Project intelligenceTDLR TABS2027005685Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Warehouse Subdivide in Austin, TX

2020 Rutland Dr Suite D, E, and G, Austin, TX, 78758

Opening ~Dec 2027Project Registered

Warehouse Subdivide is a renovation/alteration project at 2020 Rutland Dr Suite D, E, and G, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $499K across about 29,994 sq ft.

Estimated project value
$499K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
29,994 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$17/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 11, 2026415 days across supplied datesDec 31, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    82 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    333 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Warehouse Subdivide

Warehouse Subdivide is a renovation and alteration project located at 2020 Rutland Dr Suite D, E, and G in Austin, Travis County. The filing lists the facility name as Rutland Business Park. This work involves remodeling and demising three flex office and warehouse suites. The registered accessibility specialist for the project is Robert W Green. The total estimated cost for the scope of work is $499,000. The project covers 29,994 sq ft of space. This results in a cost per square foot of $17.

Project Timeline and Registration

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in November 2026. Plan review is pending at this stage. Construction is scheduled to begin in February 2027. The completion date on the filing is targeted for December 2027. The project is privately funded and situated on private land for private use. This registration confirms the project meets specific accessibility requirements under state law.

Design and Ownership Details

Austin 2013-2112 Properties Bk7 LLC is the owner and developer of record. Holder +Southwick Architects serves as the design firm of record. Holder +Southwick Architects has two other TDLR-registered projects totaling $998,000. These include Technology Business Park in Austin and Tech Corporate Center in Austin, both registered projects. The current project is one of these registered filings. The scope focuses on interior modifications to existing suites rather than new construction.

Comparative data from 15,168 TDLR-registered renovation/alteration filings in Travis County provides context for this project. The median estimated cost for similar work is $300,000. The middle half of costs ranges from $141,000 to $720,245. This project's cost is above the county median for its type. The median size for comparable projects is 3,795 sq ft. This project is significantly larger than the median size. The median cost per square foot is $104. This project's $17 per sq ft is below the county median. The median scheduled build window is 99 days. This project's scheduled build window of 333 days is longer than the county median of 99 days. The area profile for ZIP 78758 shows a population of about 50,592. The median household income is $69,019. There are 25,745 housing units in the area. The median owner-occupied home value is $419,300. Housing is predominantly renter-occupied. Travis County unemployment rate (FRED, September 2026) was 3.6 percent, lower than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78758 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Warehouse Subdivide is a Renovation/Alteration project located at 2020 Rutland Dr Suite D, E, and G, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $499K covering 29,994 sq ft. AUSTIN 2013-2112 PROPERTIES BK7 LLC is the property owner and HOLDER +SOUTHWICK ARCHITECTS is the design firm of record. The project was registered with TDLR on November 11, 2026.

Frequently Asked Questions

Is Warehouse Subdivide open for business?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project is targeted for December 2027, so the business status is not yet determined by the filing.

Who is the design firm for this project?

Holder +Southwick Architects is the design firm of record. They have two other registered projects in Austin totaling $998,000.

What is the total cost of the renovation?

The estimated cost for the renovation and alteration is $499,000. This covers 29,994 sq ft of space.

When does construction start?

Construction start per the filing is February 2027. The project was registered with TDLR in November 2026.

What is Warehouse Subdivide?

Warehouse Subdivide is a renovation/alteration project at 2020 Rutland Dr Suite D, E, and G in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel and demise to three flex office / warehouse suites.

Is Warehouse Subdivide open in Austin?

Warehouse Subdivide is still under construction in Austin, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is Warehouse Subdivide located?

Warehouse Subdivide is located at 2020 Rutland Dr Suite D, E, and G, Austin, TX, 78758, in Travis County.

Who is the owner or developer of Warehouse Subdivide?

AUSTIN 2013-2112 PROPERTIES BK7 LLC is the property owner/developer of record for Warehouse Subdivide, per its TDLR project registration.

Who is the architect or design firm for Warehouse Subdivide?

HOLDER +SOUTHWICK ARCHITECTS is the design firm of record for Warehouse Subdivide, according to its TDLR filing.

How much does Warehouse Subdivide cost and how big is it?

Warehouse Subdivide has an estimated construction value of $499K and approximately 29,994 square feet (about $17/sqft), based on its TDLR filing.

Scope of Work

Remodel and demise to three flex office / warehouse suites.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2020 Rutland Dr Suite D, E, and G, Austin, TX, 78758

Loading location map…
30.38000, -97.71448

Related City Permits

Building permits found at or near this location

2020 RUTLAND DR BLDG B
118 ft away

Installing internally illuminated channel letter wall sign for Champion Windows at this location from its previous location at 9104 Cameron Road.

FinalElectrical PermitWallFeb 2016
View Details
2016-018465 EP
2011 RUTLAND DR
140 ft away

New 8-0 x 5-0 internally illuminated cabinet wall sign for EMPIRE COUNTERTOPS on the front facade facing Rutland Drive.

FinalElectrical PermitWallAug 2016
View Details
2016-101448 EP
2011 RUTLAND DR
140 ft away

New internally illuminated channel letter wall sign for EMPIRE COUNTERTOPS with logo on the side facade (larger sign on the right hand side).

FinalElectrical PermitWallAug 2016
View Details
2016-101450 EP
2011 RUTLAND DR
140 ft away

New internally illuminated channel letter wall sign for EMPIRE COUNTERTOPS with logo on the side facade (smaller sign closest to Rutland).

FinalElectrical PermitWallAug 2016
View Details
2016-101449 EP
2007 RUTLAND DR
145 ft away

New Resid Elec Srv Only Eud

ExpiredElectrical PermitRemodelSep 2015
View Details
2000-000239 EP
Austin Lanehart Electric Co., Inc.

Watch all construction in 78758 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.