Unsubscribe in one click. Privacy.
MISD Poteet High School Addition and Renovation is a Additions to Existing Building project located at 3300 Poteet Drive, Mesquite, TX 75150 in Mesquite, Texas. The project has an estimated value of $49.9M covering 5,000 sq ft. Mesquite ISD is the property owner and Glenn|Partners is the design firm of record. The project was registered with TDLR on September 30, 2026.
Frequently Asked Questions
When is the Poteet High School project targeted for completion?
The project is targeted for August 2029. Construction is scheduled to start in May 2027, with a total build window of 853 days.
What is the estimated cost of the Poteet High School addition?
The estimated cost is $49,923,889. This covers the 5,000 sq ft addition, storm shelter construction, and interior renovations.
Who is the owner and design firm for this project?
Mesquite ISD is the owner of record. Glenn|Partners is the design firm of record for the project.
What work is included in the scope of this project?
The scope includes the addition of a storm shelter, demolition of portable buildings, and renovation of the cafeteria, corridors, and select classrooms.
Is the Poteet High School project currently open for operations?
The TDLR record indicates the project is registered and targeted for completion in August 2029. It is not open as a completed facility.
What is MISD Poteet High School Addition and Renovation?
MISD Poteet High School Addition and Renovation is a additions to existing building project at 3300 Poteet Drive in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of Storm Shelter and demolition of portable buildings. Renovation of interior spaces including cafeteria, corridors, and select classrooms.
Is MISD Poteet High School Addition and Renovation open in Mesquite?
MISD Poteet High School Addition and Renovation is still under construction in Mesquite, TX, with an estimated completion of Aug 2029 according to its TDLR registration.
Where is MISD Poteet High School Addition and Renovation located?
MISD Poteet High School Addition and Renovation is located at 3300 Poteet Drive, Mesquite, TX, 75150, in Dallas County.
Who is the owner or developer of MISD Poteet High School Addition and Renovation?
Mesquite ISD is the property owner/developer of record for MISD Poteet High School Addition and Renovation, per its TDLR project registration.
Who is the architect or design firm for MISD Poteet High School Addition and Renovation?
Glenn|Partners is the design firm of record for MISD Poteet High School Addition and Renovation, according to its TDLR filing.
How much does MISD Poteet High School Addition and Renovation cost and how big is it?
MISD Poteet High School Addition and Renovation has an estimated construction value of $49.9M and approximately 5,000 square feet (about $9.98K/sqft), based on its TDLR filing.
Scope of Work
Addition of Storm Shelter and demolition of portable buildings. Renovation of interior spaces including cafeteria, corridors, and select classrooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3300 Poteet Drive, Mesquite, TX, 75150
Related Projects
Same Owner
$113.2M totalNearby Projects
Within 1 kmWatch all construction in 75150 (Mesquite)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mesquite?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.