Funding type
This project is privately funded, on private land for private use.
DFW - Terminal F - Nekter Juice Bar in Dfw Airport, TX
2655 South International Parkway, Dfw Airport, TX, 75261
DFW - Terminal F - Nekter Juice Bar is a renovation/alteration project at 2655 South International Parkway, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $650K across about 543 sq ft.
- Estimated project value
- $650K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 543 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.20K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
44 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
163 days after the preceding date shown.
Source: TDLR filing
View source record
📰About DFW - Terminal F - Nekter Juice Bar
DFW Terminal F Juice Bar Renovation
A $650,000 renovation for a 543 sq ft Nekter Juice Bar is underway at 2655 South International Parkway in DFW Airport, Tarrant County. This interior tenant finish-out involves finishes, millwork, equipment, and associated MEP modifications. The project is registered with TDLR and is targeted for May 2027. The owner of record is DFW International Airport, with Rouch Architects serving as the design firm. Richard Todd Lozano is the registered accessibility specialist for this filing.
This project represents a significant investment in a relatively small footprint. The estimated cost per square foot is $1197, which is substantially above the Tarrant County median of $79 for renovation or alteration filings. The county median estimated cost for similar projects is $250,000, and this project's $650,000 total places it in the top quarter of costs. The scheduled build window is 163 days, which is longer than the county median of 92 days.
Owner and Design Firm History
DFW International Airport has six other TDLR-registered projects totaling $7,798,500. These include multiple Terminal F projects in DFW Airport, a DFW Headquarters project with inspection complete, and a DFW International Airport project with review complete. This specific juice bar filing is privately funded on private land for private use.
Rouch Architects has six other TDLR-registered projects totaling $61,925,000. Notable filings include a $57,000,000 project for Simpson Manufacturing Co. Inc. in McKinney with review complete, a $2,175,000 project for Dallas Fort Worth International Airport with inspection complete, and a $250,000 project for Dallas Fort Worth International Airport that is project closed. The firm also has a $750,000 inspection complete project and an $850,000 review complete project for Dallas Love Field.
The project was registered with TDLR in October 2026. Plan review is pending, and construction start is scheduled for December 2026. The TDLR status is listed as Project Registered. This filing adds to the ongoing development within the airport's Terminal F complex, reflecting continued investment in passenger amenities and infrastructure improvements at the major Texas hub.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
DFW - Terminal F - Nekter Juice Bar is a Renovation/Alteration project located at 2655 South International Parkway, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $650K covering 543 sq ft. DFW International Airport is the property owner and Rouch Architects is the design firm of record. The project was registered with TDLR on October 26, 2026.
Frequently Asked Questions
Is the Nekter Juice Bar at DFW Airport open?
The TDLR record covers construction only and does not record whether the business has started serving customers. The project is targeted for May 2027, indicating construction is ongoing.
Who is the owner of this project?
The owner of record is DFW International Airport. The project is privately funded and located on private land for private use.
What is the cost per square foot?
The estimated cost is $650,000 for a 543 sq ft space, resulting in a cost per square foot of $1197.
Who is the design firm?
Rouch Architects is the design firm of record for this renovation and alteration project at the Dallas Fort Worth International Airport.
When does construction start?
According to the filing, construction start is scheduled for December 2026. The project was registered in October 2026.
What is DFW - Terminal F - Nekter Juice Bar?
DFW - Terminal F - Nekter Juice Bar is a renovation/alteration project at 2655 South International Parkway in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish-out of a 543 SF airport juice bar, including finishes, millwork, equipment, and associated MEP modifications.
Is DFW - Terminal F - Nekter Juice Bar open in Dfw Airport?
DFW - Terminal F - Nekter Juice Bar is still under construction in Dfw Airport, TX, with an estimated completion of May 2027 according to its TDLR registration.
Where is DFW - Terminal F - Nekter Juice Bar located?
DFW - Terminal F - Nekter Juice Bar is located at 2655 South International Parkway, Dfw Airport, TX, 75261, in Tarrant County.
Who is the owner or developer of DFW - Terminal F - Nekter Juice Bar?
DFW International Airport is the property owner/developer of record for DFW - Terminal F - Nekter Juice Bar, per its TDLR project registration.
Who is the architect or design firm for DFW - Terminal F - Nekter Juice Bar?
Rouch Architects is the design firm of record for DFW - Terminal F - Nekter Juice Bar, according to its TDLR filing.
How much does DFW - Terminal F - Nekter Juice Bar cost and how big is it?
DFW - Terminal F - Nekter Juice Bar has an estimated construction value of $650K and approximately 543 square feet (about $1.20K/sqft), based on its TDLR filing.
Scope of Work
Interior tenant finish-out of a 543 SF airport juice bar, including finishes, millwork, equipment, and associated MEP modifications.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2655 South International Parkway, Dfw Airport, TX, 75261
Related Projects
Same Owner
$4.9M totalSame Design Firm
$60.7M totalNearby Projects
Within 0.6 miWatch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.