Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
MISD Mesquite High School Addition and Renovation
300 Davis Street, Mesquite, TX, 75149
MISD Mesquite High School Addition and Renovation is a additions to existing building project at 300 Davis Street, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2029. The project has an estimated value of $52.0M across about 5,000 sq ft.
- Estimated project value
- $52.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $10.40K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
213 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
853 days after the preceding date shown.
Source: TDLR filing
View source record
📰About MISD Mesquite High School Addition and Renovation
The MISD Mesquite High School Addition and Renovation project is a major construction effort at 300 Davis Street in Mesquite, Texas. This initiative focuses on adding a storm shelter and relocating the main front entry, while also renovating interior spaces including counseling offices, the cafeteria, kitchen, corridors, and fine arts areas. The filing specifies an addition of 5,000 square feet to the existing building structure.
With an estimated cost of $51,977,579, this project represents a significant investment in the school's infrastructure. The registered owner of record is Mesquite ISD, which has six other TDLR-registered projects in the region totaling over $106 million. Glenn|Partners serves as the design firm of record, a practice that has worked on several large-scale educational facilities across Texas, including Poteet High School and Gene Pike Middle School.
Project Status and Timeline
The project was registered with TDLR in September 2026. According to the filing, plan review is pending, and construction is scheduled to begin in May 2027. The completion date on the filing is targeted for August 2029. This timeline reflects a scheduled build window of 853 days, which is longer than the county median of 182 days for similar additions to existing buildings.
The project involves public funds and public land. Marcela Abadi Rhoads is the registered accessibility specialist listed on the filing. The status is Project Registered, indicating that the project is in the early stages of the regulatory and construction process.
For context, the median estimated cost for additions to existing buildings in Dallas County is $637,894. This project's cost is above the county median for its type, placing it in the top quarter of similar filings. The calculated cost per square foot is $10,396, which is significantly above the county median of $161 per square foot. These figures reflect the specialized nature of the storm shelter addition and the extensive interior renovations involved.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75149 (Mesquite)
One email per change. Unsubscribe in one click. Privacy.
MISD Mesquite High School Addition and Renovation is a Additions to Existing Building project located at 300 Davis Street, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $52.0M covering 5,000 sq ft. Mesquite ISD is the property owner and Glenn|Partners is the design firm of record. The project was registered with TDLR on September 30, 2026.
Frequently Asked Questions
What is the estimated cost of the Mesquite High School addition?
The estimated cost for the MISD Mesquite High School Addition and Renovation project is $51,977,579. This figure covers the addition of 5,000 square feet, including the storm shelter and interior renovations.
When is the project targeted for completion?
The filing lists a completion date targeted for August 2029. Construction is scheduled to start in May 2027, following a period of plan review that began after registration in September 2026.
Who is the design firm for this project?
Glenn|Partners is the design firm of record for the Mesquite High School project. They are also responsible for other major educational projects in the region, such as Poteet High School and Gene Pike Middle School.
Is the Mesquite High School project in a flood zone?
It is designated as zone X on the National Flood Hazard Layer.
What is MISD Mesquite High School Addition and Renovation?
MISD Mesquite High School Addition and Renovation is a additions to existing building project at 300 Davis Street in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of Storm Shelter and relocation of front entry. Renovation of interior spaces including counseling offices, cafeteria, kitchen, corridors, and fine arts.
Is MISD Mesquite High School Addition and Renovation open in Mesquite?
MISD Mesquite High School Addition and Renovation is still under construction in Mesquite, TX, with an estimated completion of Aug 2029 according to its TDLR registration.
Where is MISD Mesquite High School Addition and Renovation located?
MISD Mesquite High School Addition and Renovation is located at 300 Davis Street, Mesquite, TX, 75149, in Dallas County.
Who is the owner or developer of MISD Mesquite High School Addition and Renovation?
Mesquite ISD is the property owner/developer of record for MISD Mesquite High School Addition and Renovation, per its TDLR project registration.
Who is the architect or design firm for MISD Mesquite High School Addition and Renovation?
Glenn|Partners is the design firm of record for MISD Mesquite High School Addition and Renovation, according to its TDLR filing.
How much does MISD Mesquite High School Addition and Renovation cost and how big is it?
MISD Mesquite High School Addition and Renovation has an estimated construction value of $52.0M and approximately 5,000 square feet (about $10.40K/sqft), based on its TDLR filing.
Scope of Work
Addition of Storm Shelter and relocation of front entry. Renovation of interior spaces including counseling offices, cafeteria, kitchen, corridors, and fine arts.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
300 Davis Street, Mesquite, TX, 75149
Related Projects
Same Owner
$113.2M totalNearby Projects
Within 1 kmWatch all construction in 75149 (Mesquite)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mesquite?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.