Silverado Trail Lanes 3 & 4 in Mckinney, TX
8720 Silverado Trail, Mckinney, TX, 75070
Silverado Trail Lanes 3 & 4 is a new construction project at 8720 Silverado Trail, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2028. The project has an estimated value of $4.7M across about 155,000 sq ft.
- Estimated project value
- $4.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 155,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $30/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
294 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
366 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Silverado Trail Lanes 3 & 4
Silverado Trail Lanes 3 & 4 Project Overview
The Silverado Trail Lanes 3 & 4 project involves new construction at 8720 Silverado Trail in Mckinney, Collin County. This development adds two additional travel lanes along Silverado Trail, including a new two-lane bridge and associated roadway improvements. The scope covers 155,000 sq ft of work with an estimated cost of $4,700,000. Xavier Pulido is the owner and developer of record for this infrastructure expansion.
Registration with the Texas Department of Licensing and Regulation (TDLR) occurred in November 2026, marking the official start of the accessibility compliance tracking for this site. The project is classified as new construction and involves public funds, public land, or is a Federally funded roadway project. Steven Schwartz serves as the registered accessibility specialist overseeing the TABS requirements for this specific filing.
Cost and Timeline Analysis
The estimated cost per square foot for this project is $30, which is below the Collin County median of $121 for new construction filings. However, the total estimated cost of $4,700,000 places this project above the county median of $800,000, positioning it in the top quarter of similar new construction projects in the area. The scheduled build window of 366 days is longer than the county median of 212 days.
Construction is scheduled to begin in September 2027, with the project targeted for September 2028. Plan review is pending as the project moves through its initial registration phase. This timeline reflects the complexity of adding roadway infrastructure and bridge construction in a developed area of Mckinney.
Collin County unemployment was reported at 4.1 percent in September 2026, lower than a year earlier. The surrounding ZIP code 75070 has a population of about 59,859 with a median household income of $106,549. Housing in the area is an even mix of owner- and renter-occupied units, with a median owner-occupied home value of $429,300. The TDLR status remains Project Registered, with no further completion updates beyond the targeted date.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75070 (Mckinney)
One email per change. Unsubscribe in one click. Privacy.
Silverado Trail Lanes 3 & 4 is a New Construction project located at 8720 Silverado Trail, Mckinney, TX 75070 in Mckinney, Texas. The project has an estimated value of $4.7M covering 155,000 sq ft. Xavier Pulido is the property owner. The project was registered with TDLR on November 11, 2026.
Frequently Asked Questions
Is the Silverado Trail Lanes 3 & 4 project open?
The TDLR record covers construction only and does not record whether the business has started serving customers. The project is targeted for September 2028.
Who is the owner of the Silverado Trail project?
Xavier Pulido is the owner and developer of record for this new construction project located in Mckinney, TX.
What is the estimated cost of this project?
The estimated cost is $4,700,000 for the construction of two additional travel lanes, a new bridge, and roadway improvements.
When does construction start?
Construction is scheduled to start in September 2027, following the TDLR registration in November 2026.
Who is the accessibility specialist?
Steven Schwartz is the registered accessibility specialist for this TABS project registered with TDLR.
What is Silverado Trail Lanes 3 & 4?
Silverado Trail Lanes 3 & 4 is a new construction project at 8720 Silverado Trail in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of two additional travel lanes along Silverado Trail, including a new two-lane bridge and associated roadway improvements.
Is Silverado Trail Lanes 3 & 4 open in Mckinney?
Silverado Trail Lanes 3 & 4 is still under construction in Mckinney, TX, with an estimated completion of Sep 2028 according to its TDLR registration.
Where is Silverado Trail Lanes 3 & 4 located?
Silverado Trail Lanes 3 & 4 is located at 8720 Silverado Trail, Mckinney, TX, 75070, in Collin County.
Who is the owner or developer of Silverado Trail Lanes 3 & 4?
Xavier Pulido is the property owner/developer of record for Silverado Trail Lanes 3 & 4, per its TDLR project registration.
How much does Silverado Trail Lanes 3 & 4 cost and how big is it?
Silverado Trail Lanes 3 & 4 has an estimated construction value of $4.7M and approximately 155,000 square feet (about $30/sqft), based on its TDLR filing.
Scope of Work
Construction of two additional travel lanes along Silverado Trail, including a new two-lane bridge and associated roadway improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
8720 Silverado Trail, Mckinney, TX, 75070
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 75070 (Mckinney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mckinney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.