Funding type
This project is privately funded, on private land for private use.
Silverleaf Phases 2 & 9 in Bastrop, TX
100 Waterford Blvd. Silverleaf Subdivision Phase 1, Bastrop, TX, 78612
Silverleaf Phases 2 & 9 is a new construction project at 100 Waterford Blvd. Silverleaf Subdivision Phase 1, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $10.0M across about 2,118,382 sq ft.
- Estimated project value
- $10.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,118,382 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $5/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
6 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
243 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Silverleaf Phases 2 & 9
Silverleaf Phases 2 & 9 is a new construction project in Bastrop, Texas, with a scope of 2,118,382.38 square feet. The project is located at 100 Waterford Blvd. in the Silverleaf Subdivision Phase 1, within Bastrop County. Atlantis WKA Bastrop, LLC is the owner of record for this development. The estimated cost for the project is $10,000,000, which calculates to $5 per square foot. This figure is below the county median of $157 per square foot for similar new construction filings in Bastrop County.
The project was registered with TDLR in October 2026. Plan review is pending, and the construction start date per the filing is October 2026. The completion date on the filing is targeted for June 2027. The scheduled build window of 243 days is close to the county median of 245 days for new construction projects in the area.
Design and Ownership
HR Green is the design firm of record for Silverleaf Phases 2 & 9. Elaine K Andersen is the registered accessibility specialist for the project. This is the second TDLR-registered project for Atlantis WKA Bastrop, LLC, which also has a project in Cedar Creek totaling $3,500,000 that has completed inspection. HR Green has six other TDLR-registered projects in the state, with a combined value of $122,736,226, including developments in Pearland, Tomball, and Houston.
The project is privately funded on private land for private use. The surrounding area, ZIP code 78612, has a population of about 19,830 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $90,925, and the median owner-occupied home value is $239,100. Housing in the area is predominantly owner-occupied, with 5,981 housing units recorded. The Bastrop County unemployment rate was 4 percent in August 2026, lower than a year earlier.
The estimated cost of $10,000,000 is above the county median of $1,000,000 for new construction filings in Bastrop County. This places the project in the top quarter of costs for its type in the region. The size of 2,118,382.38 square feet is significantly larger than the county median size of 10,800 square feet for similar projects. This scale indicates a major development effort within the Silverleaf Subdivision Phase 1 area.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78612 (Bastrop)
One email per change. Unsubscribe in one click. Privacy.
Silverleaf Phases 2 & 9 is a New Construction project located at 100 Waterford Blvd. Silverleaf Subdivision Phase 1, Bastrop, TX 78612 in Bastrop, Texas. The project has an estimated value of $10.0M covering 2,118,382 sq ft. Atlantis WKA Bastrop, LLC is the property owner and HR Green is the design firm of record. The project was registered with TDLR on October 9, 2026.
Frequently Asked Questions
When is Silverleaf Phases 2 & 9 expected to be finished?
The completion date on the TDLR filing is targeted for June 2027. Plan review is pending, and the project was registered in October 2026.
Who is the developer of Silverleaf Phases 2 & 9?
Atlantis WKA Bastrop, LLC is the owner and developer of record. HR Green is the design firm, and Elaine K Andersen is the registered accessibility specialist.
How much does Silverleaf Phases 2 & 9 cost?
The estimated cost is $10,000,000. This is $5 per square foot, which is below the Bastrop County median of $157 per square foot for new construction.
Is Silverleaf Phases 2 & 9 open to the public?
The project is under construction with a completion date targeted for June 2027. It is privately funded on private land for private use, so it is not a public facility.
Where is Silverleaf Phases 2 & 9 located?
The project is at 100 Waterford Blvd. in the Silverleaf Subdivision Phase 1, Bastrop, TX 78612. It is located in Bastrop County outside the FEMA floodplain zone X.
What is Silverleaf Phases 2 & 9?
Silverleaf Phases 2 & 9 is a new construction project at 100 Waterford Blvd. Silverleaf Subdivision Phase 1 in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2,118,382.38 SqFt
Is Silverleaf Phases 2 & 9 open in Bastrop?
Silverleaf Phases 2 & 9 is still under construction in Bastrop, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Who is the owner or developer of Silverleaf Phases 2 & 9?
Atlantis WKA Bastrop, LLC is the property owner/developer of record for Silverleaf Phases 2 & 9, per its TDLR project registration.
Who is the architect or design firm for Silverleaf Phases 2 & 9?
HR Green is the design firm of record for Silverleaf Phases 2 & 9, according to its TDLR filing.
How much does Silverleaf Phases 2 & 9 cost and how big is it?
Silverleaf Phases 2 & 9 has an estimated construction value of $10.0M and approximately 2,118,382 square feet (about $5/sqft), based on its TDLR filing.
Scope of Work
2,118,382.38 SqFt
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
100 Waterford Blvd. Silverleaf Subdivision Phase 1, Bastrop, TX, 78612
Related Projects
Same Owner
$13.5M totalRelated City Permits
Building permits found at or near this location
Express- Replace 10 windows in the property siding repair
200 amp service upgrade
2026/11/06 | Hunting themed invite only event #Greek
2026/11/06 | Hunting themed invite only event #Greek
2026/11/06 | Hunting themed invite only event #Greek
Watch all construction in 78612 (Bastrop)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Bastrop?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.