Emory, TX Construction Projects

What's being built in Emory — 30 projects on file from Texas public records

30
Total Projects
$26.0M
Total Investment
20
New Construction
10
Renovations
117K
Total Sq Ft
$867K
Avg. Value

What is being built in Emory, Texas?

Emory, Texas has 30 construction and development projects on file worth $26.0M — 20 new construction and 10 renovations or remodels. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

What new businesses are coming to Emory?

The most recently filed new-construction projects in Emory are Hanby Insurance ($450K), Edward Jones - Emory ($450K), Convenience Store & Retail Shops & Car Wash ($1.5M), Baileys Express Car Wash ($1.9M). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens, so this list leads street-level visibility rather than following it.

Rains County Economy

Driving Emory construction · FRED

Unemployment:4.6%
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 30 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Emory
Estimated construction value$26MSum of 30 shown records with value
Records in view30 / 30Ready to inspect and compare
Largest record’s share11.5%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value · Smaller records grouped
Emory

Comparisons use only these 30 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

Construction & Development in Emory, Texas

Emory is experiencing significant construction and development activity with 30 registered projects valued at $26.0M. The city's development portfolio includes 20 new construction projects and 10 renovation projects, representing 116,848 square feet of built space across commercial, residential, and mixed-use developments.

Development Activity

  • 20 new construction projects (67%)
  • 10 renovation/remodel projects (33%)
  • Average project value: $867K

Key Players

Emory's construction market features 5 major property owners and 5 active design firms driving development across the city.

Leading developers include Emory Baptist Church and Rains County, working with architecture firms such as Acheson Architecture, LLC and SC Architecture.

Our database tracks all TDLR-registered construction projects in Emory. Projects span Rains counties, providing comprehensive coverage of commercial construction, residential development, and infrastructure improvements throughout Emory and the surrounding area.

All Projects

30 TDLR · 0 Site Plans

Showing 20 of 30 listed TDLR filings

Review Complete
$1.3M

Emory Renovations

650 E Lennon Dr, Emory, TX 75440

7,035 sqftAug 20, 2024
Closed
$500K

Quick Save Liquor

401 West Lennon Drive; #B, Emory, TX 75440

2,880 sqftJul 18, 2023
Closed
$1.0M

Blazin Pizza

386 E Lennon Ave, Emory, TX 75440

4,700 sqftFeb 24, 2022
Closed
$950K

New Bank Branch

105 Tawakoni Drive, Emory, TX 75440

3,265 sqftOct 6, 2020

Emory construction questions

How many construction projects are there in Emory, Texas?
There are 30 registered construction projects in Emory, Texas with a total estimated value of $26.0M and 116,848 square feet of development. The average project is valued at $867K.
What kind of construction is happening in Emory?
Emory has 20 new construction projects (67%) and 10 renovation or remodel projects (33%) on file, together totaling 116,848 square feet. Work spans commercial, residential and mixed-use development.
Who is building in Emory?
The most active property owners on file in Emory are Emory Baptist Church, Rains County, City National Bank of Sulphur Springs. The architecture and design firms appearing most often on Emory filings are Acheson Architecture, LLC, SC Architecture, Harris Craig Architects, Inc..
Where does this Emory construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.

Figures on this page are counted from the Emory filings themselves and change as new records are registered. How Zabalist sources Texas construction records.