Project intelligenceTDLR TABS2027002500Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

The Stockyards & Cowtown in Dfw Airport, TX

2141 South International Parkway, Dfw Airport, TX, 75261

Opening ~Apr 2027Review Complete

The Stockyards & Cowtown is a additions to existing building project at 2141 South International Parkway, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $2.1M across about 5,156 sq ft.

Estimated project value
$2.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,156 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$412/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 1, 2026189 days across supplied datesApr 8, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    33 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    118 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About The Stockyards & Cowtown

Terminal F Tenant Improvement

A new 5,156 square foot tenant improvement is underway at Terminal F in Dfw Airport, located at 2141 South International Parkway. The project is registered with the Texas Department of Licensing and Regulation (TDLR) for Michael Taylor, doing business as MERA DFW LLC. The filing lists the broader development as The Stockyards & Cowtown. This addition to an existing building focuses on creating a food service establishment within the airport terminal.

Ideation Design Group serves as the design firm of record for this $2,125,000 undertaking. The scope of work includes the installation of commercial kitchen equipment, new finishes and furnishings, and upgrades to mechanical, electrical, and plumbing systems. Richard Todd Lozano is the registered accessibility specialist overseeing the TABS compliance aspects of the construction. The project is privately funded on private land for private use.

TDLR completed its plan review in November 2026, and construction is scheduled to finish in April 2027. Work on the site began in December 2026. The total estimated cost of $2,125,000 results in a cost per square foot of $412. This figure is above the county median of $174 per square foot for similar additions in Tarrant County, where the median estimated cost is $700,000.

The scheduled build window for this project is 118 days, which is shorter than the county median of 184 days. The owner of record is DFW International Airport, which has six other TDLR-registered projects totaling $6,323,500. Ideation Design Group also has six other registered projects totaling $2,723,500, including work at Dallas Love Field Airport and El Paso International Airport. Tarrant County unemployment was 4.1 percent in September 2026.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Dfw Airport)

One email per change. Unsubscribe in one click. Privacy.

The Stockyards & Cowtown is a Additions to Existing Building project located at 2141 South International Parkway, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $2.1M covering 5,156 sq ft. DFW International Airport is the property owner and Ideation Design Group is the design firm of record. The project was registered with TDLR on October 1, 2026.

Frequently Asked Questions

Who is the registered accessibility specialist for this project?

Richard Todd Lozano is the registered accessibility specialist for the Terminal F tenant improvement project at Dfw Airport.

What is the estimated cost per square foot?

The estimated cost is $2,125,000 for 5,156 square feet, resulting in a cost per square foot of $412.

When did construction start?

Construction started in December 2026, following the plan review completion in November 2026.

Is the food service establishment open?

The TDLR record covers construction only and does not record whether the business has started serving customers.

What is The Stockyards & Cowtown?

The Stockyards & Cowtown is a additions to existing building project at 2141 South International Parkway in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A NEW 5,156 SF TENANT IMPROVEMENT FOR A FOOD SERVICE ESTABLISHMENT. SCOPE OF WORK INCLUDES COMMERCIAL KITCHEN EQUIPMENT, NEW FINISHES AND FURNISHINGS, MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS

Is The Stockyards & Cowtown open in Dfw Airport?

The Stockyards & Cowtown is still under construction in Dfw Airport, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is The Stockyards & Cowtown located?

The Stockyards & Cowtown is located at 2141 South International Parkway, Dfw Airport, TX, 75261, in Tarrant County.

Who is the owner or developer of The Stockyards & Cowtown?

DFW International Airport is the property owner/developer of record for The Stockyards & Cowtown, per its TDLR project registration.

Who is the architect or design firm for The Stockyards & Cowtown?

Ideation Design Group is the design firm of record for The Stockyards & Cowtown, according to its TDLR filing.

How much does The Stockyards & Cowtown cost and how big is it?

The Stockyards & Cowtown has an estimated construction value of $2.1M and approximately 5,156 square feet (about $412/sqft), based on its TDLR filing.

Scope of Work

A NEW 5,156 SF TENANT IMPROVEMENT FOR A FOOD SERVICE ESTABLISHMENT. SCOPE OF WORK INCLUDES COMMERCIAL KITCHEN EQUIPMENT, NEW FINISHES AND FURNISHINGS, MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2141 South International Parkway, Dfw Airport, TX, 75261

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75261 (Dfw Airport)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dfw Airport?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.